# Excavation Sloping/Benching Setback Calculator

> Calculate the minimum horizontal setback for a sloped excavation wall, using OSHA's maximum allowable slope ratios by soil type.

Page: https://craftquantities.com/calculators/materials-quantities/excavation-sloping-setback-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.1, sources checked 2026-09-05, 2 published test vectors.

Minimum required horizontal setback: 10 ft for Excavation Depth 10 ft, the page's opening figures; on the metric page, 3 m gives 3 m. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Excavation Depth (Method Valid Only for ≤20 ft / 6 m) | `excavationDepth` | 3 m | 10 ft | mm, cm, m, in, ft, yd; range 0.01–6.096 m |
| OSHA Soil Classification (Per Competent Person's Field Testing) | `soilType` | Type B — Medium Stability (Max Slope 1:1) | Type B — Medium Stability (Max Slope 1:1) | `A`, `B`, `C` |

- **Excavation Depth (Method Valid Only for ≤20 ft / 6 m)**: The vertical depth of the excavation.
- **OSHA Soil Classification (Per Competent Person's Field Testing)**: The OSHA soil type classification (A, B, or C) determined by a competent person's field tests.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Minimum required horizontal setback** | 3 m |
| Slope ratio used (horizontal:vertical) | 1 :1 |

### US customary

| Result | Value |
|---|---|
| **Minimum required horizontal setback** | 10 ft |
| Slope ratio used (horizontal:vertical) | 1 :1 |

- Confidence: medium.

## How it is worked out

Soil classification (Type A/B/C) MUST be determined by a competent person using OSHA 29 CFR 1926 Subpart P Appendix A's field tests (not assumed) — misclassifying soil is a common cause of excavation collapse. This simple-slope method is only valid for excavations 20 ft (6 m) or less in depth; deeper excavations, benched configurations, or soil with seeping water require the full Subpart P tables or a registered professional engineer's design. Type A soil has a further exception (1/2:1 for short-term cuts ≤12 ft) not implemented here — use the more conservative 3/4:1 ratio shown unless your competent person confirms the exception applies.

The working the page shows, in order: Slope ratio used (horizontal:vertical); then minimum required horizontal setback.

The method, derived in full:

- [Temporary Works: Slings, Wind, Battering and Haul Cycles](https://craftquantities.com/methodology/temporary-works-and-site-safety/): Why a shallow sling angle doubles the tension in every leg, why a sheeted scaffold carries an order more wind than an open one, and why adding trucks to a short haul achieves nothing.

What this calculation does not cover:

- The three ratios held in the lookup — 0.75, 1.0 and 1.5 — are the steepest cuts permitted for each class, so the distance returned is the smallest setback allowed rather than a recommended one; laying the face back further is always acceptable and is frequently what the ground, the weather or the length of time the cut stays open actually calls for.
- A single letter drives the whole answer and it is applied from formation level right up to the crest, so ground that changes character partway up the face — a firm crust over soft alluvium, made ground sitting on undisturbed material, a granular lens between clays — is not handled, and a face like that is governed by its weakest band and not by the class picked here.
- Depth multiplied by ratio gives the horizontal run of one face measured out from the toe. It is not the width of the excavation at ground level, since no trench or base width is asked for, and it produces no spoil volume, no footprint of site consumed, and no allowance for the working room, plant standoff or access route you still need beyond the top of the slope.
- Only the depth and the soil class reach the arithmetic, so nothing in it represents how long the cut stays open or what goes on beside it. Rain, freeze-thaw, drying cracks along the crest, vibration from compaction or passing plant, and ground disturbed by earlier work all degrade a face that stood well when it was first dug, and the setback shown does not move.
- Taking the depth as one vertical dimension presumes the ground above the crest is level; where the site falls away behind the cut, rises toward it, or carries an embankment, an old excavation or a services trench above the face, the section being dug no longer matches the geometry these ratios were written for.

## Sources

As the calculator cites them (sources checked 2026-09-05):

- Per OSHA 29 CFR 1926 Subpart P, Appendix B (verified against the regulatory text), for excavations 20 feet or less in depth using a simple slope configuration, the maximum allowable slope ratios (horizontal:vertical) are: Type A soil 3/4:1 (0.75), Type B soil 1:1 (1.0), Type C soil 1 1/2:1 (1.5). Type A soil has a further exception allowing 1/2:1 for short-term excavations of 12 feet or less, not implemented in this simplified tool. Required horizontal setback = Excavation Depth × Slope Ratio.

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**What are OSHA's maximum allowable slope ratios by soil type?**

Per OSHA 29 CFR 1926 Subpart P, Appendix B, for excavations 20 feet or less in depth using a simple slope configuration: Type A soil 3/4:1 (0.75), Type B soil 1:1 (1.0), and Type C soil 1 1/2:1 (1.5), expressed as horizontal:vertical.

**Who decides the soil classification (Type A, B, or C)?**

Soil classification MUST be determined by a competent person using the field tests specified in OSHA 29 CFR 1926 Subpart P, Appendix A — it must never be assumed, since misclassifying soil is a common cause of excavation collapse.

**Does this method apply to any excavation depth?**

No — this simple-slope method is only valid for excavations 20 ft (6 m) or less in depth. Deeper excavations, benched configurations, or soil with seeping water require the full Subpart P tables or a registered professional engineer's design. Type A soil also has a further exception (1/2:1 for short-term cuts ≤12 ft) that is not implemented in this simplified tool.

## Related calculators

- [Excavation Shoring Lateral Active Soil Pressure Calculator (Rankine)](https://craftquantities.com/calculators/heavy-civil/shoring-active-pressure-calculator/)
- [Footing Soil Bearing Pressure Checker](https://craftquantities.com/calculators/materials-quantities/footing-bearing-pressure-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/excavation-sloping-setback-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/excavation-sloping-setback-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `excavation-sloping-setback-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/excavation-sloping-setback-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/excavation-sloping-setback-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.