# Permeable Pavement Joint Fill Stone Calculator

> Jointing stone for a permeable pavement: the first fill, the top-up the joints take during compaction, and what each later replenishment round needs.

Page: https://craftquantities.com/calculators/materials-quantities/permeable-joint-fill-stone-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.0, sources checked 2026-08-30, 2 published test vectors.

Jointing stone for the first fill: 1,940 lb for Laid Pavement Area 1080 sq ft, the page's opening figures; on the metric page, 100 m² gives 862 kg. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Laid Pavement Area | `laidArea` | 100 m² | 1080 sq ft | m2, ft2, mm2, in2; range 1–20000 m² |
| Open Area of the Units | `openAreaPercent` | 10 | 10 | range 2–40 |
| Depth of Joint Fill | `jointDepth` | 50 mm | 2 in | mm, cm, m, in, ft, yd; range 0.01–0.15 m |
| Loose Bulk Density of the Stone | `bulkDensity` | 1500 kg/m³ | 93.6419 pcf | kgm3, pcf, lbyd3; range 1200–1900 kg/m³ |
| Compaction Top-Up Allowance | `topUpPercent` | 15 | 15 | range 0–50 |
| Replenishment per Maintenance Round | `replenishmentPercent` | 5 | 5 | range 0–30 |

- **Laid Pavement Area**: The plan area of permeable surfacing being laid.
- **Open Area of the Units**: The proportion of the surface made up of joints and apertures.
- **Depth of Joint Fill**: How deep the stone sits in the joint or aperture.
- **Loose Bulk Density of the Stone**: The delivered bulk density of the jointing aggregate.
- **Compaction Top-Up Allowance**: Extra stone the joints take as the pavement is vibrated and refilled.
- **Replenishment per Maintenance Round**: Proportion of the joint volume replaced at each cleaning cycle.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Jointing stone for the first fill** | 862 kg |
| Loose stone volume in the joints | 0.5 m³ |
| Stone before the compaction allowance | 750 kg |
| Stone for each replenishment round | 37.5 kg |
| First fill plus one replenishment round | 900 kg |

### US customary

| Result | Value |
|---|---|
| **Jointing stone for the first fill** | 1,940 lb |
| Loose stone volume in the joints | 0.67 yd³ |
| Stone before the compaction allowance | 1,685.55 lb |
| Stone for each replenishment round | 84.28 lb |
| First fill plus one replenishment round | 2,022.67 lb |

- Allowance in the figure: Compaction top-up allowance (15%).
- Confidence: medium.

## How it is worked out

Joint fill is the working part of a permeable pavement — it is where the water goes in, and a pavement whose joints have not been kept topped up stops infiltrating long before anything else in the build-up fails. Order the first fill with the pavers, and put the replenishment quantity into the maintenance plan rather than discovering it later.

The working the page shows, in order: Loose stone volume in the joints; Stone before the compaction allowance; Stone for each replenishment round; First fill plus one replenishment round; then jointing stone for the first fill.

The method, derived in full:

- [Volume from Geometry, and the Order That Follows](https://craftquantities.com/methodology/volume-from-geometry/): Why the depth carries almost all the risk in a volume, why an excavation holds far more than its plan area suggests, and why a bag's yield is not its weight divided by a density.

What this calculation does not cover:

- Jointing and aperture stone only. The bedding course, the open-graded base and subbase, geotextiles and edge restraints are separate quantities on their own gradations.
- Does not size the pavement hydraulically. Whether the joints and the reservoir beneath them accept the design storm is an infiltration and storage calculation.

A professional must decide:

- Structure: sizes, thicknesses, spans, reinforcement and bearing are a structural engineer's or the building official's decision. This is a quantity, not a design.

## Sources

As the calculator cites them (sources checked 2026-08-30):

- ASCE/T&DI 68-18, Permeable Interlocking Concrete Pavement, which covers the construction and the maintenance regime that makes joint replenishment a recurring quantity rather than a one-off
- ASTM D448 defines the standard size numbers used for jointing and bedding aggregate in permeable pavements; the gradation chosen changes both the void structure and the bulk density entered here
- The top-up and replenishment percentages are rules of thumb, not published figures — the joints take more stone during compaction than their nominal volume, and lose some at every cleaning cycle, by amounts that depend on the unit, the plant and the site

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Why does a permeable pavement need topping up during construction?**

Because compaction is what settles the stone into the joint, and the joint that looked full before the plate compactor went over it is no longer full afterwards. The standard sequence is fill, compact, refill and compact again until the joints stop taking material, and the allowance in this calculation is what covers that second and third pass.

**Can I use jointing sand instead of stone?**

Not in a permeable pavement. Sand is graded to fill its own voids and will seal the joint, which removes the only path water has into the structure — the pavement then behaves as an impermeable surface with an expensive reservoir underneath it. Jointing material here is a small, clean, single-sized crushed aggregate chosen for the voids it keeps open.

**How often will the joints actually need replenishing?**

When a measured drop in infiltration rate says so, rather than on a date in a diary, and how soon that comes depends almost entirely on what reaches the surface. A car park catching silt off adjacent landscaping clogs far faster than a courtyard with no run-on. The quantity per round is what this gives you; the interval comes from testing the pavement.

**Is this the same calculation as mortar in an ashlar stone joint?**

No, and the two answer opposite questions. A masonry joint calculation works out the volume of mortar that fills the gap between cut stones in a wall and seals it. This works out the mass of loose, single-sized stone poured into the openings of a horizontal pavement specifically so the joint stays open, and it repeats for every maintenance round the pavement's life includes.

## Related calculators

- [PICP Permeable Pavement Infiltration Storage Calculator](https://craftquantities.com/calculators/sustainability-compliance/picp-infiltration-storage-calculator/)
- [Paver Base & Sand Calculator](https://craftquantities.com/calculators/materials-quantities/paver-base-calculator/)
- [Paver Polymeric Sand Calculator](https://craftquantities.com/calculators/materials-quantities/paver-polymeric-sand-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/permeable-joint-fill-stone-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/permeable-joint-fill-stone-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `permeable-joint-fill-stone-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/permeable-joint-fill-stone-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/permeable-joint-fill-stone-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.