# Check a fascia, soffit and gutter quote

> Paste a fascia, soffit and gutter quote and read it against your own measurements: the lines it leaves out, the ones it adds, the quantities outside the…

Page: https://craftquantities.com/check/eaves-and-rainwater-quote/ (quote check). This is the page's Markdown copy; the HTML page is the canonical version.

Each line read against your measurements: 5 lines, 3 measurements. Quantities, never prices.

Step 1

## Your measurements

Measured this job on the [eaves and rainwater takeoff](https://craftquantities.com/build/eaves-and-rainwater/)? Send it to My Project, or save a setup, and these boxes fill in one press.

Worked from Total eave length 79 ft · Overhang width 18 in · Gutter runs 2 (US customary) / Total eave length 24 m · Overhang width 450 mm · Gutter runs 2 (metric)

How to take each of these, and what each one feeds, is under the same field on the [eaves and rainwater takeoff](https://craftquantities.com/build/eaves-and-rainwater/).

Step 2 · Your quote

## The fascia, soffit and gutter quote you were given

Paste from an email, or open or drop a PDF, Excel, CSV or text file, or a photo of the quote. Amounts of money are taken out before anything is read — this page compares quantities, never prices.

Nothing you paste or open leaves this device.

or one the job needs:

Step 3 · The reading

## What the quote says, against the job

Fascia, soffit and gutter · Total eave length 79 ft · Overhang width 18 in · Gutter runs 2 (US customary) / Total eave length 24 m · Overhang width 450 mm · Gutter runs 2 (metric)

- What it leaves out

  Every line the job needs that nothing on the quote reads as, with the quantity your measurements produce.
- What it adds

  Lines this job's takeoff does not measure — labour, removal, hire, fees, anything else — each named for what it is.
- What sits outside the range

  Quantities above or below the computed range, by how much, in the quote's unit or converted and shown.
- What to ask

  One list of questions, in the quote's order, ready to copy and send. Questions, never a verdict.

Paste the quote above, or add its lines one at a time. The reading appears here as each line is read.

### Outside what this takeoff measures

4

Nothing in the reading measures these. Whether the quote covers each is worth asking in its own right: a scope missing from a quote tends to become a cost after work has started. Why each is left out is on the [takeoff](https://craftquantities.com/build/eaves-and-rainwater/).

- Downpipes, outlets, shoes and everything below the gutter
- Rafter tail repair, which is the commonest hidden cost on this job
- The roof covering and its drip edge, which have to be lifted and relaid at the eave
- Corners, stop ends and mitres

No quote read yet

[Open the takeoff](https://craftquantities.com/build/eaves-and-rainwater/)

Paste a quote

## The job

Total eave length 79 ft · Overhang width 18 in · Gutter runs 2 (US customary) / Total eave length 24 m · Overhang width 450 mm · Gutter runs 2 (metric)

## What the job needs

For these measurements, by the site’s calculators.

_US customary:_

- Fascia Board 7–8 x 12 ft boards
- Soffit Panel 11–12 x 12 sq ft panels
- Gutter 10 x 10 ft sections
- Gutter Hanger Spacing at least 30 hangers
- Gutter Guard 22 x 4 ft sections

_metric:_

- Fascia Board 7–8 x 3.6 m boards
- Soffit Panel 11.3–12.4 m² of soffit board
- Gutter 7 x 4 m sections
- Gutter Hanger Spacing at least 30 hangers
- Gutter Guard 27 x 1 m sections

More than one quote

## Level the quotes side by side

Two to six fascia, soffit and gutter quotes, each read against this job: included, left out, excluded or added, line by line.

Kept on this device**Figures**The page's opening**Units**Imperial Quantities only, never prices

## How the quote is read

Each line of a fascia, soffit and gutter quote is matched to the line of the job it names, or marked as something the [Eaves and rainwater takeoff](https://craftquantities.com/build/eaves-and-rainwater/) does not measure — labour, removal, hire, fees, or anything else.

The job’s own figures come from 3 measurements — total eave length, overhang width, gutter runs — run through the same calculators as the takeoff, so the two give the same figure for the same job.

## Reading a fascia, soffit and gutter quote

Eaves work is quoted along the length of the eave, with the gutter, fascia and soffit either together or as separate trades.

The gutter and hanger counts are worked for the gutter runs given: the hangers are the fewest the spacing allows with at most one spare for each run after the first, and the gutter carries at most one spare section for each run after the first (two in imperial); where snow sits on a roof, hangers are often set closer. The downpipes and outlets are worth confirming, because a gutter run on its own drains nothing.

## Three steps

1. Give your measurements, or fill them from your own takeoff in one press. The page opens on a typical job so it has something to show.
2. Paste the quote's lines as they came, or add them one at a time. Leave the prices in — they are taken out, never read.
3. Read the report: what is left out, what is added, what sits outside the range, and one list of questions to send.

The reference

## Every line the reading looks for

For Total eave length 79 ft · Overhang width 18 in · Gutter runs 2 (US customary) / Total eave length 24 m · Overhang width 450 mm · Gutter runs 2 (metric). Each is the calculator linked under it, run with those measurements; a range is that calculator at both ends of one choice, not a margin for error.

_US customary:_

- Fascia Board

  7–8 x 12 ft boards

  7 at 5% cut and scarf allowance, 8 at 15%.

  [Open the Fascia Board Calculator](https://craftquantities.com/calculators/renovation-construction/fascia-board-calculator/)
- Soffit Panel

  11–12 x 12 sq ft panels

  11 at 5% waste allowance, 12 at 15%.

  [Open the Soffit Panel Calculator](https://craftquantities.com/calculators/renovation-construction/soffit-panel-calculator/)
- Gutter

  10 x 10 ft sections

  One figure, with the offcut allowance the material needs already inside it at 0%.

  [Open the Gutter Calculator](https://craftquantities.com/calculators/renovation-construction/gutter-calculator/)
- Gutter Hanger Spacing

  at least 30 hangers

  The fewest hangers the spacing allows for the runs given, with at most one spare for each run after the first; closer hangers are a choice, often made for snow.

  [Open the Gutter Hanger Spacing Calculator](https://craftquantities.com/calculators/renovation-construction/gutter-hanger-spacing-calculator/)
- Gutter Guard

  22 x 4 ft sections

  One figure, with the overlap allowance the material needs already inside it at 10%.

  [Open the Gutter Guard Calculator](https://craftquantities.com/calculators/materials-quantities/gutter-guard-calculator/)

_metric:_

- Fascia Board

  7–8 x 3.6 m boards

  7 at 5% cut and scarf allowance, 8 at 15%.

  [Open the Fascia Board Calculator](https://craftquantities.com/calculators/renovation-construction/fascia-board-calculator/)
- Soffit Panel

  11.3–12.4 m² of soffit board

  11.3 at 5% waste allowance, 12.4 at 15%.

  [Open the Soffit Panel Calculator](https://craftquantities.com/calculators/renovation-construction/soffit-panel-calculator/)
- Gutter

  7 x 4 m sections

  One figure, with the offcut allowance the material needs already inside it at 0%.

  [Open the Gutter Calculator](https://craftquantities.com/calculators/renovation-construction/gutter-calculator/)
- Gutter Hanger Spacing

  at least 30 hangers

  The fewest hangers the spacing allows for the runs given, with at most one spare for each run after the first; closer hangers are a choice, often made for snow.

  [Open the Gutter Hanger Spacing Calculator](https://craftquantities.com/calculators/renovation-construction/gutter-hanger-spacing-calculator/)
- Gutter Guard

  27 x 1 m sections

  One figure, with the overlap allowance the material needs already inside it at 10%.

  [Open the Gutter Guard Calculator](https://craftquantities.com/calculators/materials-quantities/gutter-guard-calculator/)

## How the ranges are taken

Where the choice is cutting waste, the ends are the site’s own allowances: 5%, the tight buffer of a crew with a planned set-out, and 15%, the wider one a first-timer orders. Where the calculator decides between patterns or materials, the ends are the options it offers. Where it adds nothing for loss, the range runs from the net quantity to 15% over it.

A minimum — the fewest hangers a spacing allows, the least airflow a room needs — has no upper end. A single figure carries an allowance the material itself needs, such as a lap, and names it.

## What a reading like this cannot see

- It does not know your prices, your market, or what the work ought to cost.
- It does not know the building — the access, the condition of what is there, or what has to happen first.
- It cannot check a lump sum, because there is no quantity in one.
- A line it reads as missing may be priced under another name. A quantity outside the range is not evidence of anything. Each is a reason to ask a question.
- Two quotes are not comparable until their scopes are.
- It is not advice, and it is no substitute for a second quote.

The full takeoff

## Every quantity for this job, with its working

The Eaves and rainwater takeoff runs the same calculators on the same measurements and shows what sits under each line here.

- [Open the takeoff](https://craftquantities.com/build/eaves-and-rainwater/)
- [Every quote check](https://craftquantities.com/check/)

- Base, allowance, order

  Each line's quantity before and after its allowance, and what to buy.
- Every allowance editable

  Change a waste figure and the order follows, with its source named.
- Into a project

  Add the whole job to a workspace with your own prices.

## Frequently asked questions

**What quantities does a fascia, soffit and gutter job need?**

It depends on the measurements, so this page asks for yours. At the size it opens on — Total eave length 24 m · Overhang width 450 mm · Gutter runs 2 — the lines come to: Fascia Board, 7–8 x 3.6 m boards; Soffit Panel, 11.3–12.4 m² of soffit board; Gutter, 7 x 4 m sections; Gutter Hanger Spacing, 30 hangers; Gutter Guard, 27 x 1 m sections. In imperial units — Total eave length 79 ft · Overhang width 18 in · Gutter runs 2 — they come to: Fascia Board, 7–8 x 12 ft boards; Soffit Panel, 11–12 x 12 sq ft panels; Gutter, 10 x 10 ft sections; Gutter Hanger Spacing, 30 hangers; Gutter Guard, 22 x 4 ft sections.

**Which line on a fascia, soffit and gutter quote varies the most?**

The Fascia Board: 7–8 x 3.6 m boards for a job measured Total eave length 24 m · Overhang width 450 mm · Gutter runs 2, depending on the cut and scarf allowance allowed, from 5% to 15%.

**What does a fascia, soffit and gutter quote often leave out?**

The reading names every line of the job that nothing on the quote reads as — any of the 5 lines the takeoff measures. The takeoff also lists 4 things it does not measure, shown under the reading, and each is worth asking about: a scope missing from a quote tends to become a cost after work has started.

**Can I paste the quote exactly as it came?**

Yes — from an email, a PDF or a spreadsheet, one item to a line. Amounts of money are taken out before anything is read, headings and totals are skipped, and each line is shown with what it was read as, so a misreading is one correction. Quantities in the other unit system are converted and the conversion is shown; a count of boxes is never compared with a count of tiles.

**Does this check the price as well?**

No. It reads quantities, never prices, and this site publishes none: an installed price moves with the market, the season, the access and the specification, so a figure for what the work ought to cost would give you confidence in a number nobody can defend. A quantity against your own measurements is checkable, and every figure here links to the calculator that produced it.

---