# Concrete Mix Ratio Calculator

> Break a cement:sand:gravel mix ratio (like 1:2:3) into the actual volumes and cement bags needed for hand-mixed concrete.

Page: https://craftquantities.com/calculators/materials-quantities/concrete-mix-ratio-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.2.1, sources checked 2026-09-05, 2 published test vectors.

Cement bags needed: 5 x 94 lb cement bags for Loose Dry Batch Volume 27 ft³, the page's opening figures; on the metric page, 0.76 m³ gives 8 x 25 kg cement bags. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Loose Dry Batch Volume | `mixVolume` | 0.76455 m³ | 27 ft³ | l, gal, m3, ft3, yd3; range 0.1–14200 L |
| Cement Parts | `cementParts` | 1 | 1 | range 1–5 |
| Sand Parts | `sandParts` | 2 | 2 | range 1–6 |
| Gravel Parts | `gravelParts` | 3 | 3 | range 1–8 |

- **Loose Dry Batch Volume**: The volume of loose dry material the ratio divides up — not the volume of finished concrete it makes.
- **Cement Parts**: The cement portion of the mix ratio.
- **Sand Parts**: The sand portion of the mix ratio.
- **Gravel Parts**: The gravel (coarse aggregate) portion of the mix ratio.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Cement bags needed** | 8 x 25 kg cement bags |
| Sand needed | 0.25 m³ |
| Gravel needed | 0.38 m³ |

### US customary

| Result | Value |
|---|---|
| **Cement bags needed** | 5 x 94 lb cement bags |
| Sand needed | 9 ft³ |
| Gravel needed | 13.5 ft³ |

- Confidence: medium.

## How it is worked out

These are mixing proportions, not an order quantity. The figures describe a batch of loose dry cement, sand and gravel measuring the volume entered, and mixed and placed that batch fills roughly two thirds of that volume — so batch about half again to fill the whole of it. For structural work, verify your mix design meets the required strength for its application.

The working the page shows, in order: Sand needed; Gravel needed; then cement bags needed.

The method, derived in full:

- [Volume from Geometry, and the Order That Follows](https://craftquantities.com/methodology/volume-from-geometry/): Why the depth carries almost all the risk in a volume, why an excavation holds far more than its plan area suggests, and why a bag's yield is not its weight divided by a density.

What this calculation does not cover:

- No bulking allowance is built in. The ratio divides the figure you type, so the three components add up to exactly it, and what comes out of the mixer is around a third smaller — the mix closes its own voids, fine material taking up the gaps in the coarse and paste taking up the rest. Scaling the input by about one and a half is the usual working allowance for hand-mixed concrete, and it is left to you on purpose: the true factor moves with the richness of the mix and with the water it takes, and water is not an input here, so a single built-in constant would run high on a rich mix and low on a lean one.
- This is a volume split, not a mix design. It does not check that the ratio you entered reaches a specified strength, exposure class or durability requirement, and it does not replace a designed mix with trial batching and cube or cylinder testing on structural, reinforced or inspected work.
- Water is not in the output. A volume ratio says nothing about the water-cement ratio, which is what actually governs strength and durability, and nothing about air entrainment, plasticiser or any other admixture dosage.
- The split ignores everything about the aggregate except its share of the ratio — grading, maximum size, the moisture already in the pile, and sand bulking, which can swell damp sand enough that a measured bucket carries noticeably less sand than a dry one. Volume batching on site is also less repeatable than weigh-batching for the same reason.
- The bag count comes from a standard loose bulk density for portland cement, not from a weigh-batch of the cement you have, and it rounds up to whole bags with no allowance for spillage or part-used bags. Mixes with no coarse aggregate — mortars, screeds, renders — are outside what this page accepts, because it requires at least one part gravel.

A professional must decide:

- This is a volume split, not a mix design. It does not check that the ratio you entered reaches a specified strength, exposure class or durability requirement, and it does not replace a designed mix with trial batching and cube or cylinder testing on structural, reinforced or inspected work.
- Structure: sizes, thicknesses, spans, reinforcement and bearing are a structural engineer's or the building official's decision. This is a quantity, not a design.

## Sources

As the calculator cites them (sources checked 2026-09-05):

- Each component's loose volume = batch volume x (its ratio parts / total ratio parts), with no allowance applied for the volume a batch loses on mixing; a 94 lb bag of portland cement is commonly estimated at about 1 cubic ft loose volume, which is a bulk density of about 1,506 kg/m³ — putting the 25 kg bag stocked in metric markets at about 16.6 litres

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Why hand-mix instead of using ready-mix concrete?**

Hand-mixing from raw cement, sand, and gravel is mainly practical for small jobs where a ready-mix truck's minimum order doesn't make sense — for anything beyond a few cubic yards, ready-mix delivery (see the Concrete Calculator) is usually more practical and consistent.

**What does the mix ratio actually control?**

The proportion of cement (the binder) to aggregate (sand and gravel, the bulk filler) controls strength and workability — more cement generally means stronger but more expensive and harder-to-work concrete.

**Is 1:2:3 the only ratio used?**

No — it's a common general-purpose ratio, but structural applications sometimes use richer mixes (like 1:1.5:3) for higher strength, and non-structural fill or bedding can use leaner mixes. Check the requirements for your specific application.

## Related calculators

- [Concrete Calculator](https://craftquantities.com/calculators/materials-quantities/concrete-calculator/)
- [Concrete Bag Calculator](https://craftquantities.com/calculators/materials-quantities/concrete-bag-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/concrete-mix-ratio-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/concrete-mix-ratio-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `concrete-mix-ratio-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/concrete-mix-ratio-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/concrete-mix-ratio-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.