# Open-Graded Bedding Course Stone Calculator

> Loose volume and delivered tonnage of the screeded No. 8 bedding course under permeable pavers, with the allowance for it closing up under compaction.

Page: https://craftquantities.com/calculators/materials-quantities/open-graded-bedding-course-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.1, sources checked 2026-09-06, 2 published test vectors.

Delivered bedding stone: 9.73 tons for Area of Pavement Being Bedded 1290 sq ft and Nominal Screeded Thickness 2 in, the page's opening figures; on the metric page, 120 m² and 50 mm give 8.7 t. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Area of Pavement Being Bedded | `laidArea` | 120 m² | 1290 sq ft | m2, ft2, mm2, in2; range 1–5000 m² |
| Nominal Screeded Thickness | `screededThickness` | 50 mm | 2 in | mm, cm, m, in, ft, yd; range 0.02–0.1 m |
| Densification Allowance (%) | `densificationAllowance` | 15 | 15 | range 0–40 |
| Loose Bulk Density of the Stone | `looseDensity` | 1450 kg/m³ | 90.5205 pcf | kgm3, pcf, lbyd3; range 1100–1900 kg/m³ |

- **Area of Pavement Being Bedded**: Plan area of the permeable surface that this screeded course sits under.
- **Nominal Screeded Thickness**: Screeded depth of the bedding course before the units go down — the reference detail is a nominal 50 mm (2 in).
- **Densification Allowance (%)**: Extra loose stone ordered to cover the course closing up when the units are compacted.
- **Loose Bulk Density of the Stone**: Uncompacted bulk density of the delivered gradation, from the supplier's ticket or data sheet.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Delivered bedding stone** | 8.7 t |
| Screeded stone volume to deliver | 6 m³ |
| Course volume once the units are bedded and compacted | 5.22 m³ |
| Volume the course loses to densification | 0.78 m³ |

### US customary

| Result | Value |
|---|---|
| **Delivered bedding stone** | 9.73 tons |
| Screeded stone volume to deliver | 7.96 yd³ |
| Course volume once the units are bedded and compacted | 6.92 yd³ |
| Volume the course loses to densification | 1.04 yd³ |

- Confidence: medium.

## How it is worked out

Both the loose density and the densification allowance are site figures rather than constants. Order the first delivery against this estimate, screed one bay, and reconcile before the balance is called off.

The working the page shows, in order: Screeded stone volume to deliver; Course volume once the units are bedded and compacted; Volume the course loses to densification; then delivered bedding stone.

The method, derived in full:

- [Bulking, Swell and the Three Volumes of One Soil](https://craftquantities.com/methodology/bulking-and-swell/): Why a hundred cubic metres dug out becomes a hundred and twenty-five to cart away and ninety when it is put back, and why a cut-and-fill balance struck in the wrong state does not balance.

What this calculation does not cover:

- Covers the bedding course only — the No. 57 choker, the subbase and the joint fill are separate gradations bought separately.
- Assumes a uniform screeded thickness across the whole area; a section that varies in depth has to be split and run per zone.

A professional must decide:

- Structure: sizes, thicknesses, spans, reinforcement and bearing are a structural engineer's or the building official's decision. This is a quantity, not a design.

## Sources

As the calculator cites them (sources checked 2026-09-06):

- ASCE/T&DI 68-18, Permeable Interlocking Concrete Pavement, gives the bedding course as a screeded layer of open-graded No. 8 stone at a nominal 50 mm (2 in), laid to a uniform thickness and not compacted before the units are set
- Loose (uncompacted) bulk density of the delivered stone is the supplier's figure for the gradation and quarry actually being used; it is entered here rather than assumed, because it varies with source and moisture
- The densification allowance — the extra loose stone needed because a screeded course closes up when the pavers are plate-compacted — is a rule of thumb rather than a published coefficient; check it against the first bay laid and revise the order

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Why can't I bed permeable pavers on sand like a conventional patio?**

Sand migrates. Placed over an open-graded base it works its way down into the coarse voids under traffic and vibration, and the storage layer you paid for gradually becomes a filter that holds water instead of passing it. The permeable detail beds on small open-graded stone for that reason, and the choker course below keeps the two gradations apart.

**Should the bedding course be compacted before the units are set?**

No. It is screeded to a uniform thickness and then left alone — nobody walks it, and no plate touches it until the pavers are down. Compaction happens through the units afterwards, which is exactly why the delivered quantity has to exceed the finished volume.

**Where does the densification allowance come from?**

Experience on the job, not a table. It represents the difference between loose stone tipped on a screed board and the same stone once the pavers above it have been plate-compacted. Fifteen percent is a common starting point; the honest way to set it is to measure what the first bay consumed against its area and thickness, then apply that ratio to the rest.

**Does this quantity include the stone that fills the joints?**

It does not. Joint and aperture fill is a separate operation with its own gradation, and it is topped up and recompacted repeatedly until the joints stop taking material — a quantity that depends on joint width and unit geometry rather than on bedding depth.

## Related calculators

- [PICP Permeable Pavement Infiltration Storage Calculator](https://craftquantities.com/calculators/sustainability-compliance/picp-infiltration-storage-calculator/)
- [Paver Base & Sand Calculator](https://craftquantities.com/calculators/materials-quantities/paver-base-calculator/)
- [Permeable Reservoir Drawdown Time Calculator](https://craftquantities.com/calculators/sustainability-compliance/reservoir-drawdown-time-calculator/)
- [Roadway Base Course Aggregate Tonnage Calculator](https://craftquantities.com/calculators/materials-quantities/base-course-tonnage-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/open-graded-bedding-course-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/open-graded-bedding-course-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `open-graded-bedding-course-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/open-graded-bedding-course-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/open-graded-bedding-course-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.