Version 1.0.0, sources checked 2026-09-15, 3 published test vectors.

Loose volume in the pile: 147 yd³ for Distance around the toe of the pile 98 ft and Width of any flat top 0 ft, the page's opening figures; on the metric page, 30 m and 0 m give 114 m³. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Distance around the toe of the pile | `baseCircumference` | 30 m | 98 ft | mm, cm, m, in, ft, yd; range 1–400 m |
| Material | `material` | Crushed stone or angular aggregate | Crushed stone or angular aggregate | `dry-sand`, `damp-sand`, `gravel`, `crushed-stone`, `topsoil`, `wood-chip` |
| Width of any flat top | `flatToppedWidth` | 0 m | 0 ft | mm, cm, m, in, ft, yd; range 0–100 m |

- **Distance around the toe of the pile**: Walk a tape around the bottom edge of the pile.
- **Material**: What the pile is made of — it sets how steeply it stands.
- **Width of any flat top**: Zero for a freely tipped cone; the diameter of the flat if it has been levelled.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Loose volume in the pile** | 114 m³ |
| Lower end of the range | 89.06 m³ |
| Upper end of the range | 113.99 m³ |
| Width of the range | 27.99 % |
| Base diameter, from the circumference | 9.55 m |
| Derived height, shallowest angle | 3.73 m |
| Derived height, steepest angle | 4.77 m |

### US customary

| Result | Value |
|---|---|
| **Loose volume in the pile** | 147 yd³ |
| Lower end of the range | 114.98 yd³ |
| Upper end of the range | 147.16 yd³ |
| Width of the range | 27.99 % |
| Base diameter, from the circumference | 31.19 ft |
| Derived height, shallowest angle | 12.19 ft |
| Derived height, steepest angle | 15.6 ft |

- Confidence: medium.

## How it is worked out

Between 89.1 and 114.0 m³, a band 28% wide. Angular faces interlock, which is why crushed stone stands noticeably steeper than gravel. The pile stands 3.73 m to 4.77 m tall at those angles, which is the height you could not have measured anyway. This is LOOSE volume: more than the same material occupied in the ground, and more than it will occupy once compacted.

The working the page shows, in order: Lower end of the range; Upper end of the range; Width of the range; Base diameter, from the circumference; Derived height, shallowest angle; Derived height, steepest angle; then loose volume in the pile.

The method, derived in full:

- [Volume from Geometry, and the Order That Follows](https://craftquantities.com/methodology/volume-from-geometry/): Why the depth carries almost all the risk in a volume, why an excavation holds far more than its plan area suggests, and why a bag's yield is not its weight divided by a density.

What this calculation does not cover:

- The result is LOOSE volume — the material as it sits, bulked. It is not the bank volume it occupied in the ground and not the compacted volume it will occupy once placed, and for most materials those three differ substantially. Which one you want depends on whether you are buying it, hauling it or laying it.
- The range is the answer, not a hedge. An angle of repose is a property of the material AND its moisture AND how the pile was built, so it is a band; the volume inherits that band. Reporting a single figure would be inventing a precision the geometry does not have.
- A cone assumes the pile was tipped freely onto level ground and left alone. A pile pushed up by a loader, built against a wall, or sitting in a hollow is not a cone and this over- or under-states it depending on which.
- The ground under the pile is assumed flat. A pile in a dished bay holds more than its visible shape suggests, and one on a crown holds less; neither is visible from outside.
- Nothing here converts volume to mass or to a lorry count. Bulk density varies with the same moisture that moved the angle of repose, so a tonnage taken from this figure carries both uncertainties.
- Segregation is invisible to the arithmetic. Tipped material sorts itself as it runs down the cone — the coarsest rolls to the toe — so a sample taken from the bottom of a pile is not representative of what is in it.

## Sources

As the calculator cites them (sources checked 2026-09-15):

- A freely tipped pile forms a cone whose side stands at the material's ANGLE OF REPOSE, so its height is the base radius times the tangent of that angle and its volume is πr²h/3. Measuring the circumference of the toe and deriving the rest is the standard field method, because the apex is the one point on a pile nobody can reach
- Angles of repose are quoted as bands rather than values: dry sand roughly 30 to 35 degrees, rounded gravel 30 to 38, angular crushed stone 38 to 45, wood chip 40 to 48. Moisture moves a material within its band, and how the pile was placed moves it again
- The result is LOOSE volume — the material as it sits in the pile, bulked. It is neither the bank volume it occupied in the ground nor the compacted volume it will occupy in place, and the three differ by a substantial margin for most materials

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Why measure around the pile instead of across it?**

Because walking a tape around the toe is a measurement you can actually take, and pacing a diameter is not. To measure a diameter you have to know where the centre is, and the centre of a stockpile is buried under the whole pile — so in practice people sight across it and take a line that misses. Every line that misses the centre is a CHORD rather than a diameter, and a chord is always shorter. That matters more than it sounds, because volume goes with the square of the radius: a diameter read ten per cent short gives a volume nearly twenty per cent short. A circumference has no such failure mode. You walk the visible edge, the tape follows the ground, and the radius comes out of it by division. It is also easier to do alone and easier to repeat.

**Why does the material change the answer so much?**

Because the height is derived from the material rather than measured, and different materials stand at different angles. Angular crushed stone interlocks — its broken faces catch on each other — so it holds a face around 38 to 45 degrees. Rounded gravel cannot do that; the grains roll, and it settles nearer 30 to 38. Over the same footprint that difference is large: a steeper cone is a taller cone, and volume goes up with height directly. The same effect explains why damp sand stands steeper than dry, which surprises people — a little surface moisture binds grains together and lets the pile hold a face it otherwise could not. Add more water and that reverses sharply, because a saturated material loses the binding and slumps. The angle is genuinely a property of the material AND its condition, which is why the page asks what the pile is made of and reports a band rather than a number.

**Is this the volume I should order, or the volume I dug out?**

Neither, exactly, and the distinction costs people money regularly. What this gives is LOOSE volume — the material as it sits in the pile, with air between the particles from being tipped. The same material occupied less space in the ground, which is bank volume, and it will occupy less again once it is laid and compacted, which is compacted volume. For most soils and aggregates loose volume is meaningfully larger than bank, and compacted is smaller than bank. So if you are hauling a pile away, this is roughly the number of lorry loads. If you are asking how big the hole was that it came out of, it is not. And if you are asking how much of the pile you need to fill a given space to a specified compaction, it is not that either — that calculation starts from the compacted volume required and works backwards through the same factors.

**What if the pile has been driven over?**

Then it is a truncated cone rather than a cone, and the page handles that if you give it the width of the flat — but the answer gets less reliable rather than more. A freely tipped pile is a predictable shape because gravity and the material's own angle made it. A pile that has had a loader driven over the top has been shaped by a machine, and how much came off the apex is a guess rather than a measurement. It has usually also been compacted where the tracks ran, so part of the pile is no longer at loose density. The page drops its confidence when you enter a flat for exactly that reason. The honest position is that a levelled pile can be estimated but not measured, and if the number matters — for payment, for a dispute, for reconciliation — the answer is a survey rather than a tape and a formula.

## Related calculators

- [Cone Frustum Volume Calculator — Hoppers and Tapered Piers](https://craftquantities.com/calculators/materials-quantities/cone-frustum-volume-calculator/)
- [Material Volume to Weight Calculator](https://craftquantities.com/calculators/measurements-conversions/material-volume-to-weight-calculator/)
- [Boulder Weight Range Calculator](https://craftquantities.com/calculators/materials-quantities/boulder-weight-calculator/)
- [Cubic Yards Calculator](https://craftquantities.com/calculators/measurements-conversions/cubic-yards-from-dimensions-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/stockpile-volume-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/stockpile-volume-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `stockpile-volume-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/stockpile-volume-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/stockpile-volume-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.