Hold a builder’s quote against the job it prices. Pick the job: its check reads the quote line by line against quantities worked out from the job’s own measurements, and hands you the questions to ask. It compares scope and quantities, never prices.

- 80 Jobs covered
- 506 (US customary) / 497 (metric)Lines checkable
- None, deliberately Prices published

## Find the job on your quote

All 80 checks, by group.

## Not one job, or no quote yet?

- [Several quotes for the same job Open the job’s check and press Compare quotes: two to six quotes side by side against the job’s lines, with what each one leaves out.](https://craftquantities.com/check/kitchen-refit-quote/#compare)
- [Quote to Estimate Any quote, any job: read every line into a sheet you can correct, keep and compare, then send it to My Project.](https://craftquantities.com/quote-to-estimate/)
- [Work it out first The job takeoffs give every quantity for a job before anybody quotes it.](https://craftquantities.com/build/)

## Interiors 20 jobs

Boarding, finishes, floors and trim inside a finished shell.

- ### [Plastering and plasterboarding](https://craftquantities.com/check/plastering-quote/)

  8 lines · 4 measurements · about 3 min

  Boards, dot-and-dab adhesive, screws, tape, filler, bead and skim — most of a real quote's material content.

  - Plasterboard / drywall sheets
  - Ceiling boards
  - Dot-and-dab adhesive (direct bond)
  - Drywall screws
  - and 4 more

  From the takeoff [Plaster a room](https://craftquantities.com/build/plaster-room/)
- ### [Room fit-out](https://craftquantities.com/check/room-fitout-quote/)

  7 lines · 5 measurements · about 3 min

  - Drywall
  - Ceiling Plasterboard (Gypsum Board Sheets)
  - Drywall Joint Compound
  - Paint
  - and 3 more

  From the takeoff [Room fit-out](https://craftquantities.com/build/room-fitout/)
- ### [Stud partition](https://craftquantities.com/check/stud-wall-quote/)

  3 lines · 3 measurements · about 2 min

  - Framing Stud
  - Drywall Joint Compound
  - Outlet Spacing

  From the takeoff [Stud partition](https://craftquantities.com/build/stud-wall/)
- ### [Floor tiling](https://craftquantities.com/check/tile-floor-quote/)

  4 lines · 2 measurements · about 2 min

  - Tile Backer Board
  - Thinset & Tile Adhesive
  - Floor & Wall Tile

  From the takeoff [Tile a floor](https://craftquantities.com/build/tile-floor/)
- ### [Room plastering](https://craftquantities.com/check/plaster-room-quote/)

  3 lines · 5 measurements · about 3 min

  - Plaster Angle and Stop Bead
  - Skim Coat Plaster
  - Drywall Joint Tape

  From the takeoff [Plaster a room](https://craftquantities.com/build/plaster-room/)
- ### [Drywall ceiling](https://craftquantities.com/check/drywall-ceiling-quote/)

  6 lines · 2 measurements · about 2 min

  - Ceiling Plasterboard (Gypsum Board Sheets)
  - Drywall Ceiling Screw Count (Fastening Schedule)
  - Drywall Joint Compound
  - Drywall Joint Tape
  - and 1 more

  From the takeoff [Drywall ceiling](https://craftquantities.com/build/drywall-ceiling/)
- ### [Room repaint](https://craftquantities.com/check/room-repaint-quote/)

  4 lines · 6 measurements · about 3 min

  - Paint Primer
  - Ceiling Paint
  - Paint
  - Woodwork Paint

  From the takeoff [Repaint a room](https://craftquantities.com/build/room-repaint/)
- ### [Wall tiling](https://craftquantities.com/check/wall-tile-quote/)

  3 lines · 2 measurements · about 2 min

  - Tile Backer Board
  - Tile & Grout
  - Thinset & Tile Adhesive

  From the takeoff [Tile a wall](https://craftquantities.com/build/wall-tile/)
- ### [Laminate or vinyl plank floor](https://craftquantities.com/check/resilient-floor-quote/)

  3 lines · 2 measurements · about 2 min

  - LVP, Laminate & Engineered Floor
  - Laminate/Vinyl Plank Floor Underlayment Roll
  - Self-Leveling Underlayment (SLU) Volume

  From the takeoff [LVP, laminate or engineered floor](https://craftquantities.com/build/resilient-floor/)
- ### [Carpet and underlay](https://craftquantities.com/check/carpet-and-pad-quote/)

  3 lines · 4 measurements · about 3 min

  - Carpet Roll Length & Waste
  - Carpet Cushion Roll
  - Carpet Seam Tape and Sealer

  From the takeoff [Carpet and cushion](https://craftquantities.com/build/carpet-and-pad/)
- ### [Baseboard and casing](https://craftquantities.com/check/trim-run-quote/)

  2 lines · 5 measurements · about 3 min

  - Baseboard & Trim
  - Door & Window Casing

  From the takeoff [Baseboard and casing](https://craftquantities.com/build/trim-run/)
- ### [Suspended ceiling](https://craftquantities.com/check/suspended-ceiling-quote/)

  3 lines · 3 measurements · about 2 min

  - Drop Ceiling Tile
  - Suspended Ceiling Wire Hanger Count
  - Suspended Ceiling Wall Angle Take-Off

  From the takeoff [Suspended ceiling grid](https://craftquantities.com/build/suspended-ceiling/)
- ### [Garage conversion](https://craftquantities.com/check/garage-conversion-quote/)

  25 lines · 9 measurements · about 4 min

  - Concrete CMU Block Counter & Grout Infill
  - Brick
  - Brick Veneer Wall Tie Density
  - Cavity Wall Weep Hole Spacing
  - and 15 more

  From the takeoff [Garage conversion](https://craftquantities.com/build/garage-conversion/)
- ### [Basement conversion](https://craftquantities.com/check/basement-conversion-quote/)

  13 lines (US customary) / 12 lines (metric) · 6 measurements · about 3 min

  _US customary:_

  - Skip & Dumpster Size
  - Perimeter Weeping Tile Pipe Segment
  - Foam Board Insulation
  - Framing Stud
  - and 8 more

  _metric:_

  - Skip & Dumpster Size
  - Perimeter Weeping Tile Pipe Segment
  - Foam Board Insulation
  - Framing Stud
  - and 7 more

  From the takeoff [Basement or cellar conversion](https://craftquantities.com/build/basement-conversion/)
- ### [Staircase replacement](https://craftquantities.com/check/staircase-replacement-quote/)

  6 lines (US customary) / 4 lines (metric) · 10 measurements · about 4 min

  _US customary:_

  - Skim Coat Plaster
  - Handrail Length
  - Deck Baluster
  - Woodwork Paint
  - and 1 more

  _metric:_

  - Skim Coat Plaster
  - Handrail Length
  - Woodwork Paint
  - Skip & Dumpster Size

  From the takeoff [Staircase replacement](https://craftquantities.com/build/staircase-replacement/)
- ### [New staircase](https://craftquantities.com/check/new-staircase-quote/)

  2 lines · 4 measurements · about 3 min

  - L-Shaped and U-Shaped Stair (Landings, Winders, Stringers, Treads and Risers)
  - Handrail Length

  From the takeoff [New staircase by type](https://craftquantities.com/build/new-staircase/)
- ### [Fitted wardrobe](https://craftquantities.com/check/fitted-wardrobe-quote/)

  3 lines · 7 measurements · about 3 min

  - Closet Shelving
  - Baseboard & Trim
  - Woodwork Paint

  From the takeoff [Fitted wardrobe](https://craftquantities.com/build/fitted-wardrobe/)
- ### [Party wall soundproofing](https://craftquantities.com/check/party-wall-soundproofing-quote/)

  8 lines · 3 measurements · about 2 min

  - Framing Stud
  - Mineral Wool Insulation Batt
  - Mass-Loaded Vinyl (MLV) Soundproofing Barrier
  - Ceiling Plasterboard (Gypsum Board Sheets)
  - and 4 more

  From the takeoff [Party wall soundproofing](https://craftquantities.com/build/party-wall-soundproofing/)
- ### [Damp proofing and replastering](https://craftquantities.com/check/damp-remediation-quote/)

  4 lines · 8 measurements · about 4 min

  - Skim Coat Plaster
  - Baseboard & Trim
  - Paint
  - Skip & Dumpster Size

  From the takeoff [Damp remediation and replastering](https://craftquantities.com/build/damp-remediation/)
- ### [Floor sanding and refinishing](https://craftquantities.com/check/floor-sanding-refinish-quote/)

  4 lines · 5 measurements · about 3 min

  - Floor Sanding and Finish
  - Baseboard & Trim
  - Floor Transition Strip
  - Skip & Dumpster Size

  From the takeoff [Floor sanding and refinishing](https://craftquantities.com/build/floor-sanding-refinish/)

## Kitchens and bathrooms 7 jobs

The rooms where waterproofing decides whether the rest of it lasts.

- ### [Bathroom](https://craftquantities.com/check/bathroom-quote/)

  6 lines · 4 measurements · about 3 min

  Tiles, adhesive, grout, boards, tanking and ceiling paint, against the room you are standing in.

  - Wall and floor tiling
  - Tile adhesive
  - Grout
  - Tanking or waterproof membrane
  - and 2 more

  From the takeoff [Bathroom remodel](https://craftquantities.com/build/bathroom-remodel/)
- ### [Kitchen refit](https://craftquantities.com/check/kitchen-refit-quote/)

  15 lines · 17 measurements · about 6 min

  - Kitchen Unit and Cabinet Run
  - Floor & Wall Tile
  - Thinset & Tile Adhesive
  - Grout
  - and 7 more

  From the takeoff [Kitchen refit](https://craftquantities.com/build/kitchen-refit/)
- ### [Bathroom remodel](https://craftquantities.com/check/bathroom-remodel-quote/)

  4 lines · 4 measurements · about 3 min

  - Tile Backer Board
  - Floor & Wall Tile
  - Bathroom Extract Fan Rate and Duct Resistance
  - Thinset & Tile Adhesive

  From the takeoff [Bathroom remodel](https://craftquantities.com/build/bathroom-remodel/)
- ### [Shower enclosure](https://craftquantities.com/check/shower-enclosure-quote/)

  4 lines · 8 measurements · about 4 min

  - Wet Room Tanking and Waterproof Membrane
  - Tile Backer Board
  - Tile & Grout
  - Thinset & Tile Adhesive

  From the takeoff [Shower enclosure](https://craftquantities.com/build/shower-enclosure/)
- ### [Kitchen splashback](https://craftquantities.com/check/kitchen-splashback-quote/)

  3 lines · 3 measurements · about 2 min

  - Countertop Area
  - Tile & Grout
  - Thinset & Tile Adhesive

  From the takeoff [Kitchen splashback](https://craftquantities.com/build/kitchen-splashback/)
- ### [Heated bathroom floor](https://craftquantities.com/check/heated-bathroom-floor-quote/)

  4 lines · 4 measurements · about 3 min

  - Radiant Floor PEX Tubing
  - Floor Crack Isolation Membrane Coverage
  - Floor & Wall Tile
  - Thinset & Tile Adhesive

  From the takeoff [Heated bathroom floor](https://craftquantities.com/build/heated-bathroom-floor/)
- ### [Wet-room tanking](https://craftquantities.com/check/wet-room-tanking-quote/)

  3 lines · 7 measurements · about 3 min

  - Wet Room Tanking and Waterproof Membrane
  - Floor Crack Isolation Membrane Coverage
  - Tile Backer Board

  From the takeoff [Wet-room tanking](https://craftquantities.com/build/wet-room-tanking/)

## Envelope 21 jobs

Framing, sheathing, cladding, roofing and insulation — everything that keeps weather out.

- ### [External wall finish](https://craftquantities.com/check/external-wall-quote/)

  3 lines · 2 measurements · about 2 min

  - House Wrap
  - Siding
  - Exterior Paint

  From the takeoff [External wall finish](https://craftquantities.com/build/external-wall/)
- ### [Floor insulation](https://craftquantities.com/check/insulate-floor-quote/)

  3 lines · 2 measurements · about 2 min

  - Foam Board Insulation
  - Vapor Barrier
  - Laminate/Vinyl Plank Floor Underlayment Roll

  From the takeoff [Insulate a floor](https://craftquantities.com/build/insulate-floor/)
- ### [Fibre cement siding](https://craftquantities.com/check/fiber-cement-siding-quote/)

  4 lines · 4 measurements · about 3 min

  - Fiber-Cement Siding Cutting Waste Factor
  - Fiber-Cement Siding Corner Post
  - Lap Siding Fastener Schedule
  - Fiber-Cement Siding Caulk Joint Volume

  From the takeoff [Fibre cement siding](https://craftquantities.com/build/fiber-cement-siding/)
- ### [Asphalt shingle roof](https://craftquantities.com/check/asphalt-shingle-roof-quote/)

  7 lines · 11 measurements · about 4 min

  - Roofing Shingle
  - Roofing Underlayment
  - Roof Eave Ice Dam Protection Membrane Footprint (and Valley Lining)
  - Roof Ridge Cap
  - and 2 more

  From the takeoff [Asphalt shingle roof](https://craftquantities.com/build/asphalt-shingle-roof/)
- ### [Standing seam roof](https://craftquantities.com/check/standing-seam-roof-quote/)

  3 lines · 3 measurements · about 2 min

  - Standing Seam Metal Roof Clip Count
  - Roofing Underlayment

  From the takeoff [Standing seam metal roof](https://craftquantities.com/build/standing-seam-roof/)
- ### [Fascia, soffit and gutter](https://craftquantities.com/check/eaves-and-rainwater-quote/)

  5 lines · 3 measurements · about 2 min

  - Fascia Board
  - Soffit Panel
  - Gutter
  - Gutter Hanger Spacing
  - and 1 more

  From the takeoff [Eaves and rainwater](https://craftquantities.com/build/eaves-and-rainwater/)
- ### [Attic insulation](https://craftquantities.com/check/attic-insulation-quote/)

  3 lines · 5 measurements · about 3 min

  - Attic Insulation Upgrade
  - Blown-In Insulation Bag Count
  - Insulation Batt

  From the takeoff [Attic insulation upgrade](https://craftquantities.com/build/attic-insulation/)
- ### [Window replacement](https://craftquantities.com/check/window-replacement-quote/)

  2 lines · 4 measurements · about 3 min

  - Window Opening Flashing Membrane
  - Door & Window Casing

  From the takeoff [Window replacement](https://craftquantities.com/build/window-replacement/)
- ### [Framed exterior wall](https://craftquantities.com/check/framed-exterior-wall-quote/)

  6 lines · 8 measurements · about 4 min

  - Framing Stud
  - Insulation Batt
  - Wall Plates, Headers and Cripples (Sole Plate, Head Binder, Lintel and Corner Studs)
  - Plywood and OSB Sheet (Subfloor, Wall and Roof)
  - and 2 more

  From the takeoff [Framed exterior wall](https://craftquantities.com/build/framed-exterior-wall/)
- ### [Flat roof replacement](https://craftquantities.com/check/flat-roof-replacement-quote/)

  8 lines · 7 measurements · about 3 min

  - Foam Board Insulation
  - EPDM Single-Ply Roofing Roll
  - Roof Perimeter Termination Bar
  - Roof Membrane Termination Bar Fastener
  - and 4 more

  From the takeoff [Flat roof replacement (warm roof)](https://craftquantities.com/build/flat-roof-replacement/)
- ### [Loft conversion](https://craftquantities.com/check/loft-conversion-dormer-quote/)

  30 lines (US customary) / 29 lines (metric) · 17 measurements · about 6 min

  _US customary:_

  - Plywood and OSB Sheet (Subfloor, Wall and Roof)
  - Foam Board Insulation
  - EPDM Single-Ply Roofing Roll
  - Roof Perimeter Termination Bar
  - and 19 more

  _metric:_

  - Plywood and OSB Sheet (Subfloor, Wall and Roof)
  - Foam Board Insulation
  - EPDM Single-Ply Roofing Roll
  - Roof Perimeter Termination Bar
  - and 18 more

  From the takeoff [Loft conversion with a dormer](https://craftquantities.com/build/loft-conversion-dormer/)
- ### [Loft room](https://craftquantities.com/check/loft-room-rooflights-quote/)

  15 lines (US customary) / 14 lines (metric) · 11 measurements · about 4 min

  _US customary:_

  - Framing Stud
  - Foam Board Insulation
  - Mineral Wool Insulation Batt
  - Ceiling Plasterboard (Gypsum Board Sheets)
  - and 5 more

  _metric:_

  - Framing Stud
  - Foam Board Insulation
  - Mineral Wool Insulation Batt
  - Ceiling Plasterboard (Gypsum Board Sheets)
  - and 4 more

  From the takeoff [Loft room with rooflights](https://craftquantities.com/build/loft-room-rooflights/)
- ### [Pitched roof re-covering](https://craftquantities.com/check/pitched-roof-recovering-quote/)

  9 lines (US customary) / 8 lines (metric) · 10 measurements · about 4 min

  _US customary:_

  - Roof Eave Ice Dam Protection Membrane Footprint (and Valley Lining)
  - Roofing Underlayment
  - Attic Rafter Baffle/Chute Count
  - Roof Squares
  - and 5 more

  _metric:_

  - Roof Eave Ice Dam Protection Membrane Footprint (and Valley Lining)
  - Roofing Underlayment
  - Attic Rafter Baffle/Chute Count
  - Roof Covering Fixing
  - and 4 more

  From the takeoff [Pitched roof re-covering](https://craftquantities.com/build/pitched-roof-recovering/)
- ### [New window or door opening](https://craftquantities.com/check/new-external-opening-quote/)

  7 lines · 10 measurements · about 4 min

  - Brick
  - Window Opening Flashing Membrane
  - Plaster Angle and Stop Bead
  - Float and Set Plaster
  - and 2 more

  From the takeoff [New window or door opening in an outside wall](https://craftquantities.com/build/new-external-opening/)
- ### [External wall insulation](https://craftquantities.com/check/external-wall-insulation-quote/)

  9 lines · 11 measurements · about 4 min

  - EIFS Foam Board Adhesive Coverage
  - Continuous Insulation Fastener Count
  - EIFS Reinforcing Mesh Roll Count
  - EIFS Impact-Resistant Mesh Reinforcement Zone
  - and 4 more

  From the takeoff [External wall insulation (EWI, EIFS)](https://craftquantities.com/build/external-wall-insulation/)
- ### [Rainscreen cladding](https://craftquantities.com/check/rainscreen-cladding-quote/)

  9 lines (US customary) / 10 lines (metric) · 8 measurements · about 4 min

  _US customary:_

  - House Wrap
  - Rain-Screen Cladding Furring Strip
  - Cavity Barrier Run and Crossing Count
  - Exterior Flashing Layout Trim Sheet
  - and 4 more

  _metric:_

  - House Wrap
  - Rain-Screen Cladding Furring Strip
  - Cavity Barrier Run and Crossing Count
  - Exterior Flashing Layout Trim Sheet
  - and 4 more

  From the takeoff [Rainscreen cladding on battens](https://craftquantities.com/build/rainscreen-cladding/)
- ### [External door replacement](https://craftquantities.com/check/external-door-replacement-quote/)

  5 lines · 3 measurements · about 2 min

  - Window Opening Flashing Membrane
  - Door & Window Casing
  - Caulk & Sealant
  - Woodwork Paint
  - and 1 more

  From the takeoff [External door replacement, with its frame](https://craftquantities.com/build/external-door-replacement/)
- ### [Exterior repaint](https://craftquantities.com/check/exterior-repaint-quote/)

  7 lines · 16 measurements · about 6 min

  - Paint Primer
  - Woodwork Paint
  - Exterior Paint
  - Metalwork and Railing Paint
  - and 1 more

  From the takeoff [Exterior repaint of a house](https://craftquantities.com/build/exterior-repaint/)
- ### [Repointing](https://craftquantities.com/check/repointing-quote/)

  3 lines · 9 measurements · about 4 min

  - Tuckpointing Mortar Repair Volume
  - Lime Mortar Mix (NHL and Lime Putty)
  - Caulk & Sealant

  From the takeoff [Repointing brickwork (tuckpointing)](https://craftquantities.com/build/repointing/)
- ### [Cavity wall insulation](https://craftquantities.com/check/cavity-wall-insulation-quote/)

  1 line · 5 measurements · about 3 min

  - Cavity Wall & Stud Bay Insulation Fill

  From the takeoff [Cavity wall insulation (retrofit fill)](https://craftquantities.com/build/cavity-wall-insulation/)
- ### [Structural insulated panel wall](https://craftquantities.com/check/sip-wall-quote/)

  4 lines · 8 measurements · about 4 min

  - SIP Wall Panel (Structural Insulated Panels, Splines and Plates)
  - House Wrap
  - Siding
  - Drywall

  From the takeoff [SIP wall (structural insulated panels)](https://craftquantities.com/build/sip-wall/)

## Structure and site 16 jobs

Concrete, groundworks, decks and hard landscaping.

- ### [Concrete slab](https://craftquantities.com/check/concrete-slab-quote/)

  3 lines · 3 measurements · about 2 min

  - Concrete
  - Rebar
  - Concrete Formwork

  From the takeoff [Concrete slab](https://craftquantities.com/build/concrete-slab/)
- ### [Timber deck](https://craftquantities.com/check/timber-deck-quote/)

  4 lines · 2 measurements · about 2 min

  - Deck Board
  - Deck Footing
  - Deck Screws
  - Deck Stain

  From the takeoff [Timber deck](https://craftquantities.com/build/timber-deck/)
- ### [Retaining wall](https://craftquantities.com/check/retaining-wall-quote/)

  4 lines · 3 measurements · about 2 min

  - Retaining Wall Block
  - Gravel Base Layer Tonnage
  - Retaining Wall Drainage Gravel
  - Geogrid Reinforcement Layer Count

  From the takeoff [Segmental retaining wall](https://craftquantities.com/build/retaining-wall/)
- ### [Masonry wall](https://craftquantities.com/check/masonry-wall-quote/)

  4 lines · 2 measurements · about 2 min

  - Cavity Wall Weep Hole Spacing
  - Brick
  - Brick Veneer Anchor Spacing
  - Brick Movement Joint Spacing

  From the takeoff [Build a masonry wall](https://craftquantities.com/build/masonry-wall/)
- ### [Strip footing](https://craftquantities.com/check/strip-footing-quote/)

  3 lines · 5 measurements · about 3 min

  - Continuous Footing / Grade Beam Volume
  - Trench Excavation & Backfill Volume
  - Rebar

  From the takeoff [Strip footing](https://craftquantities.com/build/strip-footing/)
- ### [Concrete driveway](https://craftquantities.com/check/concrete-driveway-quote/)

  2 lines · 3 measurements · about 2 min

  - Concrete Driveway
  - Rebar

  From the takeoff [Concrete driveway](https://craftquantities.com/build/concrete-driveway/)
- ### [Basement wall](https://craftquantities.com/check/basement-wall-quote/)

  5 lines · 4 measurements · about 3 min

  - Concrete
  - Rebar
  - Wall Formwork and Shuttering (Form Area, Ties, Wales and Studs for a Poured Wall)
  - Basement Wall Waterproofing Coating Coverage
  - and 1 more

  From the takeoff [Basement or foundation wall (poured concrete)](https://craftquantities.com/build/basement-wall/)
- ### [Water and sewer connection](https://craftquantities.com/check/service-connections-quote/)

  4 lines · 9 measurements · about 4 min

  - Trench Excavation & Backfill Volume
  - Pipe, Conduit and Cable Run (Length, Fittings and Supports from a Measured Route)

  From the takeoff [New-build service connections (water and sewer)](https://craftquantities.com/build/service-connections/)
- ### [Paver patio](https://craftquantities.com/check/paver-patio-quote/)

  5 lines · 2 measurements · about 2 min

  - Paver
  - Paver Base & Sand
  - Paver Edging
  - Paver Polymeric Sand
  - and 1 more

  From the takeoff [Paver patio](https://craftquantities.com/build/paver-patio/)
- ### [Fence](https://craftquantities.com/check/fence-run-quote/)

  3 lines · 2 measurements · about 2 min

  - Fence
  - Fence Picket
  - Post Hole Concrete

  From the takeoff [Fence run](https://craftquantities.com/build/fence-run/)
- ### [Wall removal](https://craftquantities.com/check/internal-wall-removal-quote/)

  11 lines · 9 measurements · about 4 min

  - Ceiling Plasterboard (Gypsum Board Sheets)
  - Plaster Angle and Stop Bead
  - Float and Set Plaster
  - Skim Coat Plaster
  - and 5 more

  From the takeoff [Internal wall removal](https://craftquantities.com/build/internal-wall-removal/)
- ### [Extension shell](https://craftquantities.com/check/extension-shell-quote/)

  22 lines · 14 measurements · about 5 min

  - Trench Excavation & Backfill Volume
  - Continuous Footing / Grade Beam Volume
  - Concrete CMU Block Counter & Grout Infill
  - Gravel Base Layer Tonnage
  - and 13 more

  From the takeoff [Extension shell, one or two storeys](https://craftquantities.com/build/extension-shell/)
- ### [Chimney breast removal](https://craftquantities.com/check/chimney-breast-removal-quote/)

  7 lines (US customary) / 6 lines (metric) · 11 measurements · about 4 min

  _US customary:_

  - Ceiling Plasterboard (Gypsum Board Sheets)
  - Drywall Joint Compound
  - Drywall Joint Tape
  - Paint
  - and 2 more

  _metric:_

  - Float and Set Plaster
  - Ceiling Plasterboard (Gypsum Board Sheets)
  - Skim Coat Plaster
  - Paint
  - and 2 more

  From the takeoff [Chimney breast removal](https://craftquantities.com/build/chimney-breast-removal/)
- ### [Porch](https://craftquantities.com/check/porch-addition-quote/)

  33 lines (US customary) / 31 lines (metric) · 16 measurements · about 6 min

  _US customary:_

  - Trench Excavation & Backfill Volume
  - Continuous Footing / Grade Beam Volume
  - Concrete CMU Block Counter & Grout Infill
  - Gravel Base Layer Tonnage
  - and 21 more

  _metric:_

  - Trench Excavation & Backfill Volume
  - Continuous Footing / Grade Beam Volume
  - Concrete CMU Block Counter & Grout Infill
  - Gravel Base Layer Tonnage
  - and 20 more

  From the takeoff [Porch addition](https://craftquantities.com/build/porch-addition/)
- ### [Garden room](https://craftquantities.com/check/garden-room-quote/)

  31 lines (US customary) / 30 lines (metric) · 15 measurements · about 5 min

  _US customary:_

  - Trench Excavation & Backfill Volume
  - Circular Pier / Cylinder Concrete
  - Gravel Base Layer Tonnage
  - Foam Board Insulation
  - and 21 more

  _metric:_

  - Trench Excavation & Backfill Volume
  - Gravel Base Layer Tonnage
  - Foam Board Insulation
  - Framing Stud
  - and 19 more

  From the takeoff [Garden room or backyard office](https://craftquantities.com/build/garden-room/)
- ### [Detached garage](https://craftquantities.com/check/detached-garage-quote/)

  18 lines · 14 measurements · about 5 min

  - Trench Excavation & Backfill Volume
  - Concrete
  - Framing Stud
  - Plywood and OSB Sheet (Subfloor, Wall and Roof)
  - and 11 more

  From the takeoff [Detached garage (new build)](https://craftquantities.com/build/detached-garage/)

## Services 12 jobs

Electrical, ventilation and heating quantities, taken off the room they serve.

- ### [Electrical rough-in](https://craftquantities.com/check/electrical-rough-in-quote/)

  2 lines · 5 measurements · about 3 min

  - Outlet Spacing
  - EMT Conduit Bend Length

  From the takeoff [Electrical rough-in](https://craftquantities.com/build/electrical-rough-in/)
- ### [Service panel upgrade](https://craftquantities.com/check/panel-upgrade-quote/)

  3 lines · 2 measurements · about 2 min

  - Electrical Panel Load (NEC Service Sizing)
  - Home Electrical Service Panel Amperage Sizing
  - Breaker Size

  From the takeoff [Service panel upgrade](https://craftquantities.com/build/panel-upgrade/)
- ### [Bathroom extractor fan](https://craftquantities.com/check/bathroom-ventilation-quote/)

  4 lines · 7 measurements · about 3 min

  - Bathroom Extract Fan Rate and Duct Resistance
  - HVAC Duct Hanger Support Spacing
  - Duct Insulation Wrap Area
  - Duct Sealing Mastic

  From the takeoff [Bathroom ventilation](https://craftquantities.com/build/bathroom-ventilation/)
- ### [Radiant floor heating](https://craftquantities.com/check/radiant-floor-loop-quote/)

  3 lines · 4 measurements · about 3 min

  - Radiant Floor PEX Tubing
  - Foam Board Insulation
  - Pipe Insulation

  From the takeoff [Radiant floor loop](https://craftquantities.com/build/radiant-floor-loop/)
- ### [Mini-split installation](https://craftquantities.com/check/mini-split-install-quote/)

  1 line · 4 measurements · about 3 min

  - Air Conditioner Size

  From the takeoff [Mini-split installation](https://craftquantities.com/build/mini-split-install/)
- ### [Full rewire](https://craftquantities.com/check/full-rewire-quote/)

  5 lines · 6 measurements · about 3 min

  - Outlet Spacing
  - Penetration Firestop Caulk Volume
  - Skim Coat Plaster
  - Paint Primer
  - and 1 more

  From the takeoff [Full house rewire](https://craftquantities.com/build/full-rewire/)
- ### [Central heating replacement](https://craftquantities.com/check/central-heating-replacement-quote/)

  3 lines · 10 measurements · about 4 min

  - Pipe Insulation
  - Paint
  - Skip & Dumpster Size

  From the takeoff [Central heating replacement](https://craftquantities.com/build/central-heating-replacement/)
- ### [Air-source heat pump](https://craftquantities.com/check/air-source-heat-pump-quote/)

  2 lines · 4 measurements · about 3 min

  - Pipe Insulation
  - Skip & Dumpster Size

  From the takeoff [Air-source heat pump replacing a boiler](https://craftquantities.com/build/air-source-heat-pump/)
- ### [Underfloor heating retrofit](https://craftquantities.com/check/underfloor-heating-retrofit-quote/)

  7 lines · 6 measurements · about 3 min

  - Foam Board Insulation
  - Radiant Floor PEX Tubing
  - Self-Leveling Underlayment (SLU) Volume
  - Floor & Wall Tile
  - and 3 more

  From the takeoff [Wet underfloor heating in an existing floor](https://craftquantities.com/build/underfloor-heating-retrofit/)
- ### [Whole-house ventilation](https://craftquantities.com/check/whole-house-ventilation-quote/)

  5 lines · 9 measurements · about 4 min

  - HVAC Duct Hanger Support Spacing
  - Duct Insulation Wrap Area
  - Duct Sealing Mastic
  - Skip & Dumpster Size

  From the takeoff [Whole-house ventilation (MVHR or HRV)](https://craftquantities.com/build/whole-house-ventilation/)
- ### [Solar panel and battery](https://craftquantities.com/check/solar-pv-battery-quote/)

  1 line · 5 measurements · about 3 min

  - Skip & Dumpster Size

  From the takeoff [Solar panels (PV) with battery storage](https://craftquantities.com/build/solar-pv-battery/)
- ### [EV charger installation](https://craftquantities.com/check/ev-charger-installation-quote/)

  2 lines · 5 measurements · about 3 min

  - EMT Conduit Bend Length
  - Trench Excavation & Backfill Volume

  From the takeoff [EV charger installation](https://craftquantities.com/build/ev-charger-installation/)

## Outdoor 4 jobs

Planting, irrigation and the surfaces around a building.

- ### [Planting bed](https://craftquantities.com/check/landscape-bed-quote/)

  4 lines · 4 measurements · about 3 min

  - Topsoil
  - Landscape Fabric
  - Mulch
  - Lawn Edging

  From the takeoff [Landscape bed](https://craftquantities.com/build/landscape-bed/)
- ### [Irrigation](https://craftquantities.com/check/irrigation-zone-quote/)

  3 lines · 7 measurements · about 3 min

  - Sprinkler Head Spacing and Count
  - Trench Excavation & Backfill Volume

  From the takeoff [Irrigation zone](https://craftquantities.com/build/irrigation-zone/)
- ### [Pool surround](https://craftquantities.com/check/pool-surround-quote/)

  3 lines · 6 measurements · about 3 min

  - Pool Cover & Liner Area
  - Paver
  - Paver Edging

  From the takeoff [Pool surround](https://craftquantities.com/build/pool-surround/)
- ### [Garage floor coating](https://craftquantities.com/check/garage-floor-coating-quote/)

  3 lines · 4 measurements · about 3 min

  - Epoxy Floor Coating
  - Epoxy Flooring Coating Coverage
  - Self-Leveling Underlayment (SLU) Volume

  From the takeoff [Garage floor coating](https://craftquantities.com/build/garage-floor-coating/)

## How a check works

1. 1

   The job's measurements

   Each check asks for the few figures its job is measured by, and runs the site's published calculators on them for every line a quote for that job carries.
2. 2

   Your quote

   Paste it, or open a PDF, a spreadsheet, a text file or a photo. It is read in your browser, never uploaded.
3. 3

   Line by line

   Where a fair choice moves a figure (an allowance for cutting, a lay pattern, a product's coverage), the line is a range with both ends named, and the quote's amount is placed inside, above or below it. Lines the quote leaves out, and lines it adds, are listed too.
4. 4

   Questions, not accusations

   Every line states the assumption behind its range and an ordinary reason a real quote might differ, so what you take back to the builder is a question they can answer in a sentence.

What a check never does: say what the work should cost, size or certify anything structural, or characterise the person who wrote the quote. A quantity is the same in Texas and in Manchester; a price is not, so the checks stay with the part that travels.

The times on the cards are estimates: about fifteen seconds a measurement, plus a minute and a half to paste the quote and read what comes back. Every check names what it does not cover (the prep, the access, the parts no measurement describes), and the [calculators](https://craftquantities.com/calculators/) behind it show their working.

## Frequently asked questions

**Will a check tell me whether the price is fair?**

No. It reads the quantities and the scope: what the quote includes, what it leaves out, and whether each stated amount sits inside the range the job's own measurements give. An installed price moves with the market, the season, access and specification, so the site publishes no prices and passes no verdict on one. Your own rates can be added later in My Project or Quote to Estimate.

**Is my quote sent anywhere?**

No. A pasted or opened quote is read in your browser, including a photo, which is read on the device. Nothing is uploaded, and nothing needs an account.

**My quote counts bags and boxes, not square metres or square feet. Does that matter?**

No. A line's amount is read in the unit it is written in (bags, boxes, sheets, lengths, tons, cubic yards or cubic metres), converted to the unit its calculator works in, and the conversion is shown beside the line, so you can see how the comparison was made.

**What if a line on my quote is not one the check reads?**

It is listed as an extra, with a question to ask about it, rather than ignored. Labour, prep and access often appear that way, because no measurement of the finished job describes them; the check page names what it does not cover for that job.

---
Source: https://craftquantities.com/check/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.