Each line read against your measurements: 9 lines, 8 measurements. Quantities, never prices.

Step 1

## Your measurements

Measured this job on the [rainscreen cladding on battens takeoff](https://craftquantities.com/build/rainscreen-cladding/)? Send it to My Project, or save a setup, and these boxes fill in one press.

Worked from Length of wall clad, walls end to end 52 ft · Height clad 17 ft · Windows 6 · Window opening width, each 4 ft · Window opening height, each 4 ft · Doors 1 · Outside corners 2 · Cavity barrier lines across the gap 1 (US customary) / Length of wall clad, walls end to end 16 m · Height clad 5.2 m · Windows 6 · Window opening width, each 1.2 m · Window opening height, each 1.2 m · Doors 1 · Outside corners 2 · Cavity barrier lines across the gap 1 (metric)

How to take each of these, and what each one feeds, is under the same field on the [rainscreen cladding on battens takeoff](https://craftquantities.com/build/rainscreen-cladding/).

Step 2 · Your quote

## The rainscreen cladding quote you were given

Paste from an email, or open or drop a PDF, Excel, CSV or text file, or a photo of the quote. Amounts of money are taken out before anything is read — this page compares quantities, never prices.

Nothing you paste or open leaves this device.

or one the job needs:

Step 3 · The reading

## What the quote says, against the job

Rainscreen cladding · Length of wall clad, walls end to end 52 ft · Height clad 17 ft · Windows 6 · Window opening width, each 4 ft · Window opening height, each 4 ft · Doors 1 · Outside corners 2 · Cavity barrier lines across the gap 1 (US customary) / Length of wall clad, walls end to end 16 m · Height clad 5.2 m · Windows 6 · Window opening width, each 1.2 m · Window opening height, each 1.2 m · Doors 1 · Outside corners 2 · Cavity barrier lines across the gap 1 (metric)

- What it leaves out

  Every line the job needs that nothing on the quote reads as, with the quantity your measurements produce.
- What it adds

  Lines this job's takeoff does not measure — labour, removal, hire, fees, anything else — each named for what it is.
- What sits outside the range

  Quantities above or below the computed range, by how much, in the quote's unit or converted and shown.
- What to ask

  One list of questions, in the quote's order, ready to copy and send. Questions, never a verdict.

Paste the quote above, or add its lines one at a time. The reading appears here as each line is read.

### Outside what this takeoff measures

11

Nothing in the reading measures these. Whether the quote covers each is worth asking in its own right: a scope missing from a quote tends to become a cost after work has started. Why each is left out is on the [takeoff](https://craftquantities.com/build/rainscreen-cladding/).

- The fire strategy
- The structural fixing of the battens or rails
- Repairs to the wall behind once old cladding or siding comes off in the strip out
- The timber's species, grade and treatment, and any fire-retardant treatment a board may need; the rows count boards of the width given
- Moving a gas or electricity meter or its box, which only the supplier or the network operator does, and the flue's design and certification, which is the registered gas engineer's
- Whether the new facing needs planning permission, and the consent a conservation area or a listed building needs; in North America, a historic district's approval
- Insulating the wall to a target
- Replacing the roofline, and the carpentry that brings the eaves or a verge out
- The windows and doors themselves, and the sills under them; the trims and closers round them are counted
- A line of its own for the cover battens over board-on-board cladding
- The starter strip, J-channel and corner posts that plastic siding hangs from

No quote read yet

[Open the takeoff](https://craftquantities.com/build/rainscreen-cladding/)

Paste a quote

## The job

Length of wall clad, walls end to end 52 ft · Height clad 17 ft · Windows 6 · Window opening width, each 4 ft · Window opening height, each 4 ft · Doors 1 · Outside corners 2 · Cavity barrier lines across the gap 1 (US customary) / Length of wall clad, walls end to end 16 m · Height clad 5.2 m · Windows 6 · Window opening width, each 1.2 m · Window opening height, each 1.2 m · Doors 1 · Outside corners 2 · Cavity barrier lines across the gap 1 (metric)

## What the job needs

For these measurements, by the site’s calculators.

_US customary:_

- Breather membrane (house wrap, weather or water resistive barrier)1 roll
- Furring strips (battens), upright 680–782 ft
- Cavity barriers or blocking across the ventilated gap 54.6–59.8 ft
- Corner and opening trims 15–18 sheets
- Vented closers (vent closures, vent strips) with insect mesh 16–19 sheets
- Lap siding or cladding boards (wood, fibre cement or composite), in squares 8.11–8.88 squares
- Mastic (caulk) at the frames 0.38–0.43 gal
- Stain, oil or paint on the boards 5.5–6.33 gallons
- Skip (dumpster) for offcuts at least 2.15 yd³

_metric:_

- Breather membrane (house wrap, weather or water resistive barrier)1 roll
- Battens and counter-battens 437–503 m
- Cavity barriers or blocking across the ventilated gap 16.8–18.4 m
- Corner and opening trims 15–18 sheets
- Vented closers (vent closures) with insect mesh 16–19 sheets
- Cladding boards, board on board (timber, fibre cement or composite)92–106 boards
- Mastic (caulk) at the frames 1.26–1.45 L
- Stain, oil or paint on the boards 20.8–23.9 L
- Skip (dumpster) for offcuts at least 1.66 m³

More than one quote

## Level the quotes side by side

Two to six rainscreen cladding quotes, each read against this job: included, left out, excluded or added, line by line.

Kept on this device**Figures**The page's opening**Units**Imperial Quantities only, never prices

## How the quote is read

Each line of a rainscreen cladding quote is matched to the line of the job it names, or marked as something the [Rainscreen cladding on battens takeoff](https://craftquantities.com/build/rainscreen-cladding/) does not measure — labour, removal, hire, fees, or anything else. Work the takeoff lists as part of the job but gives no quantity for is read as that work, not as something the quote adds.

The job’s own figures come from 8 measurements — length of wall clad, walls end to end, height clad, windows, window opening width, each, window opening height, each, doors, outside corners, cavity barrier lines across the gap — run through the same calculators as the takeoff, so the two give the same figure for the same job.

## Reading a rainscreen cladding quote

A cladding price may stop at the boards, or run from the wall outwards through the drained gap that keeps the boards off it, and the two are different jobs. Worth seeing each of these priced: the membrane on the wall, the timber that forms the gap (two layers of it behind upright boards), the perforated closers that let air in at the foot and out at the head, and the trims at corners and round windows; and worth asking whether taking off any old cladding, and sheeting the opened wall at night, are in the figure.

The fire items are the ones to settle before agreeing a figure: whether cavity barriers are in it at all, along which lines and round which openings, whose drawing places them, and what test evidence arrives with the products. Worth asking, too, what the boards are and how they are finished: the species and treatment of timber, whether a fibre-cement or composite board comes coated from the factory, and whether staining or painting on site is part of the price.

## Three steps

1. Give your measurements, or fill them from your own takeoff in one press. The page opens on a typical job so it has something to show.
2. Paste the quote's lines as they came, or add them one at a time. Leave the prices in — they are taken out, never read.
3. Read the report: what is left out, what is added, what sits outside the range, and one list of questions to send.

The reference

## Every line the reading looks for

For Length of wall clad, walls end to end 52 ft · Height clad 17 ft · Windows 6 · Window opening width, each 4 ft · Window opening height, each 4 ft · Doors 1 · Outside corners 2 · Cavity barrier lines across the gap 1 (US customary) / Length of wall clad, walls end to end 16 m · Height clad 5.2 m · Windows 6 · Window opening width, each 1.2 m · Window opening height, each 1.2 m · Doors 1 · Outside corners 2 · Cavity barrier lines across the gap 1 (metric). Each is the calculator linked under it, run with those measurements; a range is that calculator at both ends of one choice, not a margin for error.

_US customary:_

- Breather membrane (house wrap, weather or water resistive barrier)

  1 roll

  One figure, with the lap allowance the material needs already inside it at 10%.

  [Open the House Wrap Calculator](https://craftquantities.com/calculators/renovation-construction/house-wrap-calculator/)
- Furring strips (battens), upright

  680–782 ft

  Battens (furring strips) come in stock lengths, and each strip cut from them leaves an offcut. 680 net, 782 with 15% added.

  [Open the Rain-Screen Cladding Furring Strip Calculator](https://craftquantities.com/calculators/materials-quantities/rain-screen-furring-calculator/)
- Cavity barriers or blocking across the ventilated gap

  54.6–59.8 ft

  54.6 at 5% waste allowance, 59.8 at 15%.

  [Open the Cavity Barrier Run and Crossing Count Calculator](https://craftquantities.com/calculators/materials-quantities/cavity-barrier-crossing-count-calculator/)
- Corner and opening trims

  15–18 sheets

  Flashing comes in stock pieces, each run is cut from its own, and the offcut at each end is lost. 15 net, 18 with 15% added.

  [Open the Exterior Flashing Layout Trim Sheet Calculator](https://craftquantities.com/calculators/materials-quantities/flashing-trim-sheet-calculator/)
- Vented closers (vent closures, vent strips) with insect mesh

  16–19 sheets

  Flashing comes in stock pieces, each run is cut from its own, and the offcut at each end is lost. 16 net, 19 with 15% added.

  [Open the Exterior Flashing Layout Trim Sheet Calculator](https://craftquantities.com/calculators/materials-quantities/flashing-trim-sheet-calculator/)
- Lap siding or cladding boards (wood, fibre cement or composite), in squares

  8.11–8.88 squares

  8.11 at 5% waste factor, 8.88 at 15%.

  [Open the Siding Calculator](https://craftquantities.com/calculators/renovation-construction/siding-calculator/)
- Mastic (caulk) at the frames

  0.38–0.43 gal

  Sealant comes by the tube, and the end of every tube is left in the gun. 0.38 net, 0.43 with 15% added.

  [Open the Fiber-Cement Siding Caulk Joint Volume Calculator](https://craftquantities.com/calculators/materials-quantities/fiber-cement-caulk-volume-calculator/)
- Stain, oil or paint on the boards

  5.5–6.33 gallons

  Paint is bought by the can, and rough or weathered cladding takes more than a smooth wall. 5.5 net, 6.33 with 15% added.

  [Open the Exterior Paint Calculator](https://craftquantities.com/calculators/renovation-construction/exterior-paint-calculator/)
- Skip (dumpster) for offcuts

  at least 2.15 yd³

  The loose volume the waste takes up; the container quoted is at least this big, and a bigger one is a choice.

  [Open the Skip & Dumpster Size Calculator](https://craftquantities.com/calculators/auto-utility/skip-and-dumpster-size-calculator/)
- Ground sheeting under the clad walls, and tape at the frames

  3 items

  Worked out, not compared with a quote

  Dust sheets and tape together, which a quote prices as preparation rather than listing.

  [Open the Masking and Protection Materials Calculator](https://craftquantities.com/calculators/renovation-construction/masking-and-protection-calculator/)
- Scaffold along the clad walls

  884 sq ft of face

  Worked out, not compared with a quote

  The face the scaffold covers; a quote can price erecting, hire and striking as one sum, so one area is not held against it.

  [Open the Scaffold Face Area and Hire Quantity Calculator](https://craftquantities.com/calculators/materials-quantities/scaffold-face-area-calculator/)

_metric:_

- Breather membrane (house wrap, weather or water resistive barrier)

  1 roll

  One figure, with the lap allowance the material needs already inside it at 10%.

  [Open the House Wrap Calculator](https://craftquantities.com/calculators/renovation-construction/house-wrap-calculator/)
- Battens and counter-battens

  437–503 m

  Battens (furring strips) come in stock lengths, and each strip cut from them leaves an offcut. 437 net, 503 with 15% added.

  [Open the Rain-Screen Cladding Furring Strip Calculator](https://craftquantities.com/calculators/materials-quantities/rain-screen-furring-calculator/)
- Cavity barriers or blocking across the ventilated gap

  16.8–18.4 m

  16.8 at 5% waste allowance, 18.4 at 15%.

  [Open the Cavity Barrier Run and Crossing Count Calculator](https://craftquantities.com/calculators/materials-quantities/cavity-barrier-crossing-count-calculator/)
- Corner and opening trims

  15–18 sheets

  Flashing comes in stock pieces, each run is cut from its own, and the offcut at each end is lost. 15 net, 18 with 15% added.

  [Open the Exterior Flashing Layout Trim Sheet Calculator](https://craftquantities.com/calculators/materials-quantities/flashing-trim-sheet-calculator/)
- Vented closers (vent closures) with insect mesh

  16–19 sheets

  Flashing comes in stock pieces, each run is cut from its own, and the offcut at each end is lost. 16 net, 19 with 15% added.

  [Open the Exterior Flashing Layout Trim Sheet Calculator](https://craftquantities.com/calculators/materials-quantities/flashing-trim-sheet-calculator/)
- Cladding boards, board on board (timber, fibre cement or composite)

  92–106 boards

  Boards and battens are cut to the wall's height, and the offcuts at openings are rarely long enough to use. 92 net, 106 with 15% added.

  [Open the Board and Batten Siding Calculator](https://craftquantities.com/calculators/renovation-construction/board-and-batten-siding-calculator/)
- Mastic (caulk) at the frames

  1.26–1.45 L

  Sealant comes by the tube, and the end of every tube is left in the gun. 1.26 net, 1.45 with 15% added.

  [Open the Fiber-Cement Siding Caulk Joint Volume Calculator](https://craftquantities.com/calculators/materials-quantities/fiber-cement-caulk-volume-calculator/)
- Stain, oil or paint on the boards

  20.8–23.9 L

  Paint is bought by the can, and rough or weathered cladding takes more than a smooth wall. 20.8 net, 23.9 with 15% added.

  [Open the Exterior Paint Calculator](https://craftquantities.com/calculators/renovation-construction/exterior-paint-calculator/)
- Skip (dumpster) for offcuts

  at least 1.66 m³

  The loose volume the waste takes up; the container quoted is at least this big, and a bigger one is a choice.

  [Open the Skip & Dumpster Size Calculator](https://craftquantities.com/calculators/auto-utility/skip-and-dumpster-size-calculator/)
- Ground sheeting under the clad walls, and tape at the frames

  3 items

  Worked out, not compared with a quote

  Dust sheets and tape together, which a quote prices as preparation rather than listing.

  [Open the Masking and Protection Materials Calculator](https://craftquantities.com/calculators/renovation-construction/masking-and-protection-calculator/)
- Scaffold along the clad walls

  83.2 m² of face

  Worked out, not compared with a quote

  The face the scaffold covers; a quote can price erecting, hire and striking as one sum, so one area is not held against it.

  [Open the Scaffold Face Area and Hire Quantity Calculator](https://craftquantities.com/calculators/materials-quantities/scaffold-face-area-calculator/)

## How the ranges are taken

Where the choice is cutting waste, the ends are the site’s own allowances: 5%, the tight buffer of a crew with a planned set-out, and 15%, the wider one a first-timer orders. Where the calculator decides between patterns or materials, the ends are the options it offers. Where it adds nothing for loss, the range runs from the net quantity to 15% over it.

A minimum — the fewest hangers a spacing allows, the least airflow a room needs — has no upper end. A single figure carries an allowance the material itself needs, such as a lap, and names it.

## What a reading like this cannot see

- It does not know your prices, your market, or what the work ought to cost.
- It does not know the building — the access, the condition of what is there, or what has to happen first.
- It cannot check a lump sum, because there is no quantity in one.
- A line it reads as missing may be priced under another name. A quantity outside the range is not evidence of anything. Each is a reason to ask a question.
- Two quotes are not comparable until their scopes are.
- It is not advice, and it is no substitute for a second quote.

The full takeoff

## Every quantity for this job, with its working

The Rainscreen cladding on battens takeoff runs the same calculators on the same measurements and shows what sits under each line here.

- [Open the takeoff](https://craftquantities.com/build/rainscreen-cladding/)
- [Every quote check](https://craftquantities.com/check/)

- Base, allowance, order

  Each line's quantity before and after its allowance, and what to buy.
- Every allowance editable

  Change a waste figure and the order follows, with its source named.
- Into a project

  Add the whole job to a workspace with your own prices.

## Frequently asked questions

**What quantities does a rainscreen cladding job need?**

It depends on the measurements, so this page asks for yours. At the size it opens on — Length of wall clad, walls end to end 16 m · Height clad 5.2 m · Windows 6 · Window opening width, each 1.2 m · Window opening height, each 1.2 m · Doors 1 · Outside corners 2 · Cavity barrier lines across the gap 1 — the lines come to: Breather membrane (house wrap, weather or water resistive barrier), 1 roll; Battens and counter-battens, 437–503 m; Cavity barriers or blocking across the ventilated gap, 16.8–18.4 m; Corner and opening trims, 15–18 sheets; Vented closers (vent closures) with insect mesh, 16–19 sheets; Cladding boards, board on board (timber, fibre cement or composite), 92–106 boards; Mastic (caulk) at the frames, 1.26–1.45 L; Stain, oil or paint on the boards, 20.8–23.9 L; Skip (dumpster) for offcuts, 1.66 m³. In imperial units — Length of wall clad, walls end to end 52 ft · Height clad 17 ft · Windows 6 · Window opening width, each 4 ft · Window opening height, each 4 ft · Doors 1 · Outside corners 2 · Cavity barrier lines across the gap 1 — they come to: Breather membrane (house wrap, weather or water resistive barrier), 1 roll; Furring strips (battens), upright, 680–782 ft; Cavity barriers or blocking across the ventilated gap, 54.6–59.8 ft; Corner and opening trims, 15–18 sheets; Vented closers (vent closures, vent strips) with insect mesh, 16–19 sheets; Lap siding or cladding boards (wood, fibre cement or composite), in squares, 8.11–8.88 squares; Mastic (caulk) at the frames, 0.38–0.43 gal; Stain, oil or paint on the boards, 5.5–6.33 gallons; Skip (dumpster) for offcuts, 2.15 yd³.

**Which line on a rainscreen cladding quote varies the most?**

The Corner and opening trims: 15–18 sheets for a job measured Length of wall clad, walls end to end 16 m · Height clad 5.2 m · Windows 6 · Window opening width, each 1.2 m · Window opening height, each 1.2 m · Doors 1 · Outside corners 2 · Cavity barrier lines across the gap 1, depending on how much is allowed for loss over the net figure, up to 15%.

**What does a rainscreen cladding quote often leave out?**

The reading names every line of the job that nothing on the quote reads as — any of the 9 lines the takeoff measures. The takeoff also lists 11 things it does not measure, shown under the reading, and each is worth asking about: a scope missing from a quote tends to become a cost after work has started.

**Can I paste the quote exactly as it came?**

Yes — from an email, a PDF or a spreadsheet, one item to a line. Amounts of money are taken out before anything is read, headings and totals are skipped, and each line is shown with what it was read as, so a misreading is one correction. Quantities in the other unit system are converted and the conversion is shown; a count of boxes is never compared with a count of tiles.

**Does this check the price as well?**

No. It reads quantities, never prices, and this site publishes none: an installed price moves with the market, the season, the access and the specification, so a figure for what the work ought to cost would give you confidence in a number nobody can defend. A quantity against your own measurements is checkable, and every figure here links to the calculator that produced it.

---
Source: https://craftquantities.com/check/rainscreen-cladding-quote/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.