# Concrete Relative Yield Calculator (ASTM C138)

> Check whether a concrete batch actually produced its designed volume, per ASTM C138's relative yield check.

Page: https://craftquantities.com/calculators/materials-quantities/concrete-yield-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.1.1, sources checked 2026-09-03, 2 published test vectors.

Relative yield: 1.07 (ratio, target 1.0) for Total Batch Mass 5290 lb, Measured Unit Weight 146.71 pcf and Design Batch Volume 1.25 yd³, the page's opening figures; on the metric page, 2400 kg, 2350 kg/m³ and 1 m³ give 1.02 (ratio, target 1.0). Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Total Batch Mass | `totalBatchMassKg` | 2400 kg | 5290 lb | kg, lb, t, ton; range 100–50000 kg |
| Measured Unit Weight | `measuredUnitWeightKgM3` | 2350 kg/m³ | 146.706 pcf | kgm3, pcf, lbyd3; range 1500–3000 kg/m³ |
| Design Batch Volume | `designVolumeM3` | 1 m³ | 1.25 yd³ | l, gal, m3, ft3, yd3; range 100–20000 L |

- **Total Batch Mass**: The total mass of all ingredients in the batch.
- **Measured Unit Weight**: The batch's measured unit weight, from an ASTM C138 unit weight test.
- **Design Batch Volume**: The volume the mix design was intended to produce.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Relative yield** | 1.02 (ratio, target 1.0) |
| Actual yield | 1.02 m³ |

### US customary

| Result | Value |
|---|---|
| **Relative yield** | 1.07 (ratio, target 1.0) |
| Actual yield | 1.34 yd³ |

- Confidence: medium.

## How it is worked out

The batch produced MORE volume than designed — the mix may be under-yielding on materials relative to the design, or air content is higher than assumed.

The working the page shows, in order: Actual yield; then relative yield.

The method, derived in full:

- [Concrete Mix Design and Fresh-Concrete Behaviour](https://craftquantities.com/methodology/concrete-mix-and-fresh-behaviour/): Why a litre of water added on site costs strength permanently, why yield is the sum of absolute volumes rather than of loose ones, and why strength is a function of temperature and time together rather than of age.

What this calculation does not cover:

- A relative yield of 0.96 or 1.03 tells you the batch missed its design volume; it does not tell you why. Air content, aggregate moisture, scale calibration and admixture dosage all move yield, and none of them are inputs here — this flags the symptom and leaves the diagnosis to the air meter, the moisture test and the batch records.
- This is a volume check, not an acceptance test. A batch can land at 1.00 relative yield and still fail its specified strength, slump or air content, and none of those are evaluated here.
- The total batch mass is taken as entered and never verified. It has to be the mass actually batched, with free moisture on the aggregates included — enter the mix design's SSD proportions instead of the batch ticket's real weights and the yield error is invisible to this calculation.
- One unit weight sample, one batch. Yield varies within a load and between loads, and nothing here allows for that variation, for the calibration of the measure the sample was struck off in, or for how well the sample was consolidated.
- The ±2% window used to pass or fail the result is a common working rule, not an acceptance clause — ASTM C138 gives the yield computation, not a tolerance. Whether you were delivered the volume you paid for is settled under the delivery tolerance in the purchase specification, not by this ratio.

A professional must decide:

- Structure: sizes, thicknesses, spans, reinforcement and bearing are a structural engineer's or the building official's decision. This is a quantity, not a design.

## Sources

As the calculator cites them (sources checked 2026-09-03):

- ASTM C138 relative yield: actual yield = total batch mass / measured unit weight; relative yield = actual yield / design volume (should be close to 1.0)

The site's pages for the documents these name:

- [ASTM C138](https://craftquantities.com/standards/astm/astm-c138/)

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Why would a batch's actual yield differ from its design volume?**

Aggregate moisture content, entrained air, and small batching inaccuracies all shift the real volume a fixed mass of ingredients produces — relative yield catches this directly instead of relying on assumptions.

**What if my relative yield is consistently off?**

A consistent bias (always high or always low) suggests a systematic issue — recheck aggregate moisture testing, scale calibration, or air content — rather than a one-off measurement error.

**Does under-yield mean I'm wasting material?**

The opposite — under-yield means the batch produced LESS volume than planned for the same material cost, so you'll need more batches (and more total material) to finish the same job than budgeted.

## Related calculators

- [Concrete Unit Weight (Density) Calculator (ASTM C138)](https://craftquantities.com/calculators/materials-quantities/concrete-unit-weight-calculator/)
- [Concrete Trial Batch Yield Adjustment Calculator](https://craftquantities.com/calculators/materials-quantities/trial-batch-yield-adjustment-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/concrete-yield-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/concrete-yield-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `concrete-yield-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/concrete-yield-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/concrete-yield-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.