# Check a detached garage quote

> Paste a detached garage quote and read it against your own measurements: the lines it leaves out, the ones it adds, the quantities outside the computed…

Page: https://craftquantities.com/check/detached-garage-quote/ (quote check). This is the page's Markdown copy; the HTML page is the canonical version.

Each line read against your measurements: 17 lines, 14 measurements. Quantities, never prices.

Step 1

## Your measurements

Measured this job on the [detached garage (new build) takeoff](https://craftquantities.com/build/detached-garage/)? Send it to My Project, or save a setup, and these boxes fill in one press.

Worked from Length, along the ridge 20 ft · Width, the garage door's wall 20 ft · Wall height 8 ft · Roof pitch (rise per 12) 6 · Slope factor 1.12 · Eave overhang, each side 11.8 in · Gable overhang, each end 11.8 in · Garage door opening width 16 ft · Garage door opening height 7 ft · Side doors 1 · Windows 1 · Window opening width, each 3 ft · Window opening height, each 3 ft · Dig over the footprint 9.75 in (US customary) / Length, along the ridge 6 m · Width, the garage door's wall 6 m · Wall height 2.4 m · Roof pitch (rise per 12) 6 · Slope factor 1.12 · Eave overhang, each side 300 mm · Gable overhang, each end 300 mm · Garage door opening width 4.8 m · Garage door opening height 2.1 m · Side doors 1 · Windows 1 · Window opening width, each 0.9 m · Window opening height, each 0.9 m · Dig over the footprint 250 mm (metric)

How to take each of these, and what each one feeds, is under the same field on the [detached garage (new build) takeoff](https://craftquantities.com/build/detached-garage/).

Step 2 · Your quote

## The detached garage quote you were given

Paste from an email, or open or drop a PDF, Excel, CSV or text file, or a photo of the quote. Amounts of money are taken out before anything is read — this page compares quantities, never prices.

Nothing you paste or open leaves this device.

or one the job needs:

Step 3 · The reading

## What the quote says, against the job

Detached garage · Length, along the ridge 20 ft · Width, the garage door's wall 20 ft · Wall height 8 ft · Roof pitch (rise per 12) 6 · Slope factor 1.12 · Eave overhang, each side 11.8 in · Gable overhang, each end 11.8 in · Garage door opening width 16 ft · Garage door opening height 7 ft · Side doors 1 · Windows 1 · Window opening width, each 3 ft · Window opening height, each 3 ft · Dig over the footprint 9.75 in (US customary) / Length, along the ridge 6 m · Width, the garage door's wall 6 m · Wall height 2.4 m · Roof pitch (rise per 12) 6 · Slope factor 1.12 · Eave overhang, each side 300 mm · Gable overhang, each end 300 mm · Garage door opening width 4.8 m · Garage door opening height 2.1 m · Side doors 1 · Windows 1 · Window opening width, each 0.9 m · Window opening height, each 0.9 m · Dig over the footprint 250 mm (metric)

- What it leaves out

  Every line the job needs that nothing on the quote reads as, with the quantity your measurements produce.
- What it adds

  Lines this job's takeoff does not measure — labour, removal, hire, fees, anything else — each named for what it is.
- What sits outside the range

  Quantities above or below the computed range, by how much, in the quote's unit or converted and shown.
- What to ask

  One list of questions, in the quote's order, ready to copy and send. Questions, never a verdict.

Paste the quote above, or add its lines one at a time. The reading appears here as each line is read.

### Outside what this takeoff measures

9

Nothing in the reading measures these. Whether the quote covers each is worth asking in its own right: a scope missing from a quote tends to become a cost after work has started. Why each is left out is on the [takeoff](https://craftquantities.com/build/detached-garage/).

- What the slab and the frame must be to carry the garage
- The garage door itself, its track, springs and opener, and the side door and windows as products
- The top and sole plates, the corner posts and the headers over the openings
- Ice-dam membrane at the eaves
- Drip edge, starter strip, ridge vent and any roof penetration
- Insulation, an inside lining, a floor coating or paint inside
- Power, lighting and any circuit to the garage
- A driveway or apron in front of the door, and where the downspouts discharge
- Zoning, planning and permit decisions

No quote read yet

[Open the takeoff](https://craftquantities.com/build/detached-garage/)

Paste a quote

## The job

Length, along the ridge 20 ft · Width, the garage door's wall 20 ft · Wall height 8 ft · Roof pitch (rise per 12) 6 · Slope factor 1.12 · Eave overhang, each side 11.8 in · Gable overhang, each end 11.8 in · Garage door opening width 16 ft · Garage door opening height 7 ft · Side doors 1 · Windows 1 · Window opening width, each 3 ft · Window opening height, each 3 ft · Dig over the footprint 9.75 in (US customary) / Length, along the ridge 6 m · Width, the garage door's wall 6 m · Wall height 2.4 m · Roof pitch (rise per 12) 6 · Slope factor 1.12 · Eave overhang, each side 300 mm · Gable overhang, each end 300 mm · Garage door opening width 4.8 m · Garage door opening height 2.1 m · Side doors 1 · Windows 1 · Window opening width, each 0.9 m · Window opening height, each 0.9 m · Dig over the footprint 250 mm (metric)

## What the job needs

For these measurements, by the site’s calculators.

_US customary:_

- Topsoil and ground dug out over the footprint 15 yd³
- Slab concrete, with its sub-base and edge forms 5.19–5.68 yd³
- Wall studs (studwork)68 studs
- Wall sheathing, OSB or plywood 17–19 sheets (4x8 ft)
- House wrap (breather membrane) on the walls 1 roll
- Flashing tape round the openings 45.2–49.5 ft
- Siding on the walls 5–5.47 squares
- Roof trusses at least 11 trusses
- Roof deck, OSB or plywood 18–20 sheets (4x8 ft)
- Roof underlayment 1 roll
- Asphalt shingles 5.66–6.2 squares
- Ridge cap 1 bundle
- Fascia boards along both eaves 4–5 x 12 ft boards
- Soffit under both eaves 4–5 x 12 sq ft panels
- Gutters and downspouts along both eaves 5 x 10 ft sections
- Skip (dumpster) or muck away for the spoil at least 15 yd³
- Skip or bags for the offcuts and packaging at least 6.08 yd³

_metric:_

- Topsoil and ground dug out over the footprint 11.3 m³ (loose)
- Slab concrete, with its sub-base and edge forms 3.78–4.14 m³
- Wall studs (studwork)68 studs
- Wall sheathing, OSB or plywood 17–18 sheets (2440x1220 mm)
- House wrap (breather membrane) on the walls 1 roll
- Flashing tape round the openings 13.7–14.9 m
- Siding on the walls 44.9–49.1 m²
- Roof trusses at least 11 trusses
- Roof deck, OSB or plywood 18–19 sheets (2440x1220 mm)
- Roof underlayment 1 roll
- Asphalt shingles 51.1–56 m²
- Ridge cap 1 bundle
- Fascia boards along both eaves 4–5 x 3.6 m boards
- Soffit under both eaves 4.16–4.55 m² of soffit board
- Gutters and downspouts along both eaves 4 x 4 m sections
- Skip (dumpster) or muck away for the spoil at least 11.3 m³
- Skip or bags for the offcuts and packaging at least 4.5 m³

More than one quote

## Level the quotes side by side

Two to six detached garage quotes, each read against this job: included, left out, excluded or added, line by line.

Kept on this device**Figures**The page's opening**Units**Imperial Quantities only, never prices

## How the quote is read

Each line of a detached garage quote is matched to the line of the job it names, or marked as something the [Detached garage (new build) takeoff](https://craftquantities.com/build/detached-garage/) does not measure — labour, removal, hire, fees, or anything else. Work the takeoff lists as part of the job but gives no quantity for is read as that work, not as something the quote adds.

The job’s own figures come from 14 measurements — length, along the ridge, width, the garage door's wall, wall height, roof pitch (rise per 12), slope factor, eave overhang, each side, gable overhang, each end, garage door opening width, garage door opening height, side doors, windows, window opening width, each, window opening height, each, dig over the footprint — run through the same calculators as the takeoff, so the two give the same figure for the same job.

## Reading a detached garage quote

A garage is often priced as a shell, with the concrete, the door and any power quoted by others or left out, so two figures for one footprint can describe very different amounts of work. Worth asking whether the slab is in the price, who settled its thickness, its steel and any deeper edge under the walls, and whether the soil dug off the footprint is taken away or left on site.

The trusses usually arrive as their maker's package. Worth seeing whether delivery, lifting them onto the walls, the bracing their drawing shows and the ladders that carry the gable overhangs are part of the figure, and whether the roof rows name the deck, the underlayment, the shingles, the ridge cap, the fascia, the soffit and the gutters one by one.

The garage door is the single largest item a shell quote may leave out. Worth settling whether the door, its track, springs and opener are supplied and fitted under this price or bought separately, who frames and sizes the beam over its opening, and whether the permit, its drawings and the inspections are included.

## Three steps

1. Give your measurements, or fill them from your own takeoff in one press. The page opens on a typical job so it has something to show.
2. Paste the quote's lines as they came, or add them one at a time. Leave the prices in — they are taken out, never read.
3. Read the report: what is left out, what is added, what sits outside the range, and one list of questions to send.

The reference

## Every line the reading looks for

For Length, along the ridge 20 ft · Width, the garage door's wall 20 ft · Wall height 8 ft · Roof pitch (rise per 12) 6 · Slope factor 1.12 · Eave overhang, each side 11.8 in · Gable overhang, each end 11.8 in · Garage door opening width 16 ft · Garage door opening height 7 ft · Side doors 1 · Windows 1 · Window opening width, each 3 ft · Window opening height, each 3 ft · Dig over the footprint 9.75 in (US customary) / Length, along the ridge 6 m · Width, the garage door's wall 6 m · Wall height 2.4 m · Roof pitch (rise per 12) 6 · Slope factor 1.12 · Eave overhang, each side 300 mm · Gable overhang, each end 300 mm · Garage door opening width 4.8 m · Garage door opening height 2.1 m · Side doors 1 · Windows 1 · Window opening width, each 0.9 m · Window opening height, each 0.9 m · Dig over the footprint 250 mm (metric). Each is the calculator linked under it, run with those measurements; a range is that calculator at both ends of one choice, not a margin for error.

_US customary:_

- Topsoil and ground dug out over the footprint

  15 yd³

  One figure, with the loose-volume allowance the material needs already inside it at 25%.

  [Open the Trench Excavation & Backfill Volume Calculator](https://craftquantities.com/calculators/materials-quantities/trench-excavation-backfill-calculator/)
- Slab concrete, with its sub-base and edge forms

  5.19–5.68 yd³

  5.19 at 5% waste factor, 5.68 at 15%.

  [Open the Concrete Calculator](https://craftquantities.com/calculators/materials-quantities/concrete-calculator/)
- Wall studs (studwork)

  68 studs

  One figure, with the spare studs the material needs already inside it at 10%.

  [Open the Framing Stud Calculator](https://craftquantities.com/calculators/renovation-construction/framing-stud-calculator/)
- Wall sheathing, OSB or plywood

  17–19 sheets (4x8 ft)

  17 at 5% waste factor, 19 at 15%.

  [Open the Plywood and OSB Sheet Calculator (Subfloor, Wall and Roof)](https://craftquantities.com/calculators/materials-quantities/plywood-sheet-calculator/)
- House wrap (breather membrane) on the walls

  1 roll

  One figure, with the lap allowance the material needs already inside it at 10%.

  [Open the House Wrap Calculator](https://craftquantities.com/calculators/renovation-construction/house-wrap-calculator/)
- Flashing tape round the openings

  45.2–49.5 ft

  45.2 at 5% waste allowance, 49.5 at 15%.

  [Open the Window Opening Flashing Membrane Calculator](https://craftquantities.com/calculators/materials-quantities/opening-flashing-membrane-calculator/)
- Siding on the walls

  5–5.47 squares

  5 at 5% waste factor, 5.47 at 15%.

  [Open the Siding Calculator](https://craftquantities.com/calculators/renovation-construction/siding-calculator/)
- Roof trusses

  at least 11 trusses

  The fewest rafters or trusses the centres allow along this run, one at each end; closer centres are the designer's choice, and the bracing and straps are extra.

  [Open the Roof Truss Spacing & Count Calculator](https://craftquantities.com/calculators/materials-quantities/roof-truss-spacing-calculator/)
- Roof deck, OSB or plywood

  18–20 sheets (4x8 ft)

  18 at 5% waste factor, 20 at 15%.

  [Open the Plywood and OSB Sheet Calculator (Subfloor, Wall and Roof)](https://craftquantities.com/calculators/materials-quantities/plywood-sheet-calculator/)
- Roof underlayment

  1 roll

  One figure, with the overlap allowance the material needs already inside it at 10%.

  [Open the Roofing Underlayment Calculator](https://craftquantities.com/calculators/renovation-construction/roofing-underlayment-calculator/)
- Asphalt shingles

  5.66–6.2 squares

  5.66 at 5% waste factor, 6.2 at 15%.

  [Open the Roofing Shingle Calculator](https://craftquantities.com/calculators/renovation-construction/roofing-shingle-calculator/)
- Ridge cap

  1 bundle

  The same at 5% cut-end allowance and at 15%, once rounded to what is bought.

  [Open the Roof Ridge Cap Calculator](https://craftquantities.com/calculators/renovation-construction/roof-ridge-cap-calculator/)
- Fascia boards along both eaves

  4–5 x 12 ft boards

  4 at 5% cut and scarf allowance, 5 at 15%.

  [Open the Fascia Board Calculator](https://craftquantities.com/calculators/renovation-construction/fascia-board-calculator/)
- Soffit under both eaves

  4–5 x 12 sq ft panels

  4 at 5% waste allowance, 5 at 15%.

  [Open the Soffit Panel Calculator](https://craftquantities.com/calculators/renovation-construction/soffit-panel-calculator/)
- Gutters and downspouts along both eaves

  5 x 10 ft sections

  One figure, with the offcut allowance the material needs already inside it at 0%.

  [Open the Gutter Calculator](https://craftquantities.com/calculators/renovation-construction/gutter-calculator/)
- Skip (dumpster) or muck away for the spoil

  at least 15 yd³

  The loose volume the waste takes up; the container quoted is at least this big, and a bigger one is a choice.

  [Open the Skip & Dumpster Size Calculator](https://craftquantities.com/calculators/auto-utility/skip-and-dumpster-size-calculator/)
- Skip or bags for the offcuts and packaging

  at least 6.08 yd³

  The loose volume the waste takes up; the container quoted is at least this big, and a bigger one is a choice.

  [Open the Skip & Dumpster Size Calculator](https://craftquantities.com/calculators/auto-utility/skip-and-dumpster-size-calculator/)

_metric:_

- Topsoil and ground dug out over the footprint

  11.3 m³ (loose)

  One figure, with the loose-volume allowance the material needs already inside it at 25%.

  [Open the Trench Excavation & Backfill Volume Calculator](https://craftquantities.com/calculators/materials-quantities/trench-excavation-backfill-calculator/)
- Slab concrete, with its sub-base and edge forms

  3.78–4.14 m³

  3.78 at 5% waste factor, 4.14 at 15%.

  [Open the Concrete Calculator](https://craftquantities.com/calculators/materials-quantities/concrete-calculator/)
- Wall studs (studwork)

  68 studs

  One figure, with the spare studs the material needs already inside it at 10%.

  [Open the Framing Stud Calculator](https://craftquantities.com/calculators/renovation-construction/framing-stud-calculator/)
- Wall sheathing, OSB or plywood

  17–18 sheets (2440x1220 mm)

  17 at 5% waste factor, 18 at 15%.

  [Open the Plywood and OSB Sheet Calculator (Subfloor, Wall and Roof)](https://craftquantities.com/calculators/materials-quantities/plywood-sheet-calculator/)
- House wrap (breather membrane) on the walls

  1 roll

  One figure, with the lap allowance the material needs already inside it at 10%.

  [Open the House Wrap Calculator](https://craftquantities.com/calculators/renovation-construction/house-wrap-calculator/)
- Flashing tape round the openings

  13.7–14.9 m

  13.7 at 5% waste allowance, 14.9 at 15%.

  [Open the Window Opening Flashing Membrane Calculator](https://craftquantities.com/calculators/materials-quantities/opening-flashing-membrane-calculator/)
- Siding on the walls

  44.9–49.1 m²

  44.9 at 5% waste factor, 49.1 at 15%.

  [Open the Siding Calculator](https://craftquantities.com/calculators/renovation-construction/siding-calculator/)
- Roof trusses

  at least 11 trusses

  The fewest rafters or trusses the centres allow along this run, one at each end; closer centres are the designer's choice, and the bracing and straps are extra.

  [Open the Roof Truss Spacing & Count Calculator](https://craftquantities.com/calculators/materials-quantities/roof-truss-spacing-calculator/)
- Roof deck, OSB or plywood

  18–19 sheets (2440x1220 mm)

  18 at 5% waste factor, 19 at 15%.

  [Open the Plywood and OSB Sheet Calculator (Subfloor, Wall and Roof)](https://craftquantities.com/calculators/materials-quantities/plywood-sheet-calculator/)
- Roof underlayment

  1 roll

  One figure, with the overlap allowance the material needs already inside it at 10%.

  [Open the Roofing Underlayment Calculator](https://craftquantities.com/calculators/renovation-construction/roofing-underlayment-calculator/)
- Asphalt shingles

  51.1–56 m²

  51.1 at 5% waste factor, 56 at 15%.

  [Open the Roofing Shingle Calculator](https://craftquantities.com/calculators/renovation-construction/roofing-shingle-calculator/)
- Ridge cap

  1 bundle

  The same at 5% cut-end allowance and at 15%, once rounded to what is bought.

  [Open the Roof Ridge Cap Calculator](https://craftquantities.com/calculators/renovation-construction/roof-ridge-cap-calculator/)
- Fascia boards along both eaves

  4–5 x 3.6 m boards

  4 at 5% cut and scarf allowance, 5 at 15%.

  [Open the Fascia Board Calculator](https://craftquantities.com/calculators/renovation-construction/fascia-board-calculator/)
- Soffit under both eaves

  4.16–4.55 m² of soffit board

  4.16 at 5% waste allowance, 4.55 at 15%.

  [Open the Soffit Panel Calculator](https://craftquantities.com/calculators/renovation-construction/soffit-panel-calculator/)
- Gutters and downspouts along both eaves

  4 x 4 m sections

  One figure, with the offcut allowance the material needs already inside it at 0%.

  [Open the Gutter Calculator](https://craftquantities.com/calculators/renovation-construction/gutter-calculator/)
- Skip (dumpster) or muck away for the spoil

  at least 11.3 m³

  The loose volume the waste takes up; the container quoted is at least this big, and a bigger one is a choice.

  [Open the Skip & Dumpster Size Calculator](https://craftquantities.com/calculators/auto-utility/skip-and-dumpster-size-calculator/)
- Skip or bags for the offcuts and packaging

  at least 4.5 m³

  The loose volume the waste takes up; the container quoted is at least this big, and a bigger one is a choice.

  [Open the Skip & Dumpster Size Calculator](https://craftquantities.com/calculators/auto-utility/skip-and-dumpster-size-calculator/)

## How the ranges are taken

Where the choice is cutting waste, the ends are the site’s own allowances: 5%, the tight buffer of a crew with a planned set-out, and 15%, the wider one a first-timer orders. Where the calculator decides between patterns or materials, the ends are the options it offers. Where it adds nothing for loss, the range runs from the net quantity to 15% over it.

A minimum — the fewest hangers a spacing allows, the least airflow a room needs — has no upper end. A single figure carries an allowance the material itself needs, such as a lap, and names it.

## What a reading like this cannot see

- It does not know your prices, your market, or what the work ought to cost.
- It does not know the building — the access, the condition of what is there, or what has to happen first.
- It cannot check a lump sum, because there is no quantity in one.
- A line it reads as missing may be priced under another name. A quantity outside the range is not evidence of anything. Each is a reason to ask a question.
- Two quotes are not comparable until their scopes are.
- It is not advice, and it is no substitute for a second quote.

The full takeoff

## Every quantity for this job, with its working

The Detached garage (new build) takeoff runs the same calculators on the same measurements and shows what sits under each line here.

- [Open the takeoff](https://craftquantities.com/build/detached-garage/)
- [Every quote check](https://craftquantities.com/check/)

- Base, allowance, order

  Each line's quantity before and after its allowance, and what to buy.
- Every allowance editable

  Change a waste figure and the order follows, with its source named.
- Into a project

  Add the whole job to a workspace with your own prices.

## Frequently asked questions

**What quantities does a detached garage job need?**

It depends on the measurements, so this page asks for yours. At the size it opens on — Length, along the ridge 6 m · Width, the garage door's wall 6 m · Wall height 2.4 m · Roof pitch (rise per 12) 6 · Slope factor 1.12 · Eave overhang, each side 300 mm · Gable overhang, each end 300 mm · Garage door opening width 4.8 m · Garage door opening height 2.1 m · Side doors 1 · Windows 1 · Window opening width, each 0.9 m · Window opening height, each 0.9 m · Dig over the footprint 250 mm — the lines come to: Topsoil and ground dug out over the footprint, 11.3 m³ (loose); Slab concrete, with its sub-base and edge forms, 3.78–4.14 m³; Wall studs (studwork), 68 studs; Wall sheathing, OSB or plywood, 17–18 sheets (2440x1220 mm); House wrap (breather membrane) on the walls, 1 roll; Flashing tape round the openings, 13.7–14.9 m; Siding on the walls, 44.9–49.1 m²; Roof trusses, 11 trusses; Roof deck, OSB or plywood, 18–19 sheets (2440x1220 mm); Roof underlayment, 1 roll; Asphalt shingles, 51.1–56 m²; Ridge cap, 1 bundle; Fascia boards along both eaves, 4–5 x 3.6 m boards; Soffit under both eaves, 4.16–4.55 m² of soffit board; Gutters and downspouts along both eaves, 4 x 4 m sections; Skip (dumpster) or muck away for the spoil, 11.3 m³; Skip or bags for the offcuts and packaging, 4.5 m³. In imperial units — Length, along the ridge 20 ft · Width, the garage door's wall 20 ft · Wall height 8 ft · Roof pitch (rise per 12) 6 · Slope factor 1.12 · Eave overhang, each side 11.8 in · Gable overhang, each end 11.8 in · Garage door opening width 16 ft · Garage door opening height 7 ft · Side doors 1 · Windows 1 · Window opening width, each 3 ft · Window opening height, each 3 ft · Dig over the footprint 9.75 in — they come to: Topsoil and ground dug out over the footprint, 15 yd³; Slab concrete, with its sub-base and edge forms, 5.19–5.68 yd³; Wall studs (studwork), 68 studs; Wall sheathing, OSB or plywood, 17–19 sheets (4x8 ft); House wrap (breather membrane) on the walls, 1 roll; Flashing tape round the openings, 45.2–49.5 ft; Siding on the walls, 5–5.47 squares; Roof trusses, 11 trusses; Roof deck, OSB or plywood, 18–20 sheets (4x8 ft); Roof underlayment, 1 roll; Asphalt shingles, 5.66–6.2 squares; Ridge cap, 1 bundle; Fascia boards along both eaves, 4–5 x 12 ft boards; Soffit under both eaves, 4–5 x 12 sq ft panels; Gutters and downspouts along both eaves, 5 x 10 ft sections; Skip (dumpster) or muck away for the spoil, 15 yd³; Skip or bags for the offcuts and packaging, 6.08 yd³.

**Which line on a detached garage quote varies the most?**

The Fascia boards along both eaves: 4–5 x 3.6 m boards for a job measured Length, along the ridge 6 m · Width, the garage door's wall 6 m · Wall height 2.4 m · Roof pitch (rise per 12) 6 · Slope factor 1.12 · Eave overhang, each side 300 mm · Gable overhang, each end 300 mm · Garage door opening width 4.8 m · Garage door opening height 2.1 m · Side doors 1 · Windows 1 · Window opening width, each 0.9 m · Window opening height, each 0.9 m · Dig over the footprint 250 mm, depending on the cut and scarf allowance allowed, from 5% to 15%.

**What does a detached garage quote often leave out?**

The reading names every line of the job that nothing on the quote reads as — any of the 17 lines the takeoff measures. The takeoff also lists 9 things it does not measure, shown under the reading, and each is worth asking about: a scope missing from a quote tends to become a cost after work has started.

**Can I paste the quote exactly as it came?**

Yes — from an email, a PDF or a spreadsheet, one item to a line. Amounts of money are taken out before anything is read, headings and totals are skipped, and each line is shown with what it was read as, so a misreading is one correction. Quantities in the other unit system are converted and the conversion is shown; a count of boxes is never compared with a count of tiles.

**Does this check the price as well?**

No. It reads quantities, never prices, and this site publishes none: an installed price moves with the market, the season, the access and the specification, so a figure for what the work ought to cost would give you confidence in a number nobody can defend. A quantity against your own measurements is checkable, and every figure here links to the calculator that produced it.

---