# Embodied Carbon in Concrete Calculator

> Cradle-to-gate (A1-A3) carbon for a concrete element, and what replacing cement with GGBS or fly ash actually saves.

Page: https://craftquantities.com/calculators/sustainability-compliance/embodied-carbon-concrete-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.1.1, sources checked 2026-09-05, 5 published test vectors.

Embodied carbon (A1-A3): 19,000 kgCO₂e for Concrete volume 65.5 yd³, the page's opening figures; on the metric page, 50 m³ gives 19,000 kgCO₂e. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Concrete volume | `volume` | 50 m³ | 65.5 yd³ | l, gal, m3, ft3, yd3; range 0.1–200000000 L |
| Mix and cement replacement | `mix` | C30/37, 100% Portland cement (~300 kgCO₂e/m³) | C30/37, 100% Portland cement (~300 kgCO₂e/m³) | `cemI`, `flyash30`, `ggbs50`, `ggbs70`, `highStrength`, `custom` |
| Custom factor (kgCO₂e/m³) | `customFactor` | 0 | 0 | range 0–2000 |
| Reinforcement | `rebarKgPerM3` | 100 kg/m³ | 168.555 lb/yd³ | kgm3, pcf, lbyd3; range 0–500 kg/m³ |
| Reinforcement factor (kgCO₂e/kg) | `rebarFactor` | 0.76 | 0.76 | range 0–5 |

- **Concrete volume**: Placed volume of the element.
- **Mix and cement replacement**: Replacement level is the biggest lever available.
- **Custom factor (kgCO₂e/m³)**: Used only when the mix above is set to Custom.
- **Reinforcement**: Steel content by volume of concrete.
- **Reinforcement factor (kgCO₂e/kg)**: Depends heavily on how the steel was made.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Embodied carbon (A1-A3)** | 19,000 kgCO₂e |
| Tonnes CO₂e | 18.8 tCO₂e |
| Concrete | 15,000 kgCO₂e |
| Reinforcement | 3,800 kgCO₂e |
| Reinforcement share | 20.21 % |
| Per unit volume of element | 376 kgCO₂e/m³ |
| Saving against 100% Portland | 0 kgCO₂e |
| Reinforcement mass | 5,000 kg |

### US customary

| Result | Value |
|---|---|
| **Embodied carbon (A1-A3)** | 19,000 kgCO₂e |
| Tonnes CO₂e | 18.83 tCO₂e |
| Concrete | 15,023.5 kgCO₂e |
| Reinforcement | 3,805.95 kgCO₂e |
| Reinforcement share | 20.21 % |
| Per unit volume of element | 287.47 kgCO₂e/yd³ |
| Saving against 100% Portland | 0 kgCO₂e |
| Reinforcement mass | 11,040.38 lb |

- Confidence: low.

## How it is worked out

Emission factors here are typical published ranges for orientation, not product data. A reportable assessment uses the supplier's own Environmental Product Declaration — the spread between two suppliers of the same nominal product routinely exceeds 30%.

The working the page shows, in order: Tonnes CO₂e; Concrete; Reinforcement; Reinforcement share; Per unit volume of element; Saving against 100% Portland; Reinforcement mass; then embodied carbon (A1-A3).

The method, derived in full:

- [Carbon Accounting: Boundaries, Factors and What A1–A3 Leaves Out](https://craftquantities.com/methodology/carbon-accounting-and-boundaries/): Why two embodied carbon figures for the same product can differ by a factor and both be right, why a low-cement mix is partly an accounting decision, and why multiplying today's grid factor by thirty years overstates the answer.

What this calculation does not cover:

- Cradle-to-gate only (A1-A3). Transport to site (A4), site operations (A5), the in-use stage and end of life are excluded, and A4 alone can be significant for a remote site.
- Excludes formwork, which is reused a variable number of times and is genuinely difficult to allocate.
- Does not credit carbonation over the structure's life, which reabsorbs a modest fraction of the process emissions and is treated inconsistently between assessment methods.

A professional must decide:

- Structure: sizes, thicknesses, spans, reinforcement and bearing are a structural engineer's or the building official's decision. This is a quantity, not a design.

## Sources

As the calculator cites them (sources checked 2026-09-05):

- EN 15804 modules A1-A3 define cradle-to-gate: raw material supply, transport to the plant, and manufacturing
- Typical GWP ranges for structural concrete are drawn from published EPDs and the ICE database; product-specific EPDs vary widely around them
- Cement clinker is the dominant contributor — roughly 90% of a plain concrete's A1-A3 figure comes from the Portland cement fraction

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Why is cement replacement such a large lever?**

Because almost all of concrete's carbon is in the clinker, not the aggregate or the water. Making Portland cement calcines limestone, and that chemical reaction releases carbon dioxide regardless of how the kiln is fired — it is not a fuel problem that cleaner energy solves. Substituting GGBS or fly ash for part of the cement removes that fraction of the clinker and its emissions with it.

**What is the catch with high GGBS levels?**

Early strength. A 70% GGBS mix gains strength considerably more slowly than plain Portland, especially in cold weather, which pushes out striking times and can extend the programme. On a fast-cycle frame that delay has its own cost, and sometimes its own carbon. It is a genuine engineering trade, not a free saving.

**Should I trust the numbers in the dropdown?**

Only for orientation. They are typical published ranges, and the spread between two suppliers of nominally identical concrete regularly exceeds 30% — larger than several of the savings people chase. For anything that will be reported, use the supplier's EPD for the specific mix from the specific plant, and enter it as the custom factor.

**Why does reinforcement get its own line?**

Because it is routinely a fifth or more of a reinforced element's total, and concrete-only figures quietly omit it. It also carries its own large choice: recycled electric-arc-furnace rebar sits several times below primary blast-furnace steel. The breakdown shows the reinforcement share so you can see whether your attention belongs on the mix or on the steel.

## Related calculators

- [Structural Material Carbon Comparison Calculator](https://craftquantities.com/calculators/sustainability-compliance/embodied-carbon-comparison-calculator/)
- [Concrete Calculator](https://craftquantities.com/calculators/materials-quantities/concrete-calculator/)
- [Operational Carbon from Electricity Calculator](https://craftquantities.com/calculators/sustainability-compliance/operational-carbon-electricity-calculator/)
- [C&D Debris Recycling Diversion Rate Calculator](https://craftquantities.com/calculators/sustainability-compliance/cd-debris-diversion-rate-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/embodied-carbon-concrete-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/embodied-carbon-concrete-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `embodied-carbon-concrete-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/embodied-carbon-concrete-calculator.json

---
Source: https://craftquantities.com/calculators/sustainability-compliance/embodied-carbon-concrete-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.