Version 1.0.0, sources checked 2026-10-05, 3 published test vectors.

Screed to order, margin included: 2.14 yd³ for Floor Area 220 sq ft, Average Screed Depth 3 in and Sand and Cement per Volume Laid 124.86 pcf, the page's opening figures; on the metric page, 20 m², 75 mm and 2000 kg/m³ give 1.58 m³. Source: Mineral Products Association, MPA Mortar Data Sheet 22, Screeds (Issue 3, October 2023), reporting BS 8204-1.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Floor Area | `floorArea` | 20 m² | 220 sq ft | m2, ft2, mm2, in2; range 0.1–10000 m² |
| Average Screed Depth | `screedDepth` | 75 mm | 3 in | mm, cm, m, in, ft, yd; range 0.005–0.2 m |
| How the Screed Is Laid | `construction` | Floating on insulation, in housing | Floating on insulation, in housing | `bonded`, `unbonded`, `floating-domestic`, `floating-commercial` |
| Screed Type and How It Arrives | `screedType` | Sand and cement, mixed on site | Sand and cement, mixed on site | `site-mixed`, `ready-to-use`, `bagged`, `liquid-anhydrite` |
| Mix Ratio, Cement to Sand by Weight | `mixRatio` | 1 : 4 by weight (BS 8204-1's nominal mix) | 1 : 4 by weight (BS 8204-1's nominal mix) | `3`, `4`, `4.5`, `5` |
| Sand and Cement per Volume Laid | `dryMixDensity` | 2000 kg/m³ | 124.856 pcf | kgm3, pcf, lbyd3; range 1500–2400 kg/m³ |
| Cement Bag Size | `cementBagMass` | 25 kg | 94 lb | kg, lb, t, ton; range 1–1500 kg |
| Ready-to-Use Screed per Volume Laid | `deliveredDensity` | 2220 kg/m³ | 138.59 pcf | kgm3, pcf, lbyd3; range 1500–2600 kg/m³ |
| Yield of One Bag of Screed Mix | `bagYield` | 13.5135 L | 0.66 ft³ | l, gal, m3, ft3, yd3; range 1–100 L |
| Waste / Over-Order (%) | `wastePercent` | 5 | 5 | range 0–30 |

- **Floor Area**: The area of floor the screed covers, room by room where the depth changes.
- **Average Screed Depth**: The depth the screed is laid at on average across the floor, not only its thinnest point.
- **How the Screed Is Laid**: Bonded to the base, separated from it, or floating on insulation: it sets the least depth shown, not the volume.
- **Screed Type and How It Arrives**: Mixed on site from sand and cement, delivered ready to lay, from bags of premix, or pumped as a liquid screed.
- **Mix Ratio, Cement to Sand by Weight**: Parts of sand for each part of cement, by weight. 1 : 4 is the usual screed.
- **Sand and Cement per Volume Laid**: How much sand and cement, as batched, a volume of compacted screed holds: 2,000 kg/m³ (125 lb/ft³) on Sika's figures.
- **Cement Bag Size**: The weight of one bag of cement as sold: 25 kg (55 lb) in the UK, a 94 lb (42.6 kg) sack in the US.
- **Ready-to-Use Screed per Volume Laid**: The delivered weight a volume of laid screed takes, from the supplier's coverage table: about 2,220 kg/m³ (139 lb/ft³).
- **Yield of One Bag of Screed Mix**: The volume of laid screed one bag makes, from the bag or its data sheet: 13.5 L (0.48 ft³) for ARDEX A 38 MIX.
- **Waste / Over-Order (%)**: Extra on top of the volume for spillage, the mixer's leavings and edges. Holcim UK recommends 5%.

`mixRatio` applies only when `screedType` is `site-mixed`.
`dryMixDensity` applies only when `screedType` is `site-mixed`.
`cementBagMass` applies only when `screedType` is `site-mixed`.
`deliveredDensity` applies only when `screedType` is `ready-to-use`.
`bagYield` applies only when `screedType` is `bagged`.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Screed to order, margin included** | 1.58 m³ |
| Screed volume at the depth entered | 1.5 m³ |
| Sand and cement together, as batched | 3.15 t |
| Cement by weight | 630 kg |
| Cement bags at the size entered | 26 bags |
| Sharp sand by weight | 2.52 t |
| Least depth for this screed laid this way | 65 mm |

### US customary

| Result | Value |
|---|---|
| **Screed to order, margin included** | 2.14 yd³ |
| Screed volume at the depth entered | 2.04 yd³ |
| Sand and cement together, as batched | 3.61 tons |
| Cement by weight | 1,442.09 lb |
| Cement bags at the size entered | 16 bags |
| Sharp sand by weight | 2.88 tons |
| Least depth for this screed laid this way | 2.56 in |

- Allowance in the figure: Over-order for spillage, the mixer's leavings and edges (5%).

## How it is worked out

The cement and the sand share the mix by weight at the ratio chosen, so at 1 : 4 one part in five is cement; the cement is rounded up to whole bags and the sand is shown by weight. BS 8204-1, as the Mineral Products Association's screed data sheet reports it, gives 65 mm (2.56 in) as the least depth for a floating cement and sand screed in housing.

The working the page shows, in order: Screed volume at the depth entered; Sand and cement together, as batched; Cement by weight; Cement bags at the size entered; Sharp sand by weight; Least depth for this screed laid this way; then screed to order, margin included.

The method, derived in full:

- [Mass from Volume and Density](https://craftquantities.com/methodology/mass-from-volume-and-density/): Why a rolled steel section's mass is read from a table rather than computed, why one material has five densities, and why a tonne of wet sand is less sand.

What this calculation does not cover:

- The volume is the area times the depth entered. Over a base that is out of level the depth varies from place to place, and the figure is only as good as the average depth typed in; the thickness calculator works out the least depth a cement and sand screed needs over the high spots.
- A screed over underfloor heating pipes is not worked here. The pipe takes some of the volume and the cover over it carries its own minimum, and the heated screed calculator handles both.
- The sand is the sand in the mix by weight, at the figure entered for the sand and cement in a volume laid. Sharp sand is sold damp — Heidelberg Materials gives a typical moisture content of 5% for its sharp sand — so part of a delivered load's weight is water. If the figure entered is for dry sand, an order to it alone leaves the mix a little short of sand unless the margin covers it; Sika's data sheet, where the page's figure comes from, does not say whether its sand is dry.
- Every yield here is a maker's figure for its own product: Sika's for the site mix as batched, Marshalls' coverage for a ready-to-use screed, ARDEX's and QUIKRETE's for a bag. A different sand, binder or premix changes them, and the supplier's data sheet is the figure to enter.
- The least depth shown is BS 8204-1's for a cement and sand levelling screed, as the Mineral Products Association reports it, or Anhydritec's for its calcium sulfate screed. Another maker's product can ask for more or allow less. ARDEX A 70 GYPFLO asks 45 mm (1.77 in) floating and 40 mm (1.57 in) unbonded in commercial work, where Anhydritec asks 40 mm (1.57 in) and 30 mm (1.18 in); the page's unbonded choice has no commercial line, so an unbonded floor at 30 mm (1.18 in) in commercial work is not flagged against ARDEX's figure. Nothing here designs a screed for vehicles, racking or other heavy loads, or for use as a wearing surface.
- Edge insulation strip, the membrane or separating layer, insulation boards, reinforcement, primer and bonding coat are separate items, as are the drying time before a floor covering and the moisture test that settles it.

## Sources

As the calculator cites them (sources checked 2026-10-05):

- Mineral Products Association, MPA Mortar Data Sheet 22, Screeds (Issue 3, October 2023), reporting BS 8204-1: a bonded screed at least 25 mm thick, with 40 mm normally specified to accommodate deviations in the base; an unbonded screed at least 50 mm, with 70 mm specified; a floating screed at least 75 mm, although 65 mm is normally considered satisfactory for domestic housing; nominal proportions by weight of cement to fine aggregate of 1:4, with a lower limit of 1:3 and an upper limit of 1:4.5 <https://www.mortar.org.uk/MPAMortar/media/Mortar/Publications/Datasheets/MPA-Mortar-Data-Sheet-22.pdf>
- Anhydritec Ltd, Gyvlon XTR free flowing calcium sulfate screed (NBS Source product page): minimum thickness bonded 25 mm, in contact with the substrate 30 mm, unbonded 30 mm, floating domestic 35 mm, floating commercial 40 mm, and 25 mm (30 mm nominal) cover to underfloor heating pipes; wet density 2,200 kg/m³, dry density 2,000 kg/m³ <https://source.thenbs.com/product/gyvlon-xtr/h52xGRH88QwDF6NLQdp1Gs>
- ARDEX UK, ARDEX A 70 GYPFLO product data sheet (July 2019), a bagged calcium sulphate flowing screed: minimum thickness floating 35 mm domestic and 45 mm commercial, unbonded 30 mm domestic and 40 mm commercial; a 25 kg bag covers approximately 0.4 m² at 35 mm — a second maker's figures, which is why the page names whose minimum it quotes <https://ardex.co.uk/wp-content/uploads/2023/02/ARDEX-A-70-GYPFLO.pdf>
- Sika, SikaScreed-40 Binder product data sheet (Version 04.01, February 2026): binder to sand by weight, 400 kg of binder per m³ of fresh mortar at 1:4 (4 bags of 20 kg to about 320 kg of aggregate in a 200 litre mixer), 340 kg at 1:5 and 290 kg at 1:6 — 2,000 kg of material as batched in each cubic metre at 1:4; the sheet does not say whether the aggregate is dry <https://deu.sika.com/content/dam/dms/deaddconst01/6/sikascreed-40-binder.pdf>
- Marshalls, Factory Batched Screed data sheet (13 April 2018), ready-to-lay retarded cement and sand screeds: coverage 45.0 m² a tonne at 10 mm, 18.0 at 25 mm, 9.0 at 50 mm and 6.0 at 75 mm, which is 0.45 m³ of laid screed a tonne; its traditional levelling screeds are sold in volume proportions, 1:3 for heavy duty, 1:4 for general purpose and 1:5 for light duty <https://media.marshalls.co.uk/image/upload/v1524652943/Factory_Batched_Datasheet_13_04_2018.pdf>
- ARDEX UK, ARDEX A 38 MIX product data sheet (January 2024), a pre-blended cement and graded sand screed in 25 kg bags: material requirement approximately 1.85 kg per m² per millimetre of thickness, about 0.5 m² at 25 mm a bag; laid bonded at 15–40 mm, unbonded from 40 mm, floating from 75 mm or 65 mm in lightly loaded or domestic locations <https://ardex.co.uk/wp-content/uploads/2023/02/ARDEX-A-38-MIX.pdf>
- QUIKRETE Sand/Topping Mix (No. 1103) data sheet (revised December 2022): for overlays less than 2 in (50 mm) thick and thick setting beds for floor tile; an 80 lb bag yields approximately 0.66 ft³ (18.7 L), and the Canadian 25 kg bag approximately 0.46 ft³ (13 L) <https://www.quikrete.com/PDFs/DATA_SHEET-Sand-Topping%20Mix%201103.pdf>
- QUIKRETE Portland Cement (No. 1124) data sheet (revised August 2022): sold in 94 lb (42.6 kg) bags, among other sizes <https://www.quikrete.com/PDFs/DATA_SHEET-PortlandCement.pdf>
- Holcim UK, Screed Calculator: "We recommend allowing for a 5% margin to cover additional needs" — the margin this page opens on <https://www.holcim.co.uk/digital-tools/screed-calculator>
- Heidelberg Materials UK, Sharp Sand product guide: a washed sand to BS EN 13139 for screeds, with a typical moisture content of 5% <https://www.heidelbergmaterials.co.uk/system/files/2025-11/user%20guide%20sharp%20sand.pdf>

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**How much sand and cement does a cubic metre of screed take?**

On Sika's figures for a 1 : 4 mix by weight, about 400 kg (882 lb) of cement and 1,600 kg (3,527 lb) of sand, 2,000 kg (4,409 lb) of material in all as batched, for each cubic metre (1.31 cubic yards) of screed laid: sixteen 25 kg (55 lb) bags of cement and 1.6 tonnes (1.76 US tons) of sand. A cubic yard takes about 306 kg (674 lb) of cement, a little over seven 94 lb (42.6 kg) sacks. The richer 1 : 3 mix puts a quarter of the weight into cement rather than a fifth. Adding the volumes of the cement and the sand gives far too much screed, because the cement fills the spaces between the grains; that is why the page works by weight.

**Why does a liquid screed take so much less material than sand and cement?**

Because it is laid thinner, not because it is lighter. Floating on insulation in a house, a cement and sand screed needs at least 65 mm (2.56 in) under BS 8204-1, while Anhydritec's calcium sulfate screed asks for 35 mm (1.38 in). On a 20 m² (215 sq ft) floor that is 1.3 m³ (1.70 cubic yards) against 0.7 m³ (0.92 cubic yards) before any margin. The two weigh much the same for their volume, about 2,200 kg/m³ (137 lb/ft³) wet for Gyvlon XTR and about the same for ARDEX's fresh A 38 MIX, so the saving in weight follows the saving in depth.

**How many bags of premixed screed will a floor need?**

The volume divided by what one bag makes. ARDEX puts its A 38 MIX at about 1.85 kg for each square metre at each millimetre of depth, about 115 lb for each cubic foot laid, so a 25 kg (55 lb) bag makes 13.5 L (0.48 ft³) and a cubic metre (1.31 cubic yards) takes 74 bags. A 4 by 3 m (13.1 by 9.8 ft) bathroom at 40 mm (1.57 in) is 0.48 m³ (17 ft³), 36 bags before any margin. In the US, QUIKRETE's Sand/Topping Mix, sold for toppings under 2 in (50 mm), yields about 0.66 ft³ (18.7 L) from an 80 lb (36.3 kg) bag.

**What does the 5% margin cover?**

Spillage, what is left in the mixer and barrow, and the floor around doorways and edges that takes a little more than its plan area. Five per cent is Holcim UK's recommendation on its own screed calculator. It does not cover a base that is out of level: a slab 10 mm (0.39 in) low across a floor laid at 75 mm (2.95 in) needs about 13% more screed, which is a depth to measure, not a margin to guess. Take levels across the floor and enter the average depth instead.

**Which depth should I enter: the minimum or the depth on the drawing?**

The depth the screed will actually be laid at, averaged over the floor. BS 8204-1 sets least depths, which must be reached at every point, and the specification usually calls for more so that the least depth survives an uneven base: a bonded screed has a least depth of 25 mm (0.98 in) and is normally specified at 40 mm (1.57 in). The thickness calculator works the specified depth out from the construction and the base; this page turns whatever depth goes down into material.

**Can I use this for a screed over underfloor heating?**

Not on its own. The pipes take up part of the depth and the screed has to cover them by a set amount, 25 mm (0.98 in) with 30 mm (1.18 in) nominal for Anhydritec's Gyvlon XTR, so the volume is the cover plus the pipe less what the pipe displaces. The heated screed calculator works that out; this page treats the floor as a solid layer of screed.

## Related calculators

- [Floor Screed Thickness Calculator — Bonded, Unbonded and Floating](https://craftquantities.com/calculators/materials-quantities/screed-thickness-calculator/)
- [Heated Screed Volume Calculator](https://craftquantities.com/calculators/materials-quantities/heated-screed-volume-calculator/)
- [Floor Screed Cubic Yards to Tons Calculator](https://craftquantities.com/calculators/materials-quantities/screed-cubic-yards-to-tons-calculator/)
- [Self-Leveling Underlayment (SLU) Volume Calculator](https://craftquantities.com/calculators/materials-quantities/self-leveling-underlayment-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/floor-screed-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/floor-screed-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `floor-screed-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/floor-screed-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/floor-screed-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.