Version 1.0.1, sources checked 2026-09-06, 2 published test vectors.

Maximum insulation thickness needed: 11.4 in for Run Length to Low Point/Drain 39 ft, the page's opening figures; on the metric page, 12 m gives 290 mm. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Run Length to Low Point/Drain | `runLength` | 12 m | 39 ft | mm, cm, m, in, ft, yd; range 0.01–60 m |
| Target Slope Ratio (e.g. 0.02 = 2%, commonly 1/4 in per ft) | `slopeRatio` | 0.02 | 0.02 | range 0.005–0.05 |
| Minimum (Starter) Insulation Thickness at the Drain | `minThickness` | 50 mm | 2 in | mm, cm, m, in, ft, yd; range 0.01–0.15 m |
| Width of One Tapered Board | `boardWidth` | 1.2 m | 4 ft | mm, cm, m, in, ft, yd; range 0.3–3 m |
| Thickest Tapered Board Made | `maxBoardThickness` | 100 mm | 4 in | mm, cm, m, in, ft, yd; range 0.025–0.2 m |

- **Run Length to Low Point/Drain**: The horizontal distance from the roof's high point to the drain or low point.
- **Target Slope Ratio (e.g. 0.02 = 2%, commonly 1/4 in per ft)**: The target drainage slope, expressed as a ratio (rise ÷ run).
- **Minimum (Starter) Insulation Thickness at the Drain**: The thinnest board in the system, laid AT the drain or scupper — the taper builds up from here.
- **Width of One Tapered Board**: The board's width measured along the run, which is the direction the taper climbs.
- **Thickest Tapered Board Made**: The thickest board in the tapered range, where the sequence has to restart.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Maximum insulation thickness needed** | 290 mm |
| Thickness rise across the run | 240 mm |
| Board courses from the drain to the high point | 10 |
| Rise across one board | 24 mm |
| Width of the last course | 1,200 mm |
| Courses before the taper restarts on fill | 2 |
| Flat fill under the high end | 190 mm |

### US customary

| Result | Value |
|---|---|
| **Maximum insulation thickness needed** | 11.4 in |
| Thickness rise across the run | 9.36 in |
| Board courses from the drain to the high point | 10 |
| Rise across one board | 0.96 in |
| Width of the last course | 36 in |
| Courses before the taper restarts on fill | 2 |
| Flat fill under the high end | 7.36 in |

## How it is worked out

The working the page shows, in order: Thickness rise across the run; Board courses from the drain to the high point; Rise across one board; Width of the last course; Courses before the taper restarts on fill; Flat fill under the high end; then maximum insulation thickness needed.

The method, derived in full:

- [Head Loss, Falls and Surge: Resistance in Pipes, Ducts and Drains](https://craftquantities.com/methodology/head-loss-falls-and-surge/): Why one pipe size up cuts the friction to a third, why a compressed flex duct can cost four times its rated loss, why a drain can be too steep, and why a fast-closing valve produces a pressure the pump never could.

What this calculation does not cover:

- Gives thickness, not R-value, and the thin end is where the energy code bites. The starter board at the drain is the lowest R anywhere in the assembly, so check the required minimum against that thinnest point — and against the assembly average if your code path allows one — before ordering, because raising the starter thickness raises every board above it and the whole build-up with it.
- Solves one straight fall and leaves the water between the drains. Areas behind curbs, between adjacent drains and along the high line need crickets and saddles, and because a cricket falls diagonally its own slope has to be steeper than the field — commonly double it. A roof tapered only in the direction calculated here ponds in every one of those corners.
- The last course is ripped to whatever the run has left, and a ripped tapered board carries only its own share of the rise — so the board against the high point is not the thickest board in the range, even though it sits at the thickest place. Where the rip lands is a decision the page does not make: put it at the high point and the cut edge is buried under the flashing, put it at the drain and it is under the sump, and the two are not the same job.
- The board rows assume one tapered range at exactly the slope you asked for, laid in full-width courses from the drain outwards. Real schedules are lettered sets with their own fixed slopes, and the nearest one to your target is what gets delivered — so a 1 in (25 mm) 50 target is normally built with 1/4-in-per-foot board, which is 1 in (25 mm) 48, and the finished fall is the board's, not yours. Take the courses and the fill as the shape of the system rather than as an order.
- Nothing here checks that the total fits what surrounds it, and on a deep build-up that is the constraint that bites first: flashing height at the parapet, door sills, curb heights and the depth of the drain bowl itself. A roof that needs more fill than the upstand allows is re-drained or re-divided rather than re-tapered, and that decision sits upstream of every figure on this page.

## Sources

As the calculator cites them (sources checked 2026-09-06):

- Thickness rise = run length × target slope ratio; maximum insulation thickness = minimum thickness + rise, the standard method for sizing a tapered insulation system that creates positive roof drainage toward a low point
- Rise across one tapered board = board width x slope ratio, which is why a four-foot board at a quarter inch per foot rises exactly one inch and at an eighth per foot exactly half
- Courses = run length / board width, rounded up; the tapered boards carry (thickest board - starter thickness) / rise-per-board courses before the sequence restarts on flat fill, and the fill under the high end is the total thickness less the thickest board made

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**How is the thickness rise calculated?**

Thickness rise = run length × target slope ratio. This is added to the minimum (starter) thickness held at the drain to get the maximum thickness, which occurs at the far end of the run — the high point.

**What's a typical target slope ratio for tapered roof insulation?**

A ratio of 0.02 (2%) is a common target, which is roughly equivalent to a slope of 1/4 in of rise per foot of run.

**Where does the minimum thickness actually go — the drain or the high point?**

The drain. This is the question this page used to get backwards, so it is worth stating plainly: the starter board is the thinnest board in the system and it is laid at the low point, at the drain or scupper, with each successive board thicker as the run goes back toward the ridge, crown or perimeter. The maximum thickness is therefore at the HIGH point, and it is the minimum plus the calculated rise. Building it the other way round — thickening toward the drain — produces a roof that ponds at exactly the place it is supposed to shed.

## Related calculators

- [Floor Drain Slope Screed Volume Calculator](https://craftquantities.com/calculators/materials-quantities/floor-drain-screed-calculator/)
- [Ground-to-Roof Snow Load Calculator](https://craftquantities.com/calculators/materials-quantities/roof-snow-load-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/tapered-insulation-slope-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/tapered-insulation-slope-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `tapered-insulation-slope-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/tapered-insulation-slope-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/tapered-insulation-slope-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.