Estimated paver needed: 143 pavers for Patio Length 13 ft, Patio Width 10 ft and Area Left Unpaved 0 sq ft, the page's opening figures; on the metric page, 4 m, 3 m and 0 m² give 143 pavers. Sources are cited below.

## Key facts

- Paver count is the area to cover divided by one paver's length × width, rounded up with a waste allowance for cuts along edges and curves. (source: Paver count formula: Paver count = area to cover / (paver length x paver width), rounded up with a waste allowance for cuts along edges and curves)
- One square foot is 0.09290304 m² (NIST), so a 12 × 12 in paver covers 0.0929 m² and 100 sq ft (9.29 m²) of patio takes 100 such pavers before waste. ([NIST SI Guide, App. B.9](https://www.nist.gov/pml/special-publication-811/nist-guide-si-appendix-b-conversion-factors/nist-guide-si-appendix-b9): NIST Guide to the SI, Appendix B.9: Factors for units listed by kind of quantity, National Institute of Standards and Technology)
- One inch is exactly 2.54 cm (NIST), so a 16 × 16 in paver is 40.64 cm square and covers 1.78 sq ft (0.165 m²). ([NIST SI Guide, App. B.9](https://www.nist.gov/pml/special-publication-811/nist-guide-si-appendix-b-conversion-factors/nist-guide-si-appendix-b9): NIST Guide to the SI, Appendix B.9: Factors for units listed by kind of quantity, National Institute of Standards and Technology)

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Patio Length | `patioLength` | 4 m | 13 ft | mm, cm, m, in, ft, yd; range 0.01–50 m |
| Patio Width | `patioWidth` | 3 m | 10 ft | mm, cm, m, in, ft, yd; range 0.01–50 m |
| Area Left Unpaved | `deductArea` | 0 m² | 0 sq ft | m2, ft2, mm2, in2; range 0–2500 m² |
| Paver Length | `paverLength` | 30.48 cm | 12 in | mm, cm, m, in, ft, yd; range 0.01–0.9144 m |
| Paver Width | `paverWidth` | 30.48 cm | 12 in | mm, cm, m, in, ft, yd; range 0.01–0.9144 m |
| Waste Factor (%) | `wasteFactorPercent` | 10 | 10 | range 5–25 |

- **Patio Length**: The length of the area to be paved.
- **Patio Width**: The width of the area to be paved.
- **Area Left Unpaved**: Any part of the rectangle that is not paved — a pool, a planting bed, a tree pit. Leave it at 0 for a plain rectangle.
- **Paver Length**: The length of a single paver.
- **Paver Width**: The width of a single paver.
- **Waste Factor (%)**: Extra pavers for edge cuts, curves, and breakage.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Estimated paver needed** | 143 pavers |
| Patio area | 12 m² |
| Coverage per paver | 0.09 m² |

### US customary

| Result | Value |
|---|---|
| **Estimated paver needed** | 143 pavers |
| Patio area | 130 sq ft |
| Coverage per paver | 1 sq ft |

## Formula with your numbers

1. **Take off what is not paved**: 13 ft × 10 ft − 0 sq ft = 130 sq ft
2. **Work out one paver's face**: 12 in × 12 in = 1 sq ft
3. **Divide, add waste and round up**: 130 sq ft ÷ 1 sq ft + 10% waste, rounded up = 143 pavers

Worked on the figures the page opens on; the page re-works each step on the reader's own.

## How to calculate paver in 3 steps

1. **Take off what is not paved**: Measure the length and width across the outside edge, multiply them, and take off any pool, planting bed or tree pit inside that is not paved.
2. **Work out one paver's face**: Multiply the actual length and width of one paver for the area it covers.
3. **Divide, add waste and round up**: Divide the paved area by one paver's area, add the waste percentage for edge cuts, curves and breakage, and round up to whole pavers.

## Pavers for common patio sizes

Page defaults, not your figures above.

| Patio (length × width) | Estimated paver needed |
|---|---|
| 10 × 10 ft (3.05 × 3.05 m) | 110 pavers |
| 12 × 12 ft (3.66 × 3.66 m) | 159 pavers |
| 12 × 16 ft (3.66 × 4.88 m) | 212 pavers |
| 16 × 20 ft (4.88 × 6.1 m) | 352 pavers |
| 20 × 20 ft (6.1 × 6.1 m) | 440 pavers |
| 3 × 3 m (9.84 × 9.84 ft) | 107 pavers |
| 4 × 4 m (13.12 × 13.12 ft) | 190 pavers |
| 4 × 6 m (13.12 × 19.69 ft) | 285 pavers |
| 5 × 5 m (16.4 × 16.4 ft) | 297 pavers |

## How it is worked out

The pavers are the visible tenth of the job. What determines whether they stay flat is the base beneath them and the edge restraint around them, and both are larger quantities than the surface.

The working the page shows, in order: Patio area; Coverage per paver; then estimated paver needed.

The method, derived in full:

- [Quantity, Waste and Rounding](https://craftquantities.com/methodology/quantity-waste-and-rounding/): Why a material count is a ceiling function rather than a division, and why the waste factor — not the geometry — carries the risk.

What this calculation does not cover:

- Excludes the sub-base, bedding layer and jointing sand, each of which has its own depth and its own compaction allowance.
- Excludes the edge restraint, without which the field spreads laterally under traffic and the joints open.
- Does not model cutting waste on a curved or angled layout, which is far higher than on a rectangular field.

## Sources

As the calculator cites them (sources checked 2026-09-25):

- Paver count = area to cover / (paver length x paver width), rounded up with a waste allowance for cuts along edges and curves

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**What actually holds a paved area flat?**

The compacted sub-base, not the pavers. A paved surface is a flexible system in which the base spreads the load and the pavers wear; a thin base under good pavers settles and ruts, while a deep well-compacted base under modest pavers stays flat for decades. The base is also the larger quantity, and it is where the cost sits.

**Why does edge restraint matter?**

Because the field is only held together by friction in the joints, and that friction depends on the pavers being pressed against each other. Without a restraint at the perimeter the outer course creeps outward under traffic, the joints open, jointing sand washes out, and the failure works inward from the edge. It is a small item guarding the whole area.

**Should the bedding layer be thick?**

No — and thickening it is a common mistake. The bedding sand is a thin, uniform screed whose only job is to accommodate the small dimensional variation between pavers. Made thick, it behaves as a soft layer that consolidates unevenly under load, and the surface ruts along the wheel tracks. Depth belongs in the sub-base.

**How much cutting waste should I allow?**

About 10% for a simple rectangular layout, the page's default, and more for curved edges or a herringbone or diagonal pattern: the shape decides it, not the area. A rectangular field with a running bond wastes little because the offcut from one course starts the next. A circular, curved or diagonally laid area cuts every perimeter unit at an angle and reuses almost none of it — and a herringbone pattern cuts every edge unit regardless of the shape.

**How many 12 by 12 inch pavers does a 10 ft by 13 ft patio take?**

143 pavers with the default 10% waste: the 130 sq ft at 1 sq ft a paver is 130 pavers, and 10% more is 143. The metric opening, 4 m by 3 m (12 m²) in the same 30.48 cm pavers, also comes to 143, since 12 m² is 129.2 pavers before the waste is added and the count is rounded up.

**Should I enter the paver's nominal size or its actual size?**

The actual size: the paver width field's guidance says to measure the paver itself, not the nominal size, for the most accurate count. The page divides the area by the length times width you enter, so a paver a little smaller than its label adds pavers across a large patio.

**How do I count pavers for a pool surround or a patio with a planting bed in it?**

Measure the length and width across the whole outside edge, then enter the pool, bed or tree pit in the Area Left Unpaved field. It comes off before the count, so the waste allowance is applied to the paving only; for a pool, add the coping band to it if the coping is bought separately.

## Related calculators

- [Square Footage Calculator](https://craftquantities.com/calculators/measurements-conversions/square-footage-calculator/)
- [Concrete Calculator](https://craftquantities.com/calculators/materials-quantities/concrete-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/paver-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/paver-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `paver-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/paver-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/paver-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.