# Fill Dirt Cubic Yards to Tons Calculator

> Convert a fill dirt volume in cubic yards into short tons for weight-based pricing and haulage.

Page: https://craftquantities.com/calculators/materials-quantities/fill-dirt-cubic-yards-to-tons-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.0, sources checked 2026-08-26, 2 published test vectors.

Approximate weight: 12.5 short tons for Fill Dirt volume 10, the page's opening figures. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Fill Dirt volume (yd³) | `cubicYards` | 10 | 10 | range 0–5000 |

- **Fill Dirt volume (yd³)**: The volume of fill dirt in cubic yards.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Approximate weight** | 12.5 short tons |
| Conversion factor applied | 1.25 short tons per yd³ |

### US customary

| Result | Value |
|---|---|
| **Approximate weight** | 12.5 short tons |
| Conversion factor applied | 1.25 short tons per yd³ |

## How it is worked out

About 1.25 short tons per cubic yard for typical fill; heavily variable with clay content and moisture. A planning figure, not a specification. Confirm the actual density with your supplier before ordering by weight.

The working the page shows, in order: Conversion factor applied; then approximate weight.

The method, derived in full:

- [Unit Conversion, Exactness and Rounding](https://craftquantities.com/methodology/unit-conversion-and-rounding/): Why most conversion factors carry no uncertainty at all, which ones hide a material assumption, and why converting a measurement can never make it more precise than it was.

What this calculation does not cover:

- The 1.25 short tons per cubic yard is a loose, as-tipped figure, so the volume you put into it has to be loose volume too. Take it from the heap after digging, or add a bulking allowance to the dimensions of the hole — not both. A measured heap already has the swell in it, and adding it a second time counts the same soil twice.
- Fill is dense enough that on a skip, a plant trailer or a light truck the weight limit binds well before the body is full — the container still looks like it has room in it when the hire terms say it is finished. A purpose-built tipper body runs closer to balanced, so check the converted tonnage against the rated payload and axle loading of the vehicle actually coming rather than against the capacity of its body.
- Haulage and disposal are billed off the weighbridge ticket taken on the day, not off this estimate. The density here is a typical middle figure for fill, so the ticket can land either side of it and neither the haulier nor the tip is bound by the number you started with. Use the conversion to size the job and to get a rate per ton agreed in advance, then treat the total as provisional until the tickets are in.

## Sources

As the calculator cites them (sources checked 2026-08-26):

- Typical bulk density used here: approximately 1.25 short tons per cubic yard
- Density varies with moisture, compaction and composition — the supplier's ticket weight governs

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**How much does fill compact?**

Enough to matter: placed in thin layers and properly compacted, loose fill loses a significant fraction of its delivered volume, a clay-rich fill more than a granular one. That loss is the point — uncompacted fill settles later and takes the structure above with it.

**Is all fill dirt the same?**

Not remotely. It is a catch-all term for excavated material, so clay content, stone content and organic matter all vary. Granular fill compacts predictably; clay-rich fill holds water and moves with the seasons.

**Can fill go under a slab?**

Only if it is suitable and properly compacted, and that is a design decision rather than a site one. Unsuitable or poorly compacted fill under a slab is a common cause of cracking and settlement.

## Related calculators

- [Fill Dirt Tons to Cubic Yards Calculator](https://craftquantities.com/calculators/materials-quantities/fill-dirt-tons-to-cubic-yards-calculator/)
- [Slope Cut-and-Fill Earthwork Balance Calculator](https://craftquantities.com/calculators/materials-quantities/cut-fill-earthwork-balance-calculator/)
- [Road Subgrade Excavation Truck Fleet Calculator](https://craftquantities.com/calculators/materials-quantities/subgrade-excavation-truck-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/fill-dirt-cubic-yards-to-tons-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/fill-dirt-cubic-yards-to-tons-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `fill-dirt-cubic-yards-to-tons-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/fill-dirt-cubic-yards-to-tons-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/fill-dirt-cubic-yards-to-tons-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.