# Check a shower enclosure quote

> Paste a shower enclosure quote and read it against your own measurements: the lines it leaves out, the ones it adds, the quantities outside the computed…

Page: https://craftquantities.com/check/shower-enclosure-quote/ (quote check). This is the page's Markdown copy; the HTML page is the canonical version.

Each line read against your measurements: 4 lines, 8 measurements. Quantities, never prices.

Step 1

## Your measurements

Measured this job on the [shower enclosure takeoff](https://craftquantities.com/build/shower-enclosure/)? Send it to My Project, or save a setup, and these boxes fill in one press.

Worked from Tiled wall run 9 ft · Tiled height 6.5 ft · Tray width 3 ft · Tray depth 3 ft · Tanked wall run 9 ft · Tanked height 6.5 ft · Internal corners in the tanked zone 2 · Pipe penetrations through the membrane 3 (US customary) / Tiled wall run 2.7 m · Tiled height 2 m · Tray width 0.9 m · Tray depth 0.9 m · Tanked wall run 2.7 m · Tanked height 2 m · Internal corners in the tanked zone 2 · Pipe penetrations through the membrane 3 (metric)

How to take each of these, and what each one feeds, is under the same field on the [shower enclosure takeoff](https://craftquantities.com/build/shower-enclosure/).

Step 2 · Your quote

## The shower enclosure quote you were given

Paste from an email, or open or drop a PDF, Excel, CSV or text file, or a photo of the quote. Amounts of money are taken out before anything is read — this page compares quantities, never prices.

Nothing you paste or open leaves this device.

or one the job needs:

Step 3 · The reading

## What the quote says, against the job

Shower enclosure · Tiled wall run 9 ft · Tiled height 6.5 ft · Tray width 3 ft · Tray depth 3 ft · Tanked wall run 9 ft · Tanked height 6.5 ft · Internal corners in the tanked zone 2 · Pipe penetrations through the membrane 3 (US customary) / Tiled wall run 2.7 m · Tiled height 2 m · Tray width 0.9 m · Tray depth 0.9 m · Tanked wall run 2.7 m · Tanked height 2 m · Internal corners in the tanked zone 2 · Pipe penetrations through the membrane 3 (metric)

- What it leaves out

  Every line the job needs that nothing on the quote reads as, with the quantity your measurements produce.
- What it adds

  Lines this job's takeoff does not measure — labour, removal, hire, fees, anything else — each named for what it is.
- What sits outside the range

  Quantities above or below the computed range, by how much, in the quote's unit or converted and shown.
- What to ask

  One list of questions, in the quote's order, ready to copy and send. Questions, never a verdict.

Paste the quote above, or add its lines one at a time. The reading appears here as each line is read.

### Outside what this takeoff measures

5

Nothing in the reading measures these. Whether the quote covers each is worth asking in its own right: a scope missing from a quote tends to become a cost after work has started. Why each is left out is on the [takeoff](https://craftquantities.com/build/shower-enclosure/).

- The tray, former, screen, door and waste
- The fall in the floor, which a tray sets and a wet room has to be built into
- Grout as an order
- Any pipework, valve or thermostatic mixer behind the wall
- Primer, which absorbent substrates need and cement backer board often does not; apply the maker's rate to the tanked area in the tanking row's breakdown

No quote read yet

[Open the takeoff](https://craftquantities.com/build/shower-enclosure/)

Paste a quote

## The job

Tiled wall run 9 ft · Tiled height 6.5 ft · Tray width 3 ft · Tray depth 3 ft · Tanked wall run 9 ft · Tanked height 6.5 ft · Internal corners in the tanked zone 2 · Pipe penetrations through the membrane 3 (US customary) / Tiled wall run 2.7 m · Tiled height 2 m · Tray width 0.9 m · Tray depth 0.9 m · Tanked wall run 2.7 m · Tanked height 2 m · Internal corners in the tanked zone 2 · Pipe penetrations through the membrane 3 (metric)

## What the job needs

For these measurements, by the site’s calculators.

_US customary:_

- Wet Room Tanking and Waterproof Membrane 3.4–3.91 gal
- Tile Backer Board 6–7 boards
- Tile & Grout 62–68 tiles
- Thinset & Tile Adhesive 2–3 bags

_metric:_

- Wet Room Tanking and Waterproof Membrane 13–15 litres
- Tile Backer Board 6–7 boards
- Tile & Grout 63–69 tiles
- Thinset & Tile Adhesive 2–3 bags

More than one quote

## Level the quotes side by side

Two to six shower enclosure quotes, each read against this job: included, left out, excluded or added, line by line.

Kept on this device**Figures**The page's opening**Units**Imperial Quantities only, never prices

## How the quote is read

Each line of a shower enclosure quote is matched to the line of the job it names, or marked as something the [Shower enclosure takeoff](https://craftquantities.com/build/shower-enclosure/) does not measure — labour, removal, hire, fees, or anything else.

The job’s own figures come from 8 measurements — tiled wall run, tiled height, tray width, tray depth, tanked wall run, tanked height, internal corners in the tanked zone, pipe penetrations through the membrane — run through the same calculators as the takeoff, so the two give the same figure for the same job.

## Reading a shower enclosure quote

A shower quote is clearest when it lists the waterproofing apart from the tiling, because the membrane is the layer that decides whether everything on top of it lasts.

The membrane is sold by the tub and applied in coats, and how many coats is worth asking. The tile count depends on the wall run and the height tiled, so both need to be the same on every quote being compared.

## Three steps

1. Give your measurements, or fill them from your own takeoff in one press. The page opens on a typical job so it has something to show.
2. Paste the quote's lines as they came, or add them one at a time. Leave the prices in — they are taken out, never read.
3. Read the report: what is left out, what is added, what sits outside the range, and one list of questions to send.

The reference

## Every line the reading looks for

For Tiled wall run 9 ft · Tiled height 6.5 ft · Tray width 3 ft · Tray depth 3 ft · Tanked wall run 9 ft · Tanked height 6.5 ft · Internal corners in the tanked zone 2 · Pipe penetrations through the membrane 3 (US customary) / Tiled wall run 2.7 m · Tiled height 2 m · Tray width 0.9 m · Tray depth 0.9 m · Tanked wall run 2.7 m · Tanked height 2 m · Internal corners in the tanked zone 2 · Pipe penetrations through the membrane 3 (metric). Each is the calculator linked under it, run with those measurements; a range is that calculator at both ends of one choice, not a margin for error.

_US customary:_

- Wet Room Tanking and Waterproof Membrane

  3.4–3.91 gal

  The membrane is bought by the tub and applied in coats, and a rough or porous substrate takes more than its rated coverage. 3.4 net, 3.91 with 15% added.

  [Open the Wet Room Tanking and Waterproof Membrane Calculator](https://craftquantities.com/calculators/materials-quantities/wet-room-tanking-calculator/)
- Tile Backer Board

  6–7 boards

  6 at 5% cutting waste, 7 at 15%.

  [Open the Tile Backer Board Calculator](https://craftquantities.com/calculators/renovation-construction/backer-board-calculator/)
- Tile & Grout

  62–68 tiles

  62 at 5% waste factor, 68 at 15%.

  [Open the Tile & Grout Calculator](https://craftquantities.com/calculators/renovation-construction/tile-grout-calculator/)
- Thinset & Tile Adhesive

  2–3 bags

  Adhesive is mixed by the bag, and whatever goes off in the bucket is not used. 2 net, 3 with 15% added.

  [Open the Thinset & Tile Adhesive Calculator](https://craftquantities.com/calculators/renovation-construction/thinset-mortar-calculator/)

_metric:_

- Wet Room Tanking and Waterproof Membrane

  13–15 litres

  The membrane is bought by the tub and applied in coats, and a rough or porous substrate takes more than its rated coverage. 13 net, 15 with 15% added.

  [Open the Wet Room Tanking and Waterproof Membrane Calculator](https://craftquantities.com/calculators/materials-quantities/wet-room-tanking-calculator/)
- Tile Backer Board

  6–7 boards

  6 at 5% cutting waste, 7 at 15%.

  [Open the Tile Backer Board Calculator](https://craftquantities.com/calculators/renovation-construction/backer-board-calculator/)
- Tile & Grout

  63–69 tiles

  63 at 5% waste factor, 69 at 15%.

  [Open the Tile & Grout Calculator](https://craftquantities.com/calculators/renovation-construction/tile-grout-calculator/)
- Thinset & Tile Adhesive

  2–3 bags

  Adhesive is mixed by the bag, and whatever goes off in the bucket is not used. 2 net, 3 with 15% added.

  [Open the Thinset & Tile Adhesive Calculator](https://craftquantities.com/calculators/renovation-construction/thinset-mortar-calculator/)

## How the ranges are taken

Where the choice is cutting waste, the ends are the site’s own allowances: 5%, the tight buffer of a crew with a planned set-out, and 15%, the wider one a first-timer orders. Where the calculator decides between patterns or materials, the ends are the options it offers. Where it adds nothing for loss, the range runs from the net quantity to 15% over it.

A minimum — the fewest hangers a spacing allows, the least airflow a room needs — has no upper end. A single figure carries an allowance the material itself needs, such as a lap, and names it.

## What a reading like this cannot see

- It does not know your prices, your market, or what the work ought to cost.
- It does not know the building — the access, the condition of what is there, or what has to happen first.
- It cannot check a lump sum, because there is no quantity in one.
- A line it reads as missing may be priced under another name. A quantity outside the range is not evidence of anything. Each is a reason to ask a question.
- Two quotes are not comparable until their scopes are.
- It is not advice, and it is no substitute for a second quote.

The full takeoff

## Every quantity for this job, with its working

The Shower enclosure takeoff runs the same calculators on the same measurements and shows what sits under each line here.

- [Open the takeoff](https://craftquantities.com/build/shower-enclosure/)
- [Every quote check](https://craftquantities.com/check/)

- Base, allowance, order

  Each line's quantity before and after its allowance, and what to buy.
- Every allowance editable

  Change a waste figure and the order follows, with its source named.
- Into a project

  Add the whole job to a workspace with your own prices.

## Frequently asked questions

**What quantities does a shower enclosure job need?**

It depends on the measurements, so this page asks for yours. At the size it opens on — Tiled wall run 2.7 m · Tiled height 2 m · Tray width 0.9 m · Tray depth 0.9 m · Tanked wall run 2.7 m · Tanked height 2 m · Internal corners in the tanked zone 2 · Pipe penetrations through the membrane 3 — the lines come to: Wet Room Tanking and Waterproof Membrane, 13–15 litres; Tile Backer Board, 6–7 boards; Tile & Grout, 63–69 tiles; Thinset & Tile Adhesive, 2–3 bags. In imperial units — Tiled wall run 9 ft · Tiled height 6.5 ft · Tray width 3 ft · Tray depth 3 ft · Tanked wall run 9 ft · Tanked height 6.5 ft · Internal corners in the tanked zone 2 · Pipe penetrations through the membrane 3 — they come to: Wet Room Tanking and Waterproof Membrane, 3.4–3.91 gal; Tile Backer Board, 6–7 boards; Tile & Grout, 62–68 tiles; Thinset & Tile Adhesive, 2–3 bags.

**Which line on a shower enclosure quote varies the most?**

The Thinset & Tile Adhesive: 2–3 bags for a job measured Tiled wall run 2.7 m · Tiled height 2 m · Tray width 0.9 m · Tray depth 0.9 m · Tanked wall run 2.7 m · Tanked height 2 m · Internal corners in the tanked zone 2 · Pipe penetrations through the membrane 3, depending on how much is allowed for loss over the net figure, up to 15%.

**What does a shower enclosure quote often leave out?**

The reading names every line of the job that nothing on the quote reads as — any of the 4 lines the takeoff measures. The takeoff also lists 5 things it does not measure, shown under the reading, and each is worth asking about: a scope missing from a quote tends to become a cost after work has started.

**Can I paste the quote exactly as it came?**

Yes — from an email, a PDF or a spreadsheet, one item to a line. Amounts of money are taken out before anything is read, headings and totals are skipped, and each line is shown with what it was read as, so a misreading is one correction. Quantities in the other unit system are converted and the conversion is shown; a count of boxes is never compared with a count of tiles.

**Does this check the price as well?**

No. It reads quantities, never prices, and this site publishes none: an installed price moves with the market, the season, the access and the specification, so a figure for what the work ought to cost would give you confidence in a number nobody can defend. A quantity against your own measurements is checkable, and every figure here links to the calculator that produced it.

---