# Mortar Mix Calculator (ASTM C270 Types M, S, N, O)

> Batch quantities of cement, lime and sand for a mortar volume, by ASTM C270 type, using the proportion specification — with what each type is for.

Page: https://craftquantities.com/calculators/materials-quantities/mortar-mix-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.0, sources checked 2026-09-15, 3 published test vectors.

Sand needed: 38.5 ft³ for Mortar needed 35 ft³, the page's opening figures; on the metric page, 1 m³ gives 1.1 m³. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Mortar needed | `mortarVolume` | 1 m³ | 35 ft³ | l, gal, m3, ft3, yd3; range 1–200000 L |
| Mortar type | `mortarType` | Type N — general purpose, exterior above grade | Type N — general purpose, exterior above grade | `M`, `S`, `N`, `O` |
| Sand per part of binder | `sandRatio` | 3 | 3 | range 2.25–3 |
| Waste allowance | `wastePercent` | 10 | 10 | range 0–40 |

- **Mortar needed**: The volume of wet mortar the job needs.
- **Mortar type**: The ASTM C270 type, which sets how much lime goes in per part of cement.
- **Sand per part of binder**: Volumes of sand per combined volume of cement and lime.
- **Waste allowance**: Percentage added for droppings, board waste and part batches.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Sand needed** | 1.1 m³ |
| Cement | 0.2 m³ |
| Hydrated lime | 0.17 m³ |
| Sand | 1.1 m³ |
| 25 kg cement bags | 12 bags |
| Mortar after waste | 1.1 m³ |

### US customary

| Result | Value |
|---|---|
| **Sand needed** | 38.5 ft³ |
| Cement | 6.84 ft³ |
| Hydrated lime | 5.99 ft³ |
| Sand | 38.5 ft³ |
| 94 lb sacks (1 ft³ each) | 7 sacks |
| Mortar after waste | 38.5 ft³ |

- Confidence: medium.

## How it is worked out

Type N: 1 part cement to 0.875 lime to 3 sand, by volume. The standard allows 0.5 to 1.25 parts lime for this type — use the ratio your specification names if it gives one. Suits most above-grade exterior and interior load-bearing walls, and the usual default. This is the proportion specification and does not certify a strength.

The working the page shows, in order: Cement; Hydrated lime; Sand; 25 kg cement bags; Mortar after waste; then sand needed.

The method, derived in full:

- [Masonry Units, Coursing and the Things That Support Them](https://craftquantities.com/methodology/masonry-units-coursing-and-support/): Why a brick's working size is the unit plus its joint, why a dry brick ruins the mortar bond, and why a veneer's shelf angle is governed by eccentricity rather than by weight.

What this calculation does not cover:

- This is the PROPORTION specification of ASTM C270 and it certifies no strength. A mortar batched to these volumes has not been tested, and the compressive strengths in the standard's property table belong to laboratory specimens prepared a different way. Never state that a proportion-batched mortar meets a property specification.
- Yield is taken as the sand volume, which is a trade convention rather than a measured property. Sand grading moves it: a well-graded sand has fewer voids for the paste to fill and yields slightly more than its own volume, a single-sized sand rather less.
- Sand is assumed batched DAMP and by volume, as it is on site. Damp sand bulks by a fifth to a third, so a volume batch of dry sand puts materially more sand into the mix than intended — which is a weaker mortar, not a stronger one.
- The lime figure is the midpoint of the band the standard allows for that type. Where a specification names a ratio, use theirs; the band is wide for Types N and O and the ends behave noticeably differently.
- Masonry cement and mortar cement are not covered. Both replace the separate cement-and-lime pair with a single bagged product, their C270 proportion rows are different, and substituting one for the other at these volumes gives the wrong mix.
- Nothing here addresses colour, admixtures, or matching an existing mortar. Repointing historic masonry is a different problem in which a cement-based mortar of any C270 type may be the wrong answer entirely.

A professional must decide:

- Structure: sizes, thicknesses, spans, reinforcement and bearing are a structural engineer's or the building official's decision. This is a quantity, not a design.

## Sources

As the calculator cites them (sources checked 2026-09-15):

- Proportions are the ASTM C270 PROPORTION specification, parts by volume per 1 part portland cement: Type M 1/4 lime, Type S over 1/4 to 1/2, Type N over 1/2 to 1 1/4, Type O over 1 1/4 to 2 1/2. The midpoint of each band is used as the nominal and both ends are shown
- Aggregate is not less than 2 1/4 and not more than 3 times the sum of the cementitious volumes, which is why the sand ratio is an input bounded at those limits rather than a fixed figure
- Wet yield is taken as the sand volume, because the binder paste occupies the voids between sand grains rather than adding to them — a trade convention stated here rather than a measured property, and it moves with the sand's grading
- A US sack of portland cement is 94 lb and one cubic foot by definition, so that bag volume is exact. The 25 kg metric bag volume assumes a loose bulk density near 1,500 kg per cubic metre and is an assumption, not a definition

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Why is a stronger mortar not a better mortar?**

Because the mortar is meant to be the weakest part of the wall, and making it strong moves the damage somewhere you cannot repair. Masonry moves — thermally, with moisture, with small settlements — and that movement has to go somewhere. A mortar weaker than the units cracks at the joint, which is a repointing job. A mortar stronger than the units cracks the UNITS, which is a rebuild, and on a soft historic brick it also traps moisture and spalls the faces. That is why Type O exists and why repointing an old soft wall in Type M or S does real damage rather than none. The rule that survives across markets is the same one British mortar designations encode: choose the weakest mortar that will do the job, not the strongest available.

**What does the lime actually do?**

Three things that cement cannot, which is why it is in the proportion table rather than being an optional extra. It makes the mortar WORKABLE — plastic and sticky enough to stay on a trowel and to squeeze into a joint without falling out — and workability is what lets a bricklayer get a full bed rather than a hollow one. It holds WATER against the suction of a dry brick, so the cement can hydrate instead of being drained before it sets. And it gives the set mortar some capacity to heal: lime slowly recarbonates, and fine cracks in a limey mortar close over time in a way a straight cement mortar's do not. The trade-off is strength and set speed, which is exactly the axis the four C270 types are arranged along.

**Why does the calculator say the sand volume is the mortar volume?**

Because the binder does not add to the pile, it fills the gaps in it. Loose sand is roughly a third voids, and the cement and lime paste occupies those voids rather than sitting between the grains and pushing them apart. So a batch made with a cubic metre of sand yields close to a cubic metre of mortar, and adding the three component volumes together — sand plus cement plus lime — over-states the yield by something like half. It is the same reason a concrete mix's yield is not the sum of its ingredients. The convention is close enough for ordering and is stated on this page rather than hidden, because sand grading moves it: a well-graded sand has fewer voids and yields a little more, a single-sized sand a little less.

**How does an ASTM type map onto a British mortar designation?**

Loosely, and the mapping is by intent rather than by equivalence. British practice numbers mortar designations from (i) — the strongest, cement-rich — down to (iv) and (v), which are lime-rich and soft, and recent standards specify mortar by compressive strength class instead. The ordering corresponds: an ASTM Type M sits near a designation (i), Type S near (ii), Type N near (iii), Type O near (iv). What does not correspond is the arithmetic, because the proportion tables differ and the sand ratio is expressed differently, so converting a specification by looking up the nearest row produces a mortar that is approximately right and provably nothing. A specification written against one standard should be batched against that standard.

## Related calculators

- [Brick Calculator](https://craftquantities.com/calculators/materials-quantities/brick-calculator/)
- [Tuckpointing Mortar Repair Volume Calculator](https://craftquantities.com/calculators/materials-quantities/tuckpointing-repair-volume-calculator/)
- [Concrete Mix Ratio Calculator](https://craftquantities.com/calculators/materials-quantities/concrete-mix-ratio-calculator/)
- [Lime Mortar Mix Calculator (NHL and Lime Putty)](https://craftquantities.com/calculators/materials-quantities/lime-mortar-mix-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/mortar-mix-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/mortar-mix-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `mortar-mix-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/mortar-mix-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/mortar-mix-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.