> Space poker (immersion) vibrator insertions so their radii overlap by your margin, with the insertions each square metre or square foot of lift takes.

Page: https://craftquantities.com/calculators/materials-quantities/concrete-vibrator-insertion-spacing-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.0, sources checked 2026-08-30, 2 published test vectors.

Insertion spacing: 14.6 in for Radius of Action of the Head 9.75 in, the page's opening figures; on the metric page, 25 cm gives 375 mm. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Radius of Action of the Head | `radiusOfAction` | 25 cm | 9.75 in | mm, cm, m, in, ft, yd; range 0.05–0.6 m |
| Required Overlap of Adjacent Radii (%) | `overlapPercent` | 25 | 25 | range 0–60 |
| Depth of Each Placement Layer | `layerDepth` | 40 cm | 16 in | mm, cm, m, in, ft, yd; range 0.15–0.9 m |
| Penetration into the Layer Below | `penetrationIntoPreviousLayer` | 15 cm | 6 in | mm, cm, m, in, ft, yd; range 0.05–0.3 m |

- **Radius of Action of the Head**: The distance from the head over which the concrete is actually consolidated.
- **Required Overlap of Adjacent Radii (%)**: How much the circles of action are made to overlap rather than merely touch.
- **Depth of Each Placement Layer**: The thickness of concrete placed in one pass before the next layer goes on.
- **Penetration into the Layer Below**: How far the head is driven into the previous layer to knit the two together.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Insertion spacing** | 375 mm |
| Insertions needed per unit of lift area | 7.11 points/m² |
| Overlap achieved between adjacent circles of action | 125 mm |
| Minimum vibrating length to reach the layer below | 550 mm |
| Ground consolidated by one insertion | 0.14 m² |

### US customary

| Result | Value |
|---|---|
| **Insertion spacing** | 14.6 in |
| Insertions needed per unit of lift area | 0.67 points/sq ft |
| Overlap achieved between adjacent circles of action | 4.87 in |
| Minimum vibrating length to reach the layer below | 22 in |
| Ground consolidated by one insertion | 1.49 sq ft |

- Confidence: medium.

## How it is worked out

The geometry is exact for the radius entered, and the radius is the uncertain part. Published figures assume a workable mix and open reinforcement; in congested sections the working radius falls, which tightens the spacing this calculation returns.

The working the page shows, in order: Insertions needed per unit of lift area; Overlap achieved between adjacent circles of action; Minimum vibrating length to reach the layer below; Ground consolidated by one insertion; then insertion spacing.

The method, derived in full:

- [Concrete Mix Design and Fresh-Concrete Behaviour](https://craftquantities.com/methodology/concrete-mix-and-fresh-behaviour/): Why a litre of water added on site costs strength permanently, why yield is the sum of absolute volumes rather than of loose ones, and why strength is a function of temperature and time together rather than of age.

What this calculation does not cover:

- Assumes a square insertion grid. A wall is a line of insertions rather than a grid, so use the spacing and ignore the per-area figure there.
- Says nothing about duration. Insertion spacing decides where the poker goes; how long it stays is judged from the surface levelling, bubbles ceasing and a mortar sheen appearing, and over-vibration is as damaging as under-vibration.
- Excludes form-face treatment entirely. Vibrating against formwork or reinforcement puts energy where it is not wanted and can shift bars already tied to tolerance.

A professional must decide:

- Structure: sizes, thicknesses, spans, reinforcement and bearing are a structural engineer's or the building official's decision. This is a quantity, not a design.

## Sources

As the calculator cites them (sources checked 2026-08-30):

- ACI 309R, Guide for Consolidation of Concrete — consolidation technique is vertical insertion under the head's own weight, a short hold, slow withdrawal, and insertion points spaced so that their radii of action overlap
- Spacing = 2 × radius of action × (1 − overlap fraction); insertion points per unit area = 1 ÷ spacing², for a square insertion grid
- The radius of action is a property of the head and the mix rather than a constant — it is published by the vibrator manufacturer for the head diameter and frequency, and it shortens in a stiff or heavily reinforced mix

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Why space insertions from the radius rather than from the head diameter?**

Because the head diameter tells you how big the poker is, and the radius of action tells you how far its effect reaches, which are different questions with different answers in different mixes. The same head has a smaller working radius in a stiff, low-slump concrete than in a flowing one, so a spacing rule tied to the hardware alone stops being true the moment the mix changes.

**Can I move concrete sideways with the vibrator to save an insertion?**

No, and it is one of the few genuinely absolute rules in placing. Dragging a poker sideways floats mortar ahead of the stone and leaves an aggregate-rich pocket behind it — a defect the finishers will never see and a core drill will find immediately. Rakes, come-alongs and shovels move concrete; the vibrator consolidates what is already where it should be.

**What happens if the insertions are too close together?**

Over-vibration, which fails in the opposite direction from honeycombing and is harder to spot. Excess energy drives coarse aggregate downward, brings a laitance layer to the surface, and in air-entrained concrete collapses the bubble structure the durability specification was written around. The mix then passes every test at the plant and underperforms in the wall.

**Does the layer depth change the spacing?**

Not the spacing itself, which is set by the radius and the overlap you choose. What the layer depth decides is whether the head can do its job at all: it has to reach through the fresh layer and into the one below, so the vibrating length of the head sets the maximum layer you may place. The breakdown reports that minimum length so the two decisions are made together rather than one at a time.

## Related calculators

- [Concrete Pump Line Friction Loss Calculator](https://craftquantities.com/calculators/materials-quantities/concrete-pump-friction-loss-calculator/)
- [Concrete Slump Flow Test Calculator (ASTM C1611)](https://craftquantities.com/calculators/materials-quantities/concrete-slump-flow-calculator/)
- [ACI 347 Wall Formwork Rate-of-Placement Pressure Calculator](https://craftquantities.com/calculators/materials-quantities/wall-formwork-pressure-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/concrete-vibrator-insertion-spacing-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/concrete-vibrator-insertion-spacing-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `concrete-vibrator-insertion-spacing-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/concrete-vibrator-insertion-spacing-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/concrete-vibrator-insertion-spacing-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.