# Is your plastering quote reasonable?

> Paste a plastering quote and read its board, adhesive, tape and plaster quantities against your own room, with what it leaves out, what it adds and what…

Page: https://craftquantities.com/check/plastering-quote/ (quote check). This is the page's Markdown copy; the HTML page is the canonical version.

Each line read against your room: 8 lines and 6 scopes. Quantities, never prices.

Step 1

## The room

Measured this job on the [plaster room takeoff](https://craftquantities.com/build/plaster-room/)? Send it to My Project, or save a setup, and these boxes fill in one press.

Worked from a room 13 by 11.5 ft, 8 ft to the ceiling, with 0 outside corners (US customary) / a room 4 by 3.5 m, 2.4 m to the ceiling, with 0 outside corners (metric)

Lengths in ft / m, corners as a count. An **outside corner** is one you could walk round — a chimney breast, a boxed pipe run, a return into a reveal. A plain rectangular room has none, and that is a valid answer.

Step 2 · Your quote

## The plastering quote you were given

Paste from an email, or open or drop a PDF, Excel, CSV or text file, or a photo of the quote. Amounts of money are taken out before anything is read — this page compares quantities, never prices.

Nothing you paste or open leaves this device.

or one the job needs:

Step 3 · The reading

## What the quote says, against the job

Plastering · a room 13 by 11.5 ft, 8 ft to the ceiling, with 0 outside corners (US customary) / a room 4 by 3.5 m, 2.4 m to the ceiling, with 0 outside corners (metric)

- What it leaves out

  Every line the job needs that nothing on the quote reads as, with the quantity your measurements produce.
- What it adds

  Lines this job's takeoff does not measure — labour, removal, hire, fees, anything else — each named for what it is.
- What sits outside the range

  Quantities above or below the computed range, by how much, in the quote's unit or converted and shown.
- What to ask

  One list of questions, in the quote's order, ready to copy and send. Questions, never a verdict.

Paste the quote above, or add its lines one at a time. The reading appears here as each line is read.

No quote read yet

[Every quote check](https://craftquantities.com/check/)

Paste a quote

## The job

a room 13 by 11.5 ft, 8 ft to the ceiling, with 0 outside corners (US customary) / a room 4 by 3.5 m, 2.4 m to the ceiling, with 0 outside corners (metric)

## What the job needs

For these measurements, by the site’s calculators.

_US customary:_

- Plasterboard / drywall sheets 12–13 sheets (4x8 ft)
- Ceiling boards 6–9 sheets
- Dot-and-dab adhesive (direct bond)265–618 lb
- Drywall screws 612–810 screws
- Joint tape (scrim)301–316 ft
- Joint compound (filler)2 x 4.5 gal boxes
- Corner bead 0 ft
- Skim coat (finish plaster)319–478 lb

_metric:_

- Plasterboard / drywall sheets 12–14 sheets (2400x1200 mm)
- Ceiling boards 6–9 sheets
- Dot-and-dab adhesive (direct bond)119–277 kg
- Drywall screws 612–810 screws
- Joint tape (scrim)91.2–95.8 m
- Joint compound (filler)31.6–36.1 kg
- Corner bead 0 m
- Skim coat (finish plaster)144–216 kg

More than one quote

## Level the quotes side by side

Two to six plastering quotes, each read against this job: included, left out, excluded or added, line by line.

Kept on this device**Figures**The page's example room**Units**Imperial Quantities only, never prices

## Why plastering is worth checking

More of a plastering quote is arithmetic than of almost any other trade’s. Boards come from an area, screws from a board count, tape from the joints those boards make, plaster from the surface they leave. Each of those is a number you can work out from the room you are standing in.

## The line the wall decides

The exception is the one that matters most, and the reading says so where it appears: the adhesive a wall takes is a property of the **wall**, not of the board. A flat blockwork wall takes about half what an old, bowed or rendered one does, and the same is true of a skim over existing plaster. A figure at the top of the range is often a tradesman who has looked at the wall.

## No prices, anywhere

**No prices appear anywhere on this page.** Plastering is priced per square metre in some places and per day in others, and a rate that means something in one town means nothing two hours away. What travels is the quantity, so that is what is read — any money in a pasted quote is taken out first.

What it looks for

## What a plastering quote has to mention

On this trade the list is more useful than the quantities: an extra bag of finish costs very little, and discovering on the second morning that the old plaster has to come off is a different conversation entirely. The reading names any of these the quote's words do not.

- Preparing the background

  What is already on the wall decides most of the work. Sound plaster can be skimmed over; blown or damp plaster has to come off, and a dusty or painted face needs sealing before anything will stick to it. This is the item most often discovered after the first morning.
- Protection or cleaning up

  Plastering is the dustiest trade in a house and the water carries it everywhere. Whether floors, stairs and fitted furniture are sheeted, and who cleans up at the end of each day, is worth establishing before the first bag is mixed.
- Waste removal

  Hacked-off plaster is heavy rather than bulky and fills a skip faster than people expect, and board offcuts are the opposite. Whether it is in the price, and who carries it out of the house, is a real cost either way.
- Access equipment

  A ceiling, a stairwell or anything above a standard wall height needs a tower or trestles rather than a step, and hiring one is priced by the week whether it is used every day or not.
- Drying time

  Fresh plaster has to dry before it is decorated, and forcing it with heat is how it cracks. In winter that can be weeks rather than days, which matters more to a schedule than to a price.
- The textured ceiling coating

  Textured coatings applied before 2000 may contain asbestos, which makes removal a licensed matter and over-boarding a common alternative. This is a survey question rather than a quantity, and it is settled before anybody scrapes anything.

## Where this check stops

- It has not seen the wall. Everything about the background — whether it is sound, flat, damp, painted or already rendered — is a survey, and it moves the adhesive and the plaster more than anything this page can compute.
- It does not know labour, days, or how many plasterers turn up. A skim has to be finished in one pass while it is workable, which sets the size of a day’s work in a way no quantity shows.
- It cannot read a lump sum. A great many plastering quotes are one figure for the job, which is a perfectly normal way to price it.
- A quantity outside the range is a reason to ask, and nothing more. Every line the reading places names at least one ordinary reason a real figure differs.
- It is not advice, and it is not a second opinion on the work.

## How the ranges are produced

Each line runs a published calculator twice, at each end of the single input that is a real choice rather than a fact — a waste allowance, a board size, a fixing centre, a coverage rate, a skim thickness. The reading prints which input it moved, so the width of a range is something you can argue with. A range with no stated reason is a hedge, and this one is not.

Nothing is worked out here that is not worked out on the calculator’s own page. Follow the link under any line, enter the same numbers, and the answer will match to the digit — including the units, which follow whichever market you have this site set to.

More quote checks

## A check for every job the site takes off

Board, tile, roof, deck or drive: each has its own page, worked out from the same calculators as its takeoff.

- [Every quote check](https://craftquantities.com/check/)
- [Job takeoffs](https://craftquantities.com/build/)

- Quantities, never prices

  Every figure is a quantity your own measurements decide.
- The working, one click away

  Each line links to the calculator that produced it.
- Nothing leaves this device

  There is no account and no server to send a quote to.

## Frequently asked questions

**My quote says “scrim” and this page says “joint tape”. Same thing?**

Yes. The trade has two vocabularies and most tools only speak one of them — scrim is joint tape, browning is brown coat, plasterboard is drywall. The reading knows both, and every line shows what it was read as, so a line in the other dialect can be matched by hand in one step if it was not matched already.

**The adhesive figure is nearly double mine. Is one of us out?**

Probably neither. Dot-and-dab adhesive is the widest line on any plastering quote because the quantity is decided by how far out of true the wall is, not by the board. The range spans a flat blockwork wall at one end and a bowed or previously rendered one at the other, and that is a genuine factor of two on the same room.

**My quote is one price with no quantities on it at all.**

Then the reading has no quantities to place, and the scopes it looks for are the whole value of this page. Asking what a lump sum includes — the background, the access, the waste, the drying — is the conversation that prevents the surprise, and it is a fair question to put to anybody.

**Should I send this to the plasterer?**

It is written so that you can. Nothing on it characterises anybody, every line states the assumption behind its own figure, and the questions are the ones a good tradesman answers in a sentence. The aim is a shorter conversation, not a confrontation.

---
Source: https://craftquantities.com/check/plastering-quote/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.
