# Concrete Mix Temperature and Ice Substitution Calculator

> Predict ready-mix temperature at the plant from each ingredient's mass and temperature, then find the ice or chilled water that brings it to target.

Page: https://craftquantities.com/calculators/materials-quantities/concrete-mix-temperature-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.1, sources checked 2026-09-06, 2 published test vectors.

Predicted concrete temperature: 81.5 °F for Cement Mass in the Batch 705 lb, Cement Temperature 104 °F and Total Aggregate Mass in the Batch 4080 lb, the page's opening figures; on the metric page, 320 kg, 40 °C and 1850 kg give 27.5 °C. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Cement Mass in the Batch | `cementMass` | 320 kg | 705 lb | kg, lb, t, ton; range 50–700 kg |
| Cement Temperature | `cementTemp` | 40 °C | 104 °F | c, f, k; range 0–90 °C |
| Total Aggregate Mass in the Batch | `aggregateMass` | 1850 kg | 4080 lb | kg, lb, t, ton; range 500–3000 kg |
| Aggregate Temperature | `aggregateTemp` | 28 °C | 82.4 °F | c, f, k; range -10–60 °C |
| Free Moisture on the Aggregate (% of dry mass) | `freeMoisturePercent` | 3 | 3 | range 0–10 |
| Batch Water Added at the Plant | `mixWaterMass` | 150 kg | 330 lb | kg, lb, t, ton; range 20–300 kg |
| Batch Water Temperature | `mixWaterTemp` | 20 °C | 68 °F | c, f, k; range 0–80 °C |
| Share of the Batch Water Weighed Out as Ice (%) | `icePercent` | 0 | 0 | range 0–75 |
| Target Concrete Temperature | `targetTemp` | 30 °C | 86 °F | c, f, k; range 5–35 °C |

- **Cement Mass in the Batch**: Cementitious content of one batch, as batched.
- **Cement Temperature**: Temperature of the cement as it leaves the silo.
- **Total Aggregate Mass in the Batch**: Coarse and fine aggregate together, dry, for the same batch.
- **Aggregate Temperature**: Temperature of the stockpile at the depth the loader is digging.
- **Free Moisture on the Aggregate (% of dry mass)**: Surface water carried on the stone, as a percentage of its dry mass.
- **Batch Water Added at the Plant**: Water added at the plant, excluding whatever the aggregate brought with it.
- **Batch Water Temperature**: Temperature of the liquid water as batched.
- **Share of the Batch Water Weighed Out as Ice (%)**: How much of the batch water is charged as flaked or crushed ice instead of liquid.
- **Target Concrete Temperature**: The as-delivered temperature the specification allows or requires.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Predicted concrete temperature** | 27.5 °C |
| Same batch with no ice substituted | 27.48 °C |
| Difference from the target | -2.52 Δ°C |
| Ice charged | 0 kg |
| Liquid water charged | 150 kg |
| Free moisture riding on the aggregate | 55.5 kg |
| Ice that would reach the target on its own | 0 kg |
| Water temperature that would reach the target | 31.47 °C |

### US customary

| Result | Value |
|---|---|
| **Predicted concrete temperature** | 81.5 °F |
| Same batch with no ice substituted | 81.47 °F |
| Difference from the target | -4.53 Δ°F |
| Ice charged | 0 lb |
| Liquid water charged | 330 lb |
| Free moisture riding on the aggregate | 122.4 lb |
| Ice that would reach the target on its own | 0 lb |
| Water temperature that would reach the target | 88.67 °F |

- Confidence: medium.

## How it is worked out

A prediction of the mix temperature leaving the plant. Haul time, drum friction and sun on the barrel all add to it before discharge, and none of them is in this balance.

The working the page shows, in order: Same batch with no ice substituted; Difference from the target; Ice charged; Liquid water charged; Free moisture riding on the aggregate; Ice that would reach the target on its own; Water temperature that would reach the target; then predicted concrete temperature.

The method, derived in full:

- [Concrete Mix Design and Fresh-Concrete Behaviour](https://craftquantities.com/methodology/concrete-mix-and-fresh-behaviour/): Why a litre of water added on site costs strength permanently, why yield is the sum of absolute volumes rather than of loose ones, and why strength is a function of temperature and time together rather than of age.

What this calculation does not cover:

- Predicts the temperature at the mixer, not at the point of placement.
- Aggregate temperature dominates the answer and is the input most often estimated rather than measured.
- Cement and aggregate are treated with one shared specific heat, as ACI's equation does.
- Ice must be fully melted before discharge; beyond roughly three quarters of the batch water that stops being reliable.

A professional must decide:

- Structure: sizes, thicknesses, spans, reinforcement and bearing are a structural engineer's or the building official's decision. This is a quantity, not a design.

## Sources

As the calculator cites them (sources checked 2026-09-06):

- ACI 305R Guide to Hot Weather Concreting mixing-temperature equation: T = \[0.22(Ta·Ma + Tc·Mc) + Tw·Mw + Twa·Mwa\] / \[0.22(Ma + Mc) + Mw + Mwa\], where 0.22 is the ratio of the specific heat of cement and aggregate to that of water, Mwa is the free moisture riding on the aggregate and Twa its temperature
- Ice substitution, from the same equation: subtract 79.6 x Mi from the numerator and add Mi to the denominator, working in °C and kilograms. 79.6 is the latent heat of fusion of ice divided by the specific heat of water, with the ice taken as being at 0 °C
- ACI 305.1 Specification for Hot Weather Concreting — the specification that sets a maximum as-delivered temperature and the protection measures that go with it
- ACI 306.1 Specification for Cold Weather Concreting — the minimum as-placed temperatures that govern the other end of the target range, and the reason heated water is a substitution as legitimate as ice

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Why does the aggregate matter so much more than the cement?**

Mass. Aggregate is roughly three quarters of a batch and cement about a seventh, and the two share the same specific heat in this equation, so the stone carries about five times the heat the cement does. Shading a stockpile is worth more than anything you can do to a silo.

**How much cooling does ice actually buy?**

Melting one kilogram of ice absorbs about as much heat as cooling one kilogram of water by eighty Celsius (144 Fahrenheit) degrees. That is why replacing part of the batch water with ice is so much more effective than chilling the same water, and why the ice must be fully melted before the truck discharges.

**Is this the temperature at the pour?**

No. It is the temperature at the mixer. Drum friction, ambient heat and sun on the barrel all add to it during the haul, and a long delivery in summer commonly gains a couple of degrees. Take that rise off your target before comparing against a specification limit measured at discharge.

**Can I use this to warm a mix in winter as well?**

Yes — the same balance runs in both directions. Enter heated water and the predicted temperature rises; the page reports the water temperature that would reach your target, which for cold-weather work is a minimum rather than a maximum. Watch the cement contact temperature separately, because very hot water meeting cement directly can flash set.

## Related calculators

- [Concrete Evaporation Rate Calculator](https://craftquantities.com/calculators/materials-quantities/concrete-evaporation-calculator/)
- [Concrete Curing Blanket Calculator](https://craftquantities.com/calculators/materials-quantities/concrete-curing-blanket-calculator/)
- [Concrete Mix Ratio Calculator](https://craftquantities.com/calculators/materials-quantities/concrete-mix-ratio-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/concrete-mix-temperature-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/concrete-mix-temperature-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `concrete-mix-temperature-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/concrete-mix-temperature-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/concrete-mix-temperature-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.