# Scaffold Tie Count Calculator (OSHA 1926.451)

> Count the ties, guys or braces OSHA requires on a supported scaffold taller than four times its base width, by tie level and position along the face.

Page: https://craftquantities.com/calculators/materials-quantities/scaffold-tie-count-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.0, sources checked 2026-09-21, 7 published test vectors.

Ties, guys or braces under OSHA's default pattern: 8 ties for Scaffold Height 49 ft, Narrowest Base Width, Including Outriggers 5 ft and Scaffold Length Along the Face 79 ft, the page's opening figures; on the metric page, 15 m, 1.5 m and 24 m give 8 ties. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Scaffold Height | `scaffoldHeight` | 15 m | 49 ft | mm, cm, m, in, ft, yd; range 1–100 m |
| Narrowest Base Width, Including Outriggers | `baseWidth` | 1.5 m | 5 ft | mm, cm, m, in, ft, yd; range 0.3–10 m |
| Scaffold Length Along the Face | `scaffoldLength` | 24 m | 79 ft | mm, cm, m, in, ft, yd; range 1–500 m |
| Height Between Horizontal Members | `liftHeight` | 2 m | 6.5 ft | mm, cm, m, in, ft, yd; range 1–3 m |

- **Scaffold Height**: From where the base plates bear to the top of the scaffold.
- **Narrowest Base Width, Including Outriggers**: The smallest dimension of the scaffold's base, with outrigger supports counted where they are fitted.
- **Scaffold Length Along the Face**: The run of scaffold along the building, end to end.
- **Height Between Horizontal Members**: The vertical spacing of the ledgers or frame bearers that ties are fixed at.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Ties, guys or braces under OSHA's default pattern** | 8 ties |
| Height at which the rule starts (4 × the base width) | 6 m |
| Height to base width ratio | 10 :1 |
| First tie level, at the horizontal member closest to that height | 6 m |
| Tie levels up the face | 2 levels |
| Vertical interval between tie levels | 6 m |
| Largest vertical interval the rule allows at this width | 7.92 m |
| Highest tie level | 12 m |
| Scaffold standing above the highest tie | 3 m |
| Tie positions along the face | 4 positions |

### US customary

| Result | Value |
|---|---|
| **Ties, guys or braces under OSHA's default pattern** | 8 ties |
| Height at which the rule starts (4 × the base width) | 20 ft |
| Height to base width ratio | 9.8 :1 |
| First tie level, at the horizontal member closest to that height | 19.5 ft |
| Tie levels up the face | 2 levels |
| Vertical interval between tie levels | 26 ft |
| Largest vertical interval the rule allows at this width | 26 ft |
| Highest tie level | 45.5 ft |
| Scaffold standing above the highest tie | 3.5 ft |
| Tie positions along the face | 4 positions |

## How it is worked out

The scaffold stands 10.0 times as tall as its base is wide, past the 4:1 at which OSHA's rule requires a supported scaffold to be guyed, tied or braced. The count is 2 levels of ties up the face at 4 positions along it: the first level at the horizontal member closest to four base widths, the rest at the widest interval the rule allows for this width until the highest is within four base widths of the top, and along the face a position at each end and at no more than 30 feet (9.1 m) apart. It is the rule's default pattern and a minimum; the manufacturer's recommendations may replace it.

The working the page shows, in order: Height at which the rule starts (4 × the base width); Height to base width ratio; First tie level, at the horizontal member closest to that height; Tie levels up the face; Vertical interval between tie levels; Largest vertical interval the rule allows at this width; Highest tie level; Scaffold standing above the highest tie; Tie positions along the face; then ties, guys or braces under OSHA's default pattern.

The method, derived in full:

- [Scaffolds: Ties, Duty and Plank Spans](https://craftquantities.com/methodology/scaffold-ties-duty-and-planks/): Why a scaffold must be tied once it stands four times as tall as it is wide, why a duty rating is an average a pallet of blocks ignores, and why half an inch more plank thickness more than doubles its stiffness.

What this calculation does not cover:

- It applies the default pattern of 29 CFR 1926.451(c)(1)(ii). The same paragraph lets ties follow the scaffold manufacturer's recommendations instead, and a scaffold designed by a qualified person follows its design.
- Ties are counted, not designed. What force each must carry, and whether its anchor holds in the wall behind it, belong to the scaffold's design — a tie into soft brick or failed pointing restrains nothing.
- Sheeted, netted or encapsulated scaffolds, and those carrying a hoist, a loading bay or signage, take wind and loads the default pattern does not allow for, and are tied to a design.
- In the UK the tie pattern of a tube-and-fitting scaffold comes from the NASC's TG20 guidance or from a design. This page follows OSHA's rule only and reproduces neither.

A professional must decide:

- It applies the default pattern of 29 CFR 1926.451(c)(1)(ii). The same paragraph lets ties follow the scaffold manufacturer's recommendations instead, and a scaffold designed by a qualified person follows its design.

## Sources

As the calculator cites them (sources checked 2026-09-21):

- 29 CFR 1926.451(c)(1): supported scaffolds with a height to base width (including outrigger supports, if used) ratio of more than four to one (4:1) shall be restrained from tipping by guying, tying, bracing, or equivalent means
- 29 CFR 1926.451(c)(1)(ii): guys, ties and braces go according to the scaffold manufacturer's recommendations or at the closest horizontal member to the 4:1 height, repeated vertically at horizontal members every 20 feet (6.1 m) or less for scaffolds 3 feet (0.91 m) wide or less and every 26 feet (7.9 m) or less for wider ones; the top one no further than the 4:1 height from the top; at each end and at horizontal intervals not exceeding 30 feet (9.1 m), measured from one end

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**When does a scaffold need ties at all?**

Under OSHA's rule, once it stands more than four times as tall as its narrowest base width, with any outrigger supports counted in the width. A frame 5 feet (1.52 m) wide reaches that at 20 feet (6.1 m). Below that ratio the paragraph asks for no restraint, though the manufacturer's instructions may, and a scaffold that is sheeted, netted or carries a hoist is restrained to a design whatever its proportions.

**Why does a narrow scaffold take its ties closer together?**

Because it tips more easily. The rule sets the vertical interval at 20 feet (6.1 m) or less for scaffolds 3 feet (0.91 m) wide or less and 26 feet (7.9 m) or less for wider ones, and ties land on horizontal members, so the real interval is the largest whole number of lifts that fits inside that figure. With lifts of 2 metres (about 6 ft 7 in), a narrow scaffold ties every third lift and a wider one also every third, but with lifts of 6 feet (1.83 m) the wider one reaches four.

**Why does the count jump when the scaffold gets slightly longer?**

Because ties go at each end and at no more than 30 feet (9.1 m) apart, measured from one end. A run of 60 feet (18.3 m) takes positions at each end and one 30 feet (9.1 m) along; a run of 61 feet (18.6 m) takes a fourth, at the far end. Every one of those positions takes a tie at every tie level, so one extra foot of scaffold can add a whole column of ties.

**Does this apply in the UK?**

No. OSHA's rule is United States law. In the UK a tube-and-fitting scaffold is tied to the pattern in the NASC's TG20 guidance for the configuration being built, or to a bespoke design where TG20 does not cover it, and system scaffolds follow their manufacturer's guidance. This page does not reproduce TG20, which is a proprietary document, so a UK reader should take the count here as an illustration of how a tie rule works rather than as the answer.

**Can a scaffold be guyed or braced instead of tied?**

Yes. The rule says guying, tying, bracing or equivalent means, and the same positions apply to whichever is used. A guy line or a raking brace takes up ground or floor space a tie does not, which is usually what decides between them.

## Related calculators

- [Scaffold Face Area and Hire Quantity Calculator](https://craftquantities.com/calculators/materials-quantities/scaffold-face-area-calculator/)
- [Scaffold Platform Load and Duty Rating Calculator](https://craftquantities.com/calculators/materials-quantities/scaffold-platform-load-calculator/)
- [Scaffold Plank Span Calculator (OSHA Appendix A)](https://craftquantities.com/calculators/materials-quantities/scaffold-plank-span-calculator/)
- [Scaffold Base Plate Bearing Pressure Calculator](https://craftquantities.com/calculators/materials-quantities/scaffold-baseplate-bearing-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/scaffold-tie-count-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/scaffold-tie-count-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `scaffold-tie-count-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/scaffold-tie-count-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/scaffold-tie-count-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.