# Check a standing seam roof quote

> Paste a standing seam roof quote and read it against your own measurements: the lines it leaves out, the ones it adds, the quantities outside the…

Page: https://craftquantities.com/check/standing-seam-roof-quote/ (quote check). This is the page's Markdown copy; the HTML page is the canonical version.

Each line read against your measurements: 3 lines, 3 measurements. Quantities, never prices.

Step 1

## Your measurements

Measured this job on the [standing seam metal roof takeoff](https://craftquantities.com/build/standing-seam-roof/)? Send it to My Project, or save a setup, and these boxes fill in one press.

Worked from Eave length (one slope) 40 ft · Rafter length 19.5 ft · Matching slopes (1 or 2) 2 (US customary) / Eave length (one slope) 12.2 m · Rafter length 6 m · Matching slopes (1 or 2) 2 (metric)

How to take each of these, and what each one feeds, is under the same field on the [standing seam metal roof takeoff](https://craftquantities.com/build/standing-seam-roof/).

Step 2 · Your quote

## The standing seam roof quote you were given

Paste from an email, or open or drop a PDF, Excel, CSV or text file, or a photo of the quote. Amounts of money are taken out before anything is read — this page compares quantities, never prices.

Nothing you paste or open leaves this device.

or one the job needs:

Step 3 · The reading

## What the quote says, against the job

Standing seam roof · Eave length (one slope) 40 ft · Rafter length 19.5 ft · Matching slopes (1 or 2) 2 (US customary) / Eave length (one slope) 12.2 m · Rafter length 6 m · Matching slopes (1 or 2) 2 (metric)

- What it leaves out

  Every line the job needs that nothing on the quote reads as, with the quantity your measurements produce.
- What it adds

  Lines this job's takeoff does not measure — labour, removal, hire, fees, anything else — each named for what it is.
- What sits outside the range

  Quantities above or below the computed range, by how much, in the quote's unit or converted and shown.
- What to ask

  One list of questions, in the quote's order, ready to copy and send. Questions, never a verdict.

Paste the quote above, or add its lines one at a time. The reading appears here as each line is read.

### Outside what this takeoff measures

5

Nothing in the reading measures these. Whether the quote covers each is worth asking in its own right: a scope missing from a quote tends to become a cost after work has started. Why each is left out is on the [takeoff](https://craftquantities.com/build/standing-seam-roof/).

- Flashings, closures, ridge and eave trims, and every penetration
- The clip spacing your wind zone actually requires, which is a tested assembly rather than a default
- Snow retention, which is designed from the slope, the panel and the ground snow load
- The substrate and its ability to hold the clip fastener
- Panel finish, coating warranty and the compatibility of every metal it touches

No quote read yet

[Open the takeoff](https://craftquantities.com/build/standing-seam-roof/)

Paste a quote

## The job

Eave length (one slope) 40 ft · Rafter length 19.5 ft · Matching slopes (1 or 2) 2 (US customary) / Eave length (one slope) 12.2 m · Rafter length 6 m · Matching slopes (1 or 2) 2 (metric)

## What the job needs

For these measurements, by the site’s calculators.

_US customary:_

- Panel clips, first slope at least 297 clips
- Panel clips, second slope at least 297 clips
- Roof underlayment, every slope 2 rolls

_metric:_

- Panel clips, first slope at least 297 clips
- Panel clips, second slope at least 297 clips
- Roof underlayment, every slope 2 rolls

More than one quote

## Level the quotes side by side

Two to six standing seam roof quotes, each read against this job: included, left out, excluded or added, line by line.

Kept on this device**Figures**The page's opening**Units**Imperial Quantities only, never prices

## How the quote is read

Each line of a standing seam roof quote is matched to the line of the job it names, or marked as something the [Standing seam metal roof takeoff](https://craftquantities.com/build/standing-seam-roof/) does not measure — labour, removal, hire, fees, or anything else.

The job’s own figures come from 3 measurements — eave length (one slope), rafter length, matching slopes (1 or 2) — run through the same calculators as the takeoff, so the two give the same figure for the same job.

## Reading a standing seam roof quote

Standing seam panels are made to length, so a quote lists panels and their length rather than squares. On a plain gable this takeoff counts each slope's panels and clips on a line of its own, so hold a whole-roof quote against the two lines added together; a roof with more slopes, or with slopes of unequal size, has each of them measured separately here.

The clip count follows the clip spacing, which tightens in a high-wind zone, so a quote with more clips is working to a stricter spacing. The panels expand and contract along their length, which is why the clips slide and why the panels are never fixed through their face.

## Three steps

1. Give your measurements, or fill them from your own takeoff in one press. The page opens on a typical job so it has something to show.
2. Paste the quote's lines as they came, or add them one at a time. Leave the prices in — they are taken out, never read.
3. Read the report: what is left out, what is added, what sits outside the range, and one list of questions to send.

The reference

## Every line the reading looks for

For Eave length (one slope) 40 ft · Rafter length 19.5 ft · Matching slopes (1 or 2) 2 (US customary) / Eave length (one slope) 12.2 m · Rafter length 6 m · Matching slopes (1 or 2) 2 (metric). Each is the calculator linked under it, run with those measurements; a range is that calculator at both ends of one choice, not a margin for error.

_US customary:_

- Panel clips, first slope

  at least 297 clips

  The fewest clips the clip spacing allows for one slope on each line; a quote for the whole roof carries every slope, and closer clips are a choice, often made for wind.

  [Open the Standing Seam Metal Roof Clip Count Calculator](https://craftquantities.com/calculators/materials-quantities/standing-seam-clip-count-calculator/)
- Panel clips, second slope

  at least 297 clips

  The fewest clips the clip spacing allows for one slope on each line; a quote for the whole roof carries every slope, and closer clips are a choice, often made for wind.

  [Open the Standing Seam Metal Roof Clip Count Calculator](https://craftquantities.com/calculators/materials-quantities/standing-seam-clip-count-calculator/)
- Roof underlayment, every slope

  2 rolls

  One figure, with the overlap allowance the material needs already inside it at 10%.

  [Open the Roofing Underlayment Calculator](https://craftquantities.com/calculators/renovation-construction/roofing-underlayment-calculator/)
- Standing seam panels, first slope

  27 panels per slope

  Worked out, not compared with a quote

  Panels for one slope on each line; a quote states the whole roof in one figure, so a single line is not compared with it.

  [Open the Metal Roof Panel Calculator](https://craftquantities.com/calculators/renovation-construction/metal-roof-panel-calculator/)
- Standing seam panels, second slope

  27 panels per slope

  Worked out, not compared with a quote

  Panels for one slope on each line; a quote states the whole roof in one figure, so a single line is not compared with it.

  [Open the Metal Roof Panel Calculator](https://craftquantities.com/calculators/renovation-construction/metal-roof-panel-calculator/)
- Standing Seam Roof Thermal Movement

  0.32 in

  Worked out, not compared with a quote

  How far the panels move with temperature, which is what the clip detail is designed for.

  [Open the Standing Seam Roof Thermal Movement Calculator](https://craftquantities.com/calculators/materials-quantities/standing-seam-thermal-movement-calculator/)

_metric:_

- Panel clips, first slope

  at least 297 clips

  The fewest clips the clip spacing allows for one slope on each line; a quote for the whole roof carries every slope, and closer clips are a choice, often made for wind.

  [Open the Standing Seam Metal Roof Clip Count Calculator](https://craftquantities.com/calculators/materials-quantities/standing-seam-clip-count-calculator/)
- Panel clips, second slope

  at least 297 clips

  The fewest clips the clip spacing allows for one slope on each line; a quote for the whole roof carries every slope, and closer clips are a choice, often made for wind.

  [Open the Standing Seam Metal Roof Clip Count Calculator](https://craftquantities.com/calculators/materials-quantities/standing-seam-clip-count-calculator/)
- Roof underlayment, every slope

  2 rolls

  One figure, with the overlap allowance the material needs already inside it at 10%.

  [Open the Roofing Underlayment Calculator](https://craftquantities.com/calculators/renovation-construction/roofing-underlayment-calculator/)
- Standing seam panels, first slope

  27 panels per slope

  Worked out, not compared with a quote

  Panels for one slope on each line; a quote states the whole roof in one figure, so a single line is not compared with it.

  [Open the Metal Roof Panel Calculator](https://craftquantities.com/calculators/renovation-construction/metal-roof-panel-calculator/)
- Standing seam panels, second slope

  27 panels per slope

  Worked out, not compared with a quote

  Panels for one slope on each line; a quote states the whole roof in one figure, so a single line is not compared with it.

  [Open the Metal Roof Panel Calculator](https://craftquantities.com/calculators/renovation-construction/metal-roof-panel-calculator/)
- Standing Seam Roof Thermal Movement

  8.28 mm

  Worked out, not compared with a quote

  How far the panels move with temperature, which is what the clip detail is designed for.

  [Open the Standing Seam Roof Thermal Movement Calculator](https://craftquantities.com/calculators/materials-quantities/standing-seam-thermal-movement-calculator/)

## How the ranges are taken

Where the choice is cutting waste, the ends are the site’s own allowances: 5%, the tight buffer of a crew with a planned set-out, and 15%, the wider one a first-timer orders. Where the calculator decides between patterns or materials, the ends are the options it offers. Where it adds nothing for loss, the range runs from the net quantity to 15% over it.

A minimum — the fewest hangers a spacing allows, the least airflow a room needs — has no upper end. A single figure carries an allowance the material itself needs, such as a lap, and names it.

## What a reading like this cannot see

- It does not know your prices, your market, or what the work ought to cost.
- It does not know the building — the access, the condition of what is there, or what has to happen first.
- It cannot check a lump sum, because there is no quantity in one.
- A line it reads as missing may be priced under another name. A quantity outside the range is not evidence of anything. Each is a reason to ask a question.
- Two quotes are not comparable until their scopes are.
- It is not advice, and it is no substitute for a second quote.

The full takeoff

## Every quantity for this job, with its working

The Standing seam metal roof takeoff runs the same calculators on the same measurements and shows what sits under each line here.

- [Open the takeoff](https://craftquantities.com/build/standing-seam-roof/)
- [Every quote check](https://craftquantities.com/check/)

- Base, allowance, order

  Each line's quantity before and after its allowance, and what to buy.
- Every allowance editable

  Change a waste figure and the order follows, with its source named.
- Into a project

  Add the whole job to a workspace with your own prices.

## Frequently asked questions

**What quantities does a standing seam roof job need?**

It depends on the measurements, so this page asks for yours. At the size it opens on — Eave length (one slope) 12.2 m · Rafter length 6 m · Matching slopes (1 or 2) 2 — the lines come to: Panel clips, first slope, 297 clips; Panel clips, second slope, 297 clips; Roof underlayment, every slope, 2 rolls. In imperial units — Eave length (one slope) 40 ft · Rafter length 19.5 ft · Matching slopes (1 or 2) 2 — they come to: Panel clips, first slope, 297 clips; Panel clips, second slope, 297 clips; Roof underlayment, every slope, 2 rolls.

**What does a standing seam roof quote often leave out?**

The reading names every line of the job that nothing on the quote reads as — any of the 3 lines the takeoff measures. The takeoff also lists 5 things it does not measure, shown under the reading, and each is worth asking about: a scope missing from a quote tends to become a cost after work has started.

**Can I paste the quote exactly as it came?**

Yes — from an email, a PDF or a spreadsheet, one item to a line. Amounts of money are taken out before anything is read, headings and totals are skipped, and each line is shown with what it was read as, so a misreading is one correction. Quantities in the other unit system are converted and the conversion is shown; a count of boxes is never compared with a count of tiles.

**Does this check the price as well?**

No. It reads quantities, never prices, and this site publishes none: an installed price moves with the market, the season, the access and the specification, so a figure for what the work ought to cost would give you confidence in a number nobody can defend. A quantity against your own measurements is checkable, and every figure here links to the calculator that produced it.

---
Source: https://craftquantities.com/check/standing-seam-roof-quote/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.
