# Concrete Calculator

> Estimate how much concrete a slab needs — in cubic yards or cubic metres, and as a count of premix bags.

Page: https://craftquantities.com/calculators/materials-quantities/concrete-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.2.0, sources checked 2026-10-31, 23 published test vectors.

Estimated concrete needed: 1.36 yd³ for Slab Length 10 ft, Slab Width 10 ft and Slab Thickness 4 in, the page's opening figures; on the metric page, 3 m, 3 m and 10 cm give 0.99 m³. Sources are cited below.

## Key facts

- A slab's volume in cubic yards is length × width × thickness, all in feet, divided by 27; one cubic yard is 27 cubic feet, 0.7646 m³. ([NIST SI Guide, App. B.9](https://www.nist.gov/pml/special-publication-811/nist-guide-si-appendix-b-conversion-factors/nist-guide-si-appendix-b9): NIST Guide to the SI, Appendix B.9: factors for units listed by kind of quantity, National Institute of Standards and Technology)
- Premixed concrete yields about 0.0075 cubic feet per pound of dry mix: about 0.6 ft³ (17 L) from an 80 lb bag, and about 9.4, 11.7 and 14.0 litres from 20, 25 and 30 kg bags. (source: Published premix bag yields: An 80 lb bag of pre-mixed concrete yields approximately 0.6 cubic feet once mixed; 60 lb about 0.45 and 40 lb about 0.30 cubic feet — 0.0075 cubic feet per pound of dry mix, which puts 20, 25 and 30 kg bags at about 9.4, 11.7 and 14.0 litres)
- Loose crushed stone for a slab's sub-base weighs about 1,550 kg/m³ (97 lb/ft³), and rolling it to its compacted depth commonly takes 15 to 25% more loose stone. ([Craft Quantities bulk-density table](https://craftquantities.com/reference/materials/bulk-densities/): Sub-base stone weighed loose at 1,550 kg/m³ (97 lb/ft³), crushed stone in the site's bulk-density table; compaction allowances of 15 to 25% are common supplier and specification practice for crushed stone and hardcore)
- Quikrete's Concrete Mix data sheet says to cut control joints 1 in (25 mm) deep into a slab every 6 to 8 ft (1.8 to 2.4 m). ([Quikrete 1101 data sheet](https://www.quikrete.com/pdfs/data_sheet-concrete%20mix%201101.pdf): QUIKRETE Concrete Mix No. 1101 data sheet, The Quikrete Companies)

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Slab Length | `slabLength` | 3 m | 10 ft | mm, cm, m, in, ft, yd; range 0.01–50 m |
| Slab Width | `slabWidth` | 3 m | 10 ft | mm, cm, m, in, ft, yd; range 0.01–50 m |
| Slab Thickness | `slabThickness` | 10 cm | 4 in | mm, cm, m, in, ft, yd; range 0.01–1 m |
| Waste Factor (%) | `wasteFactorPercent` | 10 | 10 | range 0–25 |
| Sub-base depth (0 for none) | `subBaseDepth` | 10 cm | 4 in | mm, cm, m, in, ft, yd; range 0–0.6 m |
| Sub-base compaction allowance (%) | `subBaseCompaction` | 20 | 20 | range 0–50 |
| Form board depth (its face width) | `formBoardDepth` | 150 mm | 6 in | mm, cm, m, in, ft, yd; range 0.05–0.4 m |
| Reinforcement to count | `reinforcement` | None (concrete only) | None (concrete only) | `none`, `mesh`, `rebar` |
| Mesh sheet size | `meshSheet` | 3.05 × 1.52 m (10 × 5 ft), US and Canada | 10 × 5 ft (3.05 × 1.52 m), US and Canada | `4.8x2.4`, `6x2.4`, `3.6x2`, `10x5ft`, `15x8ft`, `20x8ft` |
| Mesh lap at each join | `meshLap` | 200 mm | 7.75 in | mm, cm, m, in, ft, yd; range 0–0.6 m |
| Bar size | `barSize` | #4 (12.7 mm) | #4 (1/2 in) | `0.008`, `0.009525`, `0.01`, `0.0113`, `0.012`, `0.0127`, `0.015875`, `0.016`, `0.01905`, `0.0195`, `0.02`, `0.022225`, `0.025`, `0.0252`, `0.0254` |
| Bar spacing, both ways | `barSpacing` | 300 mm | 11.75 in | mm, cm, m, in, ft, yd; range 0.05–1 m |
| Cover to the bars at the edges | `barCover` | 50 mm | 2 in | mm, cm, m, in, ft, yd; range 0–0.15 m |
| Lap length at each splice | `barLap` | 500 mm | 20 in | mm, cm, m, in, ft, yd; range 0–2 m |

- **Slab Length**: The length of the slab or footing.
- **Slab Width**: The width of the slab or footing.
- **Slab Thickness**: How deep the concrete pour is.
- **Waste Factor (%)**: Extra concrete for spillage, uneven subgrade, and forming imprecision.
- **Sub-base depth (0 for none)**: The compacted granular layer under the slab, over the same plan area.
- **Sub-base compaction allowance (%)**: How much more loose stone it takes to roll down to the compacted depth.
- **Form board depth (its face width)**: The face width of the boards you form the edge with.
- **Reinforcement to count**: Count the mesh or the bars you have chosen; nothing here chooses them.
- **Mesh sheet size**: The sheet your supplier sells.
- **Mesh lap at each join**: How far one sheet overlaps the next.
- **Bar size**: The bar your drawing calls for.
- **Bar spacing, both ways**: Centre to centre, the same each way.
- **Cover to the bars at the edges**: Concrete between the slab's edge and the steel.
- **Lap length at each splice**: Overlap where a bar longer than one stock length is joined.

`meshSheet` applies only when `reinforcement` is `mesh`.
`meshLap` applies only when `reinforcement` is `mesh`.
`barSize` applies only when `reinforcement` is `rebar`.
`barSpacing` applies only when `reinforcement` is `rebar`.
`barCover` applies only when `reinforcement` is `rebar`.
`barLap` applies only when `reinforcement` is `rebar`.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Estimated concrete needed** | 0.99 m³ |
| Volume (no waste) | 0.9 m³ |
| Volume with waste factor | 0.99 m³ |
| Cubic feet | 34.96 ft³ |
| 80 lb bags needed | 59 bags |
| Smaller premix bags: 60 lb, or 25 kg in metric markets | 85 bags |
| Smallest premix bags: 40 lb, or 20 kg in metric markets | 106 bags |
| Edge forms, the run round the slab | 12 m |
| Edge form face, run by thickness | 1.2 m² |
| Form boards stacked to the slab's depth | 1 row |
| Form boards to buy, whole boards each side | 4 x 4.8 m boards |
| Sub-base under the slab, compacted | 0.9 m³ |
| Sub-base stone to order, loose | 1.08 m³ |
| Sub-base stone by weight, loose crushed stone | 1.67 t |

### US customary

| Result | Value |
|---|---|
| **Estimated concrete needed** | 1.36 yd³ |
| Volume (no waste) | 1.23 yd³ |
| Volume with waste factor | 1.36 yd³ |
| Cubic feet | 36.67 ft³ |
| 80 lb bags needed | 62 bags |
| Smaller premix bags: 60 lb, or 25 kg in metric markets | 82 bags |
| Smallest premix bags: 40 lb, or 20 kg in metric markets | 123 bags |
| Edge forms, the run round the slab | 40 ft |
| Edge form face, run by thickness | 13.33 sq ft |
| Form boards stacked to the slab's depth | 1 row |
| Form boards to buy, whole boards each side | 4 x 12 ft boards |
| Sub-base under the slab, compacted | 1.23 yd³ |
| Sub-base stone to order, loose | 1.48 yd³ |
| Sub-base stone by weight, loose crushed stone | 1.94 tons |

## Formula with your numbers

1. **Multiply the three dimensions**: 10 ft × 10 ft × 4 in = 1.23 yd³
2. **Add the waste allowance**: 1.23 yd³ + 10% waste = 1.36 yd³

Worked on the figures the page opens on; the page re-works each step on the reader's own.

## How to calculate concrete in 2 steps

1. **Multiply the three dimensions**: Measure the slab's length, width and thickness, put all three in one unit, and multiply them for the volume.
2. **Add the waste allowance**: Add the waste percentage for spillage, an uneven sub-base and the concrete left in the chute, and order the total in cubic yards or cubic metres, or in bags for a small pour.

## Concrete for common slab sizes

Page defaults, not your figures above.

| Slab (length × width) | Estimated concrete needed |
|---|---|
| 10 × 10 ft (3.05 × 3.05 m) | 1.36 yd³ (1.04 m³) |
| 12 × 12 ft (3.66 × 3.66 m) | 1.96 yd³ (1.5 m³) |
| 10 × 20 ft (3.05 × 6.1 m) | 2.72 yd³ (2.08 m³) |
| 16 × 16 ft (4.88 × 4.88 m) | 3.48 yd³ (2.66 m³) |
| 20 × 20 ft (6.1 × 6.1 m) | 5.43 yd³ (4.15 m³) |
| 24 × 24 ft (7.32 × 7.32 m) | 7.82 yd³ (5.98 m³) |
| 30 × 30 ft (9.14 × 9.14 m) | 12.2 yd³ (9.34 m³) |
| 3 × 3 m (9.84 × 9.84 ft) | 0.99 m³ (1.29 yd³) |
| 4 × 4 m (13.12 × 13.12 ft) | 1.76 m³ (2.3 yd³) |
| 5 × 5 m (16.4 × 16.4 ft) | 2.75 m³ (3.6 yd³) |
| 6 × 6 m (19.69 × 19.69 ft) | 3.96 m³ (5.18 yd³) |
| 10 × 10 m (32.81 × 32.81 ft) | 11 m³ (14.4 yd³) |

## How it is worked out

The working the page shows, in order: Volume (no waste); Volume with waste factor; Cubic feet; 80 lb bags needed; Smaller premix bags: 60 lb, or 25 kg in metric markets; Smallest premix bags: 40 lb, or 20 kg in metric markets; Edge forms, the run round the slab; Edge form face, run by thickness; Form boards stacked to the slab's depth; Form boards to buy, whole boards each side; Sub-base under the slab, compacted; Sub-base stone to order, loose; Sub-base stone by weight, loose crushed stone; then estimated concrete needed.

The method, derived in full:

- [Quantity, Waste and Rounding](https://craftquantities.com/methodology/quantity-waste-and-rounding/): Why a material count is a ceiling function rather than a division, and why the waste factor — not the geometry — carries the risk.

The equations it runs, in the open formula library:

- Formula: [V = L × W × D](https://craftquantities.com/formulas/volume-from-geometry/#rectangular-prism-volume)

What this calculation does not cover:

- Geometry is one rectangular prism: length x width x a single uniform thickness. Thickened edges, integral footings, haunches, steps, curbs and any non-rectangular outline are not in the figure, and nothing is subtracted for block-outs or openings. Take those off as separate volumes and add them.
- It assumes a flat, compacted subgrade sitting at exactly the depth you entered. Ruts, soft spots, over-excavation and a base that dishes in the middle all take concrete the geometry never sees, and a flat waste percentage is not a measurement of that. On a rough base, check depth across the whole pour rather than trusting the allowance.
- This is a volume take-off, not a structural decision. It accepts whatever thickness you type without sizing it, and says nothing about mix strength, aggregate size, air entrainment or fibre. Mesh and bars are counted only as you specify them — sheet, bar size, spacing, cover and lap are yours — and nothing here says whether they are enough. Slabs carrying vehicles, footings, and anything supporting a structure are a code and engineering question.
- Bag counts assume a yield of 0.0075 cubic feet per pound of dry mix (an 80 lb or 36 kg bag makes about 0.6 cubic feet, 17 litres) and round up to whole bags. Real yield shifts with the product and with how much water goes in; check the bag you buy.
- The volume is not an order quantity. Ready-mix is sold in fixed increments with a minimum load and its own short-load charges, and concrete left in the drum, the chute or the pump line is not counted. The waste factor covers spillage and forming slop, not the plant's ordering rules.
- Edge forms are the slab's perimeter at its full thickness, from whole boards on each side stacked to the depth, with no stakes, braces, kickers or joints. The sub-base is its compacted volume over the slab's plan area; the loose volume adds your compaction allowance and is weighed at one loose crushed-stone density, with nothing for stone that spreads past the edge.
- Bars are counted edge to edge inside the cover, both ways, at one spacing, with a lap wherever a bar is longer than one stock length; stock bars are the total length over the stock length, so offcuts too short to reuse can add to the real count. Mesh sheets cover the slab's whole plan, laid long side along the slab and lapped at every join, cut sheets counted whole. Chairs, tie wire, edge and trim bars and a second mat are not counted.

A professional must decide:

- This is a volume take-off, not a structural decision. It accepts whatever thickness you type without sizing it, and says nothing about mix strength, aggregate size, air entrainment or fibre.
- Structure: sizes, thicknesses, spans, reinforcement and bearing are a structural engineer's or the building official's decision. This is a quantity, not a design.

## Sources

As the calculator cites them (sources checked 2026-10-31):

- Standard formula: cubic yards = length (ft) x width (ft) x thickness (ft) / 27
- An 80 lb bag of pre-mixed concrete yields approximately 0.6 cubic feet once mixed; 60 lb about 0.45 and 40 lb about 0.30 cubic feet — 0.0075 cubic feet per pound of dry mix, which puts 20, 25 and 30 kg bags at about 9.4, 11.7 and 14.0 litres
- Reinforcing bar mass from its nominal diameter, 7850 kg/m³ x π d² / 4: 10 mm 0.617 kg/m, 12 mm 0.888 kg/m (BS 4449 tables); #4 0.668 lb/ft, #5 1.043 lb/ft (ASTM A615 Table 1); bars counted as floor(clear span / spacing) + 1 each way
- Sub-base stone weighed loose at 1,550 kg/m³ (97 lb/ft³), crushed stone in the site's bulk-density table (lib/materials/bulk-density.ts); compaction allowances of 15 to 25% are common supplier and specification practice for crushed stone and hardcore

The site's pages for the documents these name:

- [ASTM A615](https://craftquantities.com/standards/astm/astm-a615/)

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Should I order exactly this amount from a ready-mix truck?**

Order slightly more if you're unsure — ready-mix trucks usually charge a short-load fee for small orders anyway, and running short mid-pour is far worse than having a little extra.

**How thick should my slab be?**

4 inches (~0.1 m) is standard for patios, walkways, and shed floors. 6 inches (~0.15 m) is common for driveways carrying vehicle weight. Check local code for structural slabs.

**Does this calculator account for rebar or wire mesh?**

Only as you specify it. Choose mesh or a rebar grid under Reinforcement and give the sheet, or the bar size, spacing, cover and lap from your drawing: the page counts the sheets, the bars each way, the laps, the stock bars and the steel weight. Which reinforcement a slab needs, if any, is a structural decision this page does not make.

**Which bag size should I count?**

The one your merchant stocks. The page counts 80 lb bags for every reader, then the two smaller bags of the reader's units: 60 and 40 lb in US customary, 25 and 20 kg in metric, all at the same yield per kilogram of dry mix; for anything beyond a few bags, compare the count with a ready-mix delivery.

**How many 80 lb bags make a cubic yard of concrete?**

Forty-five bags make a cubic yard before waste: a cubic yard is 27 cubic feet (0.76 m³), and an 80 lb bag makes about 0.6 cubic feet (17 litres), so 27 ÷ 0.6 = 45. A metric 30 kg bag makes about 14.0 litres, so a cubic metre takes about 72 of them. Past a cubic yard or so, most people compare the bag count with a ready-mix delivery.

**How much stone goes under the slab?**

The opening 10 × 10 ft slab on 4 in of compacted stone takes about 1.48 yd³ of loose stone, 1.94 tons; the metric opening, 3 × 3 m on 100 mm, takes 1.08 m³, 1.67 t. Those are the sub-base rows: the compacted volume is the slab's plan area times your depth, the loose volume adds the 20% compaction allowance (suppliers commonly allow 15 to 25%), and the weight is at 1,550 kg/m³ (97 lb/ft³) of loose crushed stone. Stone that spreads past the slab's edge is not counted, and your supplier's own compaction figure beats the default.

**What does the 10% waste allowance cover?**

Spillage, forming slop and a slightly uneven base: on the opening slab it takes 1.23 yd³ to 1.36 yd³ (0.9 m³ to 0.99 m³ on the 3 × 3 m slab). It is not a measurement of a rough sub-grade. Ruts, soft spots and over-excavation take concrete the geometry never sees, so check the depth across the whole pour before trusting the percentage, and it does not cover the concrete left in the drum, chute or pump line or a plant's minimum load.

## Related calculators

- [Rebar Calculator](https://craftquantities.com/calculators/materials-quantities/rebar-calculator/)
- [Concrete Bag Calculator](https://craftquantities.com/calculators/materials-quantities/concrete-bag-calculator/)
- [Concrete Steps Volume Calculator (Solid and Waist-Slab Flights)](https://craftquantities.com/calculators/materials-quantities/concrete-steps-volume-calculator/)
- [Concrete Curb and Gutter Volume Calculator](https://craftquantities.com/calculators/materials-quantities/curb-gutter-volume-calculator/)
- [Welded Wire Mesh Calculator — Reinforcing Mesh Sheets for a Slab](https://craftquantities.com/calculators/materials-quantities/welded-wire-mesh-calculator/)
- [Mulch & Gravel Calculator](https://craftquantities.com/calculators/landscaping-outdoor/mulch-gravel-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/concrete-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/concrete-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `concrete-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/concrete-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/concrete-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.