# Temporary Site Trailer Electrical Load Calculator

> Calculate the total connected electrical load and required amperage for a construction site office trailer's temporary power.

Page: https://craftquantities.com/calculators/materials-quantities/site-trailer-electrical-load-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.1, sources checked 2026-09-06, 2 published test vectors.

Required service amperage: 29.2 A for Lighting Load 1500, HVAC Load 3500 and Receptacle/Equipment Load 2000, the page's opening figures. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Lighting Load (VA) | `lightingLoad` | 1500 | 1500 | range 0–10000 |
| HVAC Load (VA) | `hvacLoad` | 3500 | 3500 | range 0–20000 |
| Receptacle/Equipment Load (VA) | `receptacleLoad` | 2000 | 2000 | range 0–20000 |
| Voltage (V) | `voltage` | 240 | 240 | range 120–240 |

- **Lighting Load (VA)**: The total connected lighting load in the site trailer, in volt-amps.
- **HVAC Load (VA)**: The total connected heating/cooling equipment load, in volt-amps.
- **Receptacle/Equipment Load (VA)**: The total connected load from receptacles, computers, printers, and other plugged-in equipment, in volt-amps.
- **Voltage (V)**: The service voltage supplying the trailer.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Required service amperage** | 29.2 A |
| Total connected load | 7,000 VA |

### US customary

| Result | Value |
|---|---|
| **Required service amperage** | 29.2 A |
| Total connected load | 7,000 VA |

- Confidence: medium.

## How it is worked out

This is a simple connected-load sum with no demand factor applied — NEC Article 590 (Temporary Installations) governs the actual code requirements for temporary construction power, including conductor sizing, GFCI protection, and disconnect requirements, which this calculator does not address. Round up to the next standard breaker/service size and consult a licensed electrician for the actual installation.

The working the page shows, in order: Total connected load; then required service amperage.

The method, derived in full:

- [Electrical Demand, Three-Phase Power and Panel Capacity](https://craftquantities.com/methodology/electrical-demand-and-panel-capacity/): Why the sum of every nameplate is a load no building ever draws, why a motor's conductors are sized from a table rather than from its nameplate, and why a dark room needs far more light than a pale one for the same lux.

What this calculation does not cover:

- Divides the whole load by the voltage, which only gives the per-leg current if the load splits evenly across both legs of a 120/240 V supply. It never does — the lighting, receptacles and office gear are all 120 V and land wherever the panel schedule puts them. A trailer that computes 29 A total can be pulling 40 A on one leg and 18 A on the other, and the leg is what trips.
- Connected load is not breaker size. A continuous load is sized at 125 % for the overcurrent device, and the trailer's air conditioner pulls several times its nameplate for the first second of every start. This figure is what the equipment eats while running, not what the breaker has to survive when the compressor kicks in on a hot afternoon.
- If a generator is feeding the trailer rather than a temporary pole, amperage is the wrong question. A set is rated in kW at a stated power factor, and it is the motor starting kVA of the air conditioner that sizes it — a genset matched to the running load sags and stalls on AC startup, and the office reboots with it.

A professional must decide:

- Structure: sizes, thicknesses, spans, reinforcement and bearing are a structural engineer's or the building official's decision. This is a quantity, not a design.
- Electrics: circuit design, protection, cable sizing and the work itself are for a qualified or licensed electrician, under the rules where you build.

## Sources

As the calculator cites them (sources checked 2026-09-06):

- Total connected load (VA) = Lighting + HVAC + Receptacle Loads; Required amperage = Total VA ÷ Voltage — a straightforward connected-load sum with no demand factor applied (unlike a permanent dwelling service calculation), appropriate for a temporary construction trailer under NEC Article 590 (Temporary Installations), which governs the actual code requirements for temporary wiring.

The site's pages for the documents these name:

- [National Electrical Code (NFPA 70)](https://craftquantities.com/standards/nfpa/nec/)

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Does this calculation apply a demand factor like a permanent dwelling load calculation?**

No — it is a straightforward connected-load sum (lighting + HVAC + receptacle loads) with no demand factor applied, which is the appropriate approach for a temporary construction trailer under NEC Article 590 (Temporary Installations).

**What amperage/breaker size should I actually install?**

Round the calculated amperage up to the next standard breaker or service size, and always consult a licensed electrician. This calculator gives only the raw connected-load amperage and does not address conductor sizing, GFCI protection, or disconnect requirements, all of which NEC Article 590 governs for temporary installations.

**Where do I get the VA values for lighting, HVAC, and receptacle loads?**

Use the nameplate volt-amp (or watt) ratings on the trailer's lighting fixtures, air conditioner/heater, and any plugged-in equipment — sum each category separately before entering it here.

## Related calculators

- [Home Electrical Service Panel Amperage Sizing Calculator](https://craftquantities.com/calculators/materials-quantities/service-panel-sizing-calculator/)
- [Temporary Construction Fence Panel Count Calculator](https://craftquantities.com/calculators/materials-quantities/temp-fence-panel-count-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/site-trailer-electrical-load-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/site-trailer-electrical-load-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `site-trailer-electrical-load-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/site-trailer-electrical-load-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/site-trailer-electrical-load-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.