# Check a new staircase quote

> Paste a new staircase quote and read it against your own measurements: the lines it leaves out, the ones it adds, the quantities outside the computed…

Page: https://craftquantities.com/check/new-staircase-quote/ (quote check). This is the page's Markdown copy; the HTML page is the canonical version.

Each line read against your measurements: 2 lines, 4 measurements. Quantities, never prices.

Step 1

## Your measurements

Measured this job on the [new staircase by type takeoff](https://craftquantities.com/build/new-staircase/)? Send it to My Project, or save a setup, and these boxes fill in one press.

Worked from Rise, finished floor to finished floor 9 ft · Going of each tread (its run) 10.3 in · Width of the stair 3 ft · Handrails 1 (US customary) / Rise, finished floor to finished floor 2.7 m · Going of each tread (its run) 260 mm · Width of the stair 0.9 m · Handrails 1 (metric)

How to take each of these, and what each one feeds, is under the same field on the [new staircase by type takeoff](https://craftquantities.com/build/new-staircase/).

Step 2 · Your quote

## The new staircase quote you were given

Paste from an email, or open or drop a PDF, Excel, CSV or text file, or a photo of the quote. Amounts of money are taken out before anything is read — this page compares quantities, never prices.

Nothing you paste or open leaves this device.

or one the job needs:

Step 3 · The reading

## What the quote says, against the job

New staircase · Rise, finished floor to finished floor 9 ft · Going of each tread (its run) 10.3 in · Width of the stair 3 ft · Handrails 1 (US customary) / Rise, finished floor to finished floor 2.7 m · Going of each tread (its run) 260 mm · Width of the stair 0.9 m · Handrails 1 (metric)

- What it leaves out

  Every line the job needs that nothing on the quote reads as, with the quantity your measurements produce.
- What it adds

  Lines this job's takeoff does not measure — labour, removal, hire, fees, anything else — each named for what it is.
- What sits outside the range

  Quantities above or below the computed range, by how much, in the quote's unit or converted and shown.
- What to ask

  One list of questions, in the quote's order, ready to copy and send. Questions, never a verdict.

Paste the quote above, or add its lines one at a time. The reading appears here as each line is read.

### Outside what this takeoff measures

5

Nothing in the reading measures these. Whether the quote covers each is worth asking in its own right: a scope missing from a quote tends to become a cost after work has started. Why each is left out is on the [takeoff](https://craftquantities.com/build/new-staircase/).

- The structure
- Approval of the stair
- Spiral and helical stairs, loft ladders and stairs that turn on winders
- Treads' finishes beyond the material itself
- The balustrade's infill panels or glass, and a balustrade on a landing beyond the rail's length the rail row counts

No quote read yet

[Open the takeoff](https://craftquantities.com/build/new-staircase/)

Paste a quote

## The job

Rise, finished floor to finished floor 9 ft · Going of each tread (its run) 10.3 in · Width of the stair 3 ft · Handrails 1 (US customary) / Rise, finished floor to finished floor 2.7 m · Going of each tread (its run) 260 mm · Width of the stair 0.9 m · Handrails 1 (metric)

## What the job needs

For these measurements, by the site’s calculators.

_US customary:_

- Treads, risers, stringers and any landing's framing 14 treads
- Handrail up the pitch, each rail counted 15.7–17.2 linear ft

_metric:_

- Treads, risers, stringers and any landing's framing 14 treads
- Handrail up the pitch, each rail counted 4.76–5.21 m

More than one quote

## Level the quotes side by side

Two to six new staircase quotes, each read against this job: included, left out, excluded or added, line by line.

Kept on this device**Figures**The page's opening**Units**Imperial Quantities only, never prices

## How the quote is read

Each line of a new staircase quote is matched to the line of the job it names, or marked as something the [New staircase by type takeoff](https://craftquantities.com/build/new-staircase/) does not measure — labour, removal, hire, fees, or anything else. Work the takeoff lists as part of the job but gives no quantity for is read as that work, not as something the quote adds.

The job’s own figures come from 4 measurements — rise, finished floor to finished floor, going of each tread (its run), width of the stair, handrails — run through the same calculators as the takeoff, so the two give the same figure for the same job.

## Reading a new staircase quote

A new stair is priced from a set-out: the rise between the two finished floors, the number of risers, the going of each tread, the width and the headroom. Worth having those figures on the quote, with the rules they were drawn to, and asking who measured them, so a flight that arrives a riser short or will not clear the ceiling above is not argued over afterwards.

Timber, concrete and steel stairs are quoted by different trades in different ways: a stair maker's flight delivered and fitted, a cast flight's forms, bars and concrete from a builder, or a fabricator's steel drawn, made, painted or galvanised and bolted in. Worth seeing which of those the figure covers, whether the landing is in it, who designs the waist, the bars or the steel sections and the connections, and whether the drawings and any calculations are part of the price.

The work round the flight is where quotes differ most. Worth asking whether trimming the opening in the floor above and propping it are included and who designs the trimmers, whether the handrail, the balusters or panels and the guard along a landing are in the figure and in what material, and whether building control's or the permit's fees and inspections are allowed for.

## Three steps

1. Give your measurements, or fill them from your own takeoff in one press. The page opens on a typical job so it has something to show.
2. Paste the quote's lines as they came, or add them one at a time. Leave the prices in — they are taken out, never read.
3. Read the report: what is left out, what is added, what sits outside the range, and one list of questions to send.

The reference

## Every line the reading looks for

For Rise, finished floor to finished floor 9 ft · Going of each tread (its run) 10.3 in · Width of the stair 3 ft · Handrails 1 (US customary) / Rise, finished floor to finished floor 2.7 m · Going of each tread (its run) 260 mm · Width of the stair 0.9 m · Handrails 1 (metric). Each is the calculator linked under it, run with those measurements; a range is that calculator at both ends of one choice, not a margin for error.

_US customary:_

- Treads, risers, stringers and any landing's framing

  14 treads

  The same at 5% allowance and at 15%, once rounded to what is bought.

  [Open the L-Shaped and U-Shaped Stair Calculator (Landings, Winders, Stringers, Treads and Risers)](https://craftquantities.com/calculators/materials-quantities/landing-stair-calculator/)
- Handrail up the pitch, each rail counted

  15.7–17.2 linear ft

  15.7 at 5% cutting waste, 17.2 at 15%.

  [Open the Handrail Length Calculator](https://craftquantities.com/calculators/renovation-construction/handrail-length-calculator/)

_metric:_

- Treads, risers, stringers and any landing's framing

  14 treads

  The same at 5% allowance and at 15%, once rounded to what is bought.

  [Open the L-Shaped and U-Shaped Stair Calculator (Landings, Winders, Stringers, Treads and Risers)](https://craftquantities.com/calculators/materials-quantities/landing-stair-calculator/)
- Handrail up the pitch, each rail counted

  4.76–5.21 m

  4.76 at 5% cutting waste, 5.21 at 15%.

  [Open the Handrail Length Calculator](https://craftquantities.com/calculators/renovation-construction/handrail-length-calculator/)

## How the ranges are taken

Where the choice is cutting waste, the ends are the site’s own allowances: 5%, the tight buffer of a crew with a planned set-out, and 15%, the wider one a first-timer orders. Where the calculator decides between patterns or materials, the ends are the options it offers. Where it adds nothing for loss, the range runs from the net quantity to 15% over it.

A minimum — the fewest hangers a spacing allows, the least airflow a room needs — has no upper end. A single figure carries an allowance the material itself needs, such as a lap, and names it.

## What a reading like this cannot see

- It does not know your prices, your market, or what the work ought to cost.
- It does not know the building — the access, the condition of what is there, or what has to happen first.
- It cannot check a lump sum, because there is no quantity in one.
- A line it reads as missing may be priced under another name. A quantity outside the range is not evidence of anything. Each is a reason to ask a question.
- Two quotes are not comparable until their scopes are.
- It is not advice, and it is no substitute for a second quote.

The full takeoff

## Every quantity for this job, with its working

The New staircase by type takeoff runs the same calculators on the same measurements and shows what sits under each line here.

- [Open the takeoff](https://craftquantities.com/build/new-staircase/)
- [Every quote check](https://craftquantities.com/check/)

- Base, allowance, order

  Each line's quantity before and after its allowance, and what to buy.
- Every allowance editable

  Change a waste figure and the order follows, with its source named.
- Into a project

  Add the whole job to a workspace with your own prices.

## Frequently asked questions

**What quantities does a new staircase job need?**

It depends on the measurements, so this page asks for yours. At the size it opens on — Rise, finished floor to finished floor 2.7 m · Going of each tread (its run) 260 mm · Width of the stair 0.9 m · Handrails 1 — the lines come to: Treads, risers, stringers and any landing's framing, 14 treads; Handrail up the pitch, each rail counted, 4.76–5.21 m. In imperial units — Rise, finished floor to finished floor 9 ft · Going of each tread (its run) 10.3 in · Width of the stair 3 ft · Handrails 1 — they come to: Treads, risers, stringers and any landing's framing, 14 treads; Handrail up the pitch, each rail counted, 15.7–17.2 linear ft.

**Which line on a new staircase quote varies the most?**

The Handrail up the pitch, each rail counted: 4.76–5.21 m for a job measured Rise, finished floor to finished floor 2.7 m · Going of each tread (its run) 260 mm · Width of the stair 0.9 m · Handrails 1, depending on the cutting waste allowed, from 5% to 15%.

**What does a new staircase quote often leave out?**

The reading names every line of the job that nothing on the quote reads as — any of the 2 lines the takeoff measures. The takeoff also lists 5 things it does not measure, shown under the reading, and each is worth asking about: a scope missing from a quote tends to become a cost after work has started.

**Can I paste the quote exactly as it came?**

Yes — from an email, a PDF or a spreadsheet, one item to a line. Amounts of money are taken out before anything is read, headings and totals are skipped, and each line is shown with what it was read as, so a misreading is one correction. Quantities in the other unit system are converted and the conversion is shown; a count of boxes is never compared with a count of tiles.

**Does this check the price as well?**

No. It reads quantities, never prices, and this site publishes none: an installed price moves with the market, the season, the access and the specification, so a figure for what the work ought to cost would give you confidence in a number nobody can defend. A quantity against your own measurements is checkable, and every figure here links to the calculator that produced it.

---
Source: https://craftquantities.com/check/new-staircase-quote/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.
