# Lawn Edging Calculator

> Coils or straight lengths of lawn and bed edging for a measured edge, straight or curved, open or a closed bed, with the joints and the stakes along it.

Page: https://craftquantities.com/calculators/materials-quantities/lawn-edging-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.0, sources checked 2026-09-26, 5 published test vectors.

Edging to buy: 4 coils for Edge Length 66 ft, Coil or Length Size 20 ft and Overlap at Each Joint 0 in, the page's opening figures; on the metric page, 20 m, 6.1 m and 0 mm give 4 coils. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Edge Length | `edgeLength` | 20 m | 66 ft | mm, cm, m, in, ft, yd; range 0.5–500 m |
| Edge Shape | `runShape` | Open run (two ends) | Open run (two ends) | `open`, `loop` |
| Edging Type | `product` | Coil (flexible, sold rolled) | Coil (flexible, sold rolled) | `coil`, `straight` |
| Coil or Length Size | `pieceLength` | 6.1 m | 20 ft | mm, cm, m, in, ft, yd; range 0.5–60 m |
| Overlap at Each Joint | `jointOverlap` | 0 mm | 0 in | mm, cm, m, in, ft, yd; range 0–0.3 m |
| Stake Spacing | `stakeSpacing` | 0.9 m | 3 ft | mm, cm, m, in, ft, yd; range 0.2–3 m |

- **Edge Length**: The length of the edge you are lining, measured along it — curves included.
- **Edge Shape**: Whether the edge has two ends or closes on itself.
- **Edging Type**: How the edging is sold. It changes what the answer counts, not the arithmetic.
- **Coil or Length Size**: The length of one coil or one straight piece, as printed on the pack.
- **Overlap at Each Joint**: How much of each piece is lost where it laps the next one. Zero where the ends butt into a connector.
- **Stake Spacing**: The largest gap between stakes the edging's instructions allow.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Edging to buy** | 4 coils |
| Coil size | 6.1 m |
| Edging bought | 24.4 m |
| Connectors, one per joint | 3 |
| Left over after the last cut | 4.4 m |
| Stakes | 24 |
| Stake centres, as set out | 0.87 m |

### US customary

| Result | Value |
|---|---|
| **Edging to buy** | 4 coils |
| Coil size | 20 ft |
| Edging bought | 80 ft |
| Connectors, one per joint | 3 |
| Left over after the last cut | 14 ft |
| Stakes | 23 |
| Stake centres, as set out | 3 ft |

## How it is worked out

The working the page shows, in order: Coil size; Edging bought; Connectors, one per joint; Left over after the last cut; Stakes; Stake centres, as set out; then edging to buy.

The method, derived in full:

- [Spacing, Pitch and the Count That Follows](https://craftquantities.com/methodology/spacing-pitch-and-count/): Why a run divided by a spacing gives the number of gaps and not the number of things, why the division rounds up rather than to nearest, and what the leftover bay at the end does to both.
- [Perimeter Runs, Stock Lengths and Mitres](https://craftquantities.com/methodology/perimeter-runs-and-mitres/): Why a room's area tells you nothing about how much skirting it needs, why adding a door can increase the trim order, and why a crown moulding mitre is neither forty-five degrees nor half the corner angle.

What this calculation does not cover:

- The edge length is taken as measured and nothing is added to it. An edging that turns down into a path, wraps a corner post or tucks under a step uses more than the line on the ground, and a curve measured by pacing or across its chord is shorter than the edging that follows it.
- Stakes are spaced evenly along the whole edge and nothing extra is added at the joints. Where the instructions ask for a stake at every joint or either side of it, add the joint count, and close the spacing on tight curves and soft ground, which this page leaves to the figure you type.
- Every piece is taken as the same size and as usable to its very end. Offcuts are not carried from one bed to the next, so two beds worked separately can each leave a remainder that a single order would have used up, and a damaged or kinked coil end is not allowed for.
- This counts edging, connectors and stakes, not the digging. The trench depth, the edging's height above the lawn, any mowing strip laid beside it and the backfill are outside the count, and so is whether a light plastic edging is the right restraint at all where a path or a driveway runs next to it.

## Sources

As the calculator cites them (sources checked 2026-09-26):

- Open run: pieces = (edge length - overlap) / (piece length - overlap), rounded up; closed loop: pieces = edge length / (piece length - overlap), rounded up. Joints = pieces - 1 open, pieces closed. Stakes = edge length / stake spacing, rounded up, plus one on an open run.

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**How do I measure a curved bed edge?**

Along the curve, not across it. Lay a garden hose or a string on the line the edging will follow, mark where it starts and stops, then pull it straight and measure it — or push a measuring wheel round the edge. Adding up a bed's length and width gives the rectangle round it, which is shorter than a winding edge on one side and longer than a round bed on the other.

**Why does a closed bed need one more joint than the same edge left open?**

Because the last piece has to meet the first. An open run of four pieces has three joints between them and two free ends; close it into a ring and the two ends become a fourth joint. The stakes go the other way: an open run needs one at each end, so it takes one more stake than a loop of the same length.

**Do I need to allow for overlaps?**

Only if the system laps. Coils joined with a connector sleeve butt end to end and lose nothing, so leave the overlap at zero. Straight lengths that slot or lap into each other lose that length at every joint, which on short pieces adds up quickly: three 6 m (20 ft) lengths lapped 300 mm (12 in) cover 17.4 m (57 ft) rather than 18 m (59 ft).

## Related calculators

- [Paver Edging Calculator](https://craftquantities.com/calculators/materials-quantities/paver-edging-calculator/)
- [Mulch Calculator](https://craftquantities.com/calculators/landscaping-outdoor/mulch-calculator/)
- [Raised Garden Bed Soil Calculator](https://craftquantities.com/calculators/materials-quantities/raised-garden-bed-soil-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/lawn-edging-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/lawn-edging-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `lawn-edging-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/lawn-edging-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/lawn-edging-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.