# Rim Board Linear Footage Calculator

> Calculate total rim board length needed around a floor perimeter, including waste allowance.

Page: https://craftquantities.com/calculators/materials-quantities/rim-board-linear-footage-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.1, sources checked 2026-09-06, 2 published test vectors.

Rim board needed: 124 ft for Building Length 33 ft and Building Width 26 ft, the page's opening figures; on the metric page, 10 m and 8 m give 37.8 m. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Building Length | `buildingLength` | 10 m | 33 ft | mm, cm, m, in, ft, yd; range 0.01–60 m |
| Building Width | `buildingWidth` | 8 m | 26 ft | mm, cm, m, in, ft, yd; range 0.01–40 m |
| Waste Allowance (%) | `wastePercent` | 5 | 5 | range 0–20 |

- **Building Length**: The floor framing's overall length.
- **Building Width**: The floor framing's overall width.
- **Waste Allowance (%)**: Extra material to allow for cutting waste and seams at corners.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Rim board needed** | 37.8 m |
| Perimeter (no waste) | 36 m |

### US customary

| Result | Value |
|---|---|
| **Rim board needed** | 124 ft |
| Perimeter (no waste) | 118 ft |

## How it is worked out

The working the page shows, in order: Perimeter (no waste); then rim board needed.

The method, derived in full:

- [Quantity, Waste and Rounding](https://craftquantities.com/methodology/quantity-waste-and-rounding/): Why a material count is a ceiling function rather than a division, and why the waste factor — not the geometry — carries the risk.

What this calculation does not cover:

- Assumes the floor is a plain rectangle. A bay, a bump-out, a stepped footprint or an L-shaped plan all have a longer perimeter than twice length plus width, and a cantilevered section puts the rim at the cantilever line rather than at the wall below it. Two dimensions cannot describe those, and the shortfall turns up on site as a run with no board left for it.
- Says nothing about which board. The same metres are satisfied by a 25 mm (1 in) OSB rim and by a 45 mm (1.8 in) LSL rim of identical depth, and the choice is set by the vertical load coming down from the wall above — the rim is the bearing under that wall for the whole thickness of the joist zone. Ordering the length right in the wrong product gives a rim that crushes under the load path the drawing assumed it would carry.

## Sources

As the calculator cites them (sources checked 2026-09-06):

- Rim board runs the full perimeter of the floor framing at each level; total length = perimeter × (1 + waste factor)

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Is this just a length, or does it matter where the joints land?**

It matters a great deal, because a rim board is STRUCTURE that happens to be measured in feet. It does three jobs at once: it closes the ends of the joists so they cannot roll over under load, it carries the wall above down through the depth of the floor to the bearing below, and it ties the perimeter together. That is why a splice cannot fall wherever the stock length runs out — it has to land over bearing, or the load path stops there. It is also why the DEPTH is not negotiable in the way a trim profile is: a rim board shallower than the joists leaves the wall above bearing on nothing but the subfloor, and one deeper holds the joists off their seat. Ordering this short is not a second trip to the merchant, it is a splice in the wrong place that somebody has to open the floor to correct.

**Why does rim board length equal the building perimeter?**

Rim board (also called band board or box beam) closes off the end of the floor joists and runs continuously around the full perimeter of the floor framing at each level.

**How much waste allowance should I use?**

About 5% as a starting point, the page's default, and more for longer perimeters with more corners and splices, since stock board lengths and the layout decide it.

**Does this account for openings like stair wells?**

No — this calculates the outer perimeter only. Subtract or adjust separately for any interior floor openings that don't need perimeter rim board.

## Related calculators

- [Ceiling Joist Spanning Lineal Lumber Aggregator](https://craftquantities.com/calculators/materials-quantities/ceiling-joist-linear-footage-calculator/)
- [I-Joist Minimum Depth Selector](https://craftquantities.com/calculators/materials-quantities/i-joist-minimum-depth-calculator/)
- [Floor Joist Quantity Calculator (Joists, Rim Joists and Blocking)](https://craftquantities.com/calculators/materials-quantities/floor-joist-quantity-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/rim-board-linear-footage-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/rim-board-linear-footage-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `rim-board-linear-footage-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/rim-board-linear-footage-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/rim-board-linear-footage-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.