# Dumpster/Skip Container Size Selector

> Determine the smallest standard dumpster/skip size that fits your estimated debris volume, accounting for irregular packing.

Page: https://craftquantities.com/calculators/materials-quantities/dumpster-size-selector-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.1.1, sources checked 2026-09-06, 2 published test vectors.

Recommended dumpster size: 20 yd³ for Estimated Debris Volume 15 yd³, the page's opening figures; on the metric page, 11.47 m³ gives 15.3 m³. Sources are cited below.

## Key facts

- Standard US roll-off dumpsters come in 10, 15, 20, 30 and 40 cubic yard sizes (about 7.6, 11.5, 15.3, 22.9 and 30.6 m³), offered by nearly all US haulers. (source: Standard US roll-off sizes: Required capacity = Estimated debris volume ÷ Packing Efficiency (irregular demolition/construction debris does not pack solidly, leaving air gaps — a packing efficiency of roughly 70-80% is a common construction-industry estimating rule of thumb). The calculator then selects the smallest standard US dumpster/skip size (10, 15, 20, 30, or 40 cubic yards — the standard sizes offered by nearly all US roll-off haulers) that meets or exceeds that required capacity.)
- One cubic yard is 0.7646 m³, so a 20-yard dumpster holds about 15.3 m³ and a 40-yard dumpster about 30.6 m³. ([NIST SI Guide, App. B.9](https://www.nist.gov/pml/special-publication-811/nist-guide-si-appendix-b-conversion-factors/nist-guide-si-appendix-b9): NIST Guide to the SI, Appendix B.9: factors for units listed by kind of quantity, National Institute of Standards and Technology)
- Irregular construction and demolition debris packs at roughly 70 to 80% of a container's volume, so the capacity needed is the loose debris volume divided by that packing efficiency. (source: Debris packing rule of thumb: Required capacity = Estimated debris volume ÷ Packing Efficiency (irregular demolition/construction debris does not pack solidly, leaving air gaps — a packing efficiency of roughly 70-80% is a common construction-industry estimating rule of thumb). The calculator then selects the smallest standard US dumpster/skip size (10, 15, 20, 30, or 40 cubic yards — the standard sizes offered by nearly all US roll-off haulers) that meets or exceeds that required capacity.)
- The US EPA's 2016 volume-to-weight factors weigh concrete debris at about 860 lb per cubic yard (510 kg/m³) and dirt and sand at 929 lb per cubic yard (551 kg/m³). ([EPA volume-to-weight factors, 2016](https://www.epa.gov/sites/default/files/2016-04/documents/volume_to_weight_conversion_factors_memorandum_04192016_508fnl.pdf): Volume-to-Weight Conversion Factors, US Environmental Protection Agency, April 2016)

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Estimated Debris Volume | `debrisVolume` | 11.4683 m³ | 15 yd³ | l, gal, m3, ft3, yd3; range 764.555–76455.5 L |
| Packing Efficiency (%, Irregular Debris ~70-80%) | `packingEfficiency` | 75 | 75 | range 40–100 |

- **Estimated Debris Volume**: The estimated loose volume of debris you need to haul away.
- **Packing Efficiency (%, Irregular Debris ~70-80%)**: How solidly the debris packs into the container — irregular debris leaves air gaps.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Recommended dumpster size** | 15.3 m³ |
| Required capacity accounting for packing | 15.29 m³ |

### US customary

| Result | Value |
|---|---|
| **Recommended dumpster size** | 20 yd³ |
| Required capacity accounting for packing | 20 yd³ |

- Confidence: medium.

## Formula with your numbers

1. **Divide by the packing efficiency**: 15 yd³ ÷ 75% = 20 yd³
2. **Take the next standard size up**: 20 yd³ → the smallest of 10, 15, 20, 30 and 40 yd³ (7.6 to 30.6 m³) that holds it = 20 yd³

Worked on the figures the page opens on; the page re-works each step on the reader's own.

## How to calculate Dumpster/Skip container size selector in 2 steps

1. **Divide by the packing efficiency**: Divide the loose debris volume by the packing efficiency for the container capacity it really takes, air gaps included.
2. **Take the next standard size up**: Pick the smallest standard US roll-off size, 10, 15, 20, 30 or 40 cubic yards, that meets or exceeds the required capacity.

## How it is worked out

Standard sizes and availability vary by hauler and region — confirm exact dimensions and weight limits with your specific waste hauler, since some materials (e.g. concrete, dirt, roofing) have separate weight-based limits regardless of the container's volume.

The working the page shows, in order: Required capacity accounting for packing; then recommended dumpster size.

The method, derived in full:

- [Interim Valuations, Variations and the Cost of Delay](https://craftquantities.com/methodology/payment-variations-and-delay/): Why a contractor finances the retention on every project, why a change costs far more late than early, and why a skip that looks half empty can already be over its weight limit.

What this calculation does not cover:

- The smallest box that holds the debris is not always the box the site can take. A 40-yard roll-off is around 22 ft (6.5 m) long and wants roughly 60 ft (18 m) of straight, level approach for the truck to winch it off, plus about 23 ft (7 m) of overhead clear of wires and branches; a 10 or a 15 will sit in a driveway where a 40 cannot even turn around. Check the drop before ordering the size the volume asked for.
- Volume here means level-full. Roll-offs are hauled with nothing above the top rail, because the load has to be sheeted and it has to be legal down the road, so a container heaped over the sides is either re-worked on site before it leaves or left behind. The packing efficiency you entered describes air trapped between the pieces, not the freeboard the driver needs above them.
- One box means one mixed load, and mixed is the expensive way to get rid of material. Clean concrete, clean fill, scrap metal and cardboard each go out at their own rate, sometimes at no charge or a rebate, and dropping any of them into the general box carries them all at the mixed construction-and-demolition rate. A diversion target usually means a second, smaller container rather than a single larger one.

## Sources

As the calculator cites them (sources checked 2026-09-06):

- Required capacity = Estimated debris volume ÷ Packing Efficiency (irregular demolition/construction debris does not pack solidly, leaving air gaps — a packing efficiency of roughly 70-80% is a common construction-industry estimating rule of thumb). The calculator then selects the smallest standard US dumpster/skip size (10, 15, 20, 30, or 40 cubic yards — the standard sizes offered by nearly all US roll-off haulers) that meets or exceeds that required capacity.

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Why does the required capacity exceed my actual debris volume?**

Irregular demolition/construction debris does not pack solidly into a container — it leaves air gaps between pieces. Dividing by a packing efficiency of roughly 70-80% accounts for that wasted space so the container you order actually has enough real capacity.

**Why are only certain sizes offered?**

This calculator selects from the standard US roll-off sizes — 10, 15, 20, 30, or 40 cubic yards — since these are the sizes offered by nearly all US waste haulers, picking the smallest one that meets or exceeds your required capacity.

**Is volume the only limit I need to worry about?**

No — always confirm weight limits with your specific hauler as well. Materials like concrete, dirt, or roofing shingles are dense enough to hit a container's weight limit long before it's visually full, regardless of its cubic-yard rating.

**What size dumpster holds 15 cubic yards of debris?**

A 20-yard dumpster: 15 yd³ (11.5 m³) of loose debris at the default 75% packing efficiency needs 20 yd³ of capacity, which is exactly a stock size, so the page does not step up to the 30. Pack it worse than 75% and the same debris needs the 30-yard box; check the drop space and the weight limit before ordering either.

**How big is a 20-yard dumpster in cubic metres?**

About 15.3 m³: a cubic yard is 0.7646 m³, so the five standard US sizes of 10, 15, 20, 30 and 40 yd³ hold about 7.6, 11.5, 15.3, 22.9 and 30.6 m³. On a metric page the answer is the same box, given in cubic metres; container sizes outside the US are set by each hire company's own list.

**What packing efficiency should I use?**

Roughly 70 to 80% for irregular demolition and construction debris, the rule of thumb the page cites, and the choice can move the box a size: 15 yd³ of debris needs 21.4 yd³ of capacity at 70%, a 30-yard dumpster, but only 18.75 yd³ at 80%, a 20-yard. Bulky broken drywall and framing lumber sit toward the low end; denser, more uniform material toward the high end.

**Can the dumpster be filled above the top?**

No: roll-offs are hauled with nothing above the top rail, because the load has to be sheeted and legal on the road, so a heaped container is re-worked on site or left behind. The capacity the page works out is level-full, and the packing efficiency is the air between the pieces, not the space the driver needs above them.

## Related calculators

- [Demolition Bulk Volume Swell Calculator](https://craftquantities.com/calculators/materials-quantities/demolition-bulk-volume-swell-calculator/)
- [Dumpster/Container Rental Duration Cost Calculator](https://craftquantities.com/calculators/materials-quantities/dumpster-rental-cost-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/dumpster-size-selector-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/dumpster-size-selector-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `dumpster-size-selector-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/dumpster-size-selector-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/dumpster-size-selector-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.