# Shaftwall Stud Framework Calculator

> Calculate the number of shaftwall (CH/CT) studs needed for an elevator or mechanical shaft wall run.

Page: https://craftquantities.com/calculators/materials-quantities/shaftwall-stud-framework-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.1, sources checked 2026-09-05, 2 published test vectors.

Shaftwall studs needed: 18 studs for Wall Length 33 ft and Stud Spacing 24 in, the page's opening figures; on the metric page, 10 m and 609.6 mm give 18 studs. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Wall Length | `wallLength` | 10 m | 33 ft | mm, cm, m, in, ft, yd; range 0.01–60 m |
| Stud Spacing (o.c.) | `studSpacing` | 609.6 mm | 24 in | mm, cm, m, in, ft, yd; range 0.4064–0.6096 m |

- **Wall Length**: The total length of the shaftwall run.
- **Stud Spacing (o.c.)**: The on-center spacing between shaftwall (CH/CT) studs.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Shaftwall studs needed** | 18 studs |
| Whole bays up the run | 16 |
| Closing space at the last stud | 246.4 mm |

### US customary

| Result | Value |
|---|---|
| **Shaftwall studs needed** | 18 studs |
| Whole bays up the run | 16 |
| Closing space at the last stud | 12 in |

## How it is worked out

The working the page shows, in order: Whole bays up the run; Closing space at the last stud; then shaftwall studs needed.

The method, derived in full:

- [Spacing, Pitch and the Count That Follows](https://craftquantities.com/methodology/spacing-pitch-and-count/): Why a run divided by a spacing gives the number of gaps and not the number of things, why the division rounds up rather than to nearest, and what the leftover bay at the end does to both.

What this calculation does not cover:

- The "+ 1" is added once per calculation, so the figure describes a single straight run with two framed ends. Split a lift shaft into four 2.5 m faces and each face returns 6 studs, 24 in all, where the same 10 m entered as one length returns 18 — corners are neither given their own studs nor treated as shared between faces.
- Spacing is only ever used as a divisor. Whatever centre is entered — and the field will not take anything tighter than 16 in or wider than 24 in — is divided into the length and never tested against anything else, because shaft height, the pressure a moving car or a stair pressurisation fan puts on the wall, and the depth and gauge of the C-H section are not asked for. The number therefore does not tighten as the shaft gets taller; the spacing has to arrive already decided by the assembly's design listing.
- Wall height is nowhere in the inputs, so what comes back is a piece count rather than a length of steel to order, with every stud assumed to run from floor track to head track in one piece. Nothing adds the splice, the second length or the head-of-wall detail a storey deeper than the stock stud needs, and no spare is carried for a mis-cut, a damaged web or a section bent while it is being slid into place.
- Openings are counted as though they were not there. The run studs that a lift door or a duct penetration displaces are still included in the total, and the jamb, head and sill pieces that frame the opening are not, so the result is a straight-run layout and not a framing schedule.
- The closing space above is the whole remainder, pushed into the final bay rather than eased across the run, so it is narrower than the module and it is exactly where a friction-fit liner panel and the finish board both have to be ripped. The stud count does not change with it. What the page still cannot say is which end of the run takes that bay, and against a lift door or a duct penetration that is not a free choice.

A professional must decide:

- Structure: sizes, thicknesses, spans, reinforcement and bearing are a structural engineer's or the building official's decision. This is a quantity, not a design.

## Sources

As the calculator cites them (sources checked 2026-09-05):

- Shaftwall stud count = ceil(wall length ÷ spacing) + 1, the same layout method as standard steel/wood stud framing, typically at 24 in o.c. for shaftwall assemblies

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**What decides the stud spacing here, if the wall carries no floor load?**

Air pressure, over a very tall span. A shaftwall carries no building load, but a lift shaft is a piston: a car moving at speed pushes and pulls air, and the wall has to resist that pressure without deflecting enough to open a joint in the fire-rated liner behind it. So the governing case is a lateral pressure applied over an unbraced height that can be several storeys, and the spacing tightens as the shaft gets taller rather than as the wall gets more loaded. Stair pressurisation systems apply the same kind of load deliberately. This is why a shaftwall stud is a deep C-H section at close centres while a partition of the same height would be nothing like it.

**Why does this use the same layout method as standard stud framing?**

Shaftwall (CH/CT) studs are laid out along the wall run the same way as standard steel or wood studs — full spacing intervals along the length, plus one extra stud so both ends of the run are framed.

**What stud spacing should I use?**

24 in o.c. is typical for shaftwall assemblies, but the required spacing depends on the specific tested shaftwall system and its design listing — always confirm against the manufacturer's assembly documentation.

**Does this include studs at door or duct openings?**

No — this calculates the base stud count for a continuous straight run at even spacing. Additional jamb studs at openings should be added separately from your layout.

## Related calculators

- [Cold-Formed Steel Stud Spacing & Count Calculator](https://craftquantities.com/calculators/materials-quantities/cfs-stud-spacing-calculator/)
- [Fire-Rated Shaftwall Liner Panel Count Calculator](https://craftquantities.com/calculators/materials-quantities/shaftwall-liner-panel-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/shaftwall-stud-framework-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/shaftwall-stud-framework-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `shaftwall-stud-framework-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/shaftwall-stud-framework-calculator.json

---