# Cavity Wall & Stud Bay Insulation Fill Calculator

> Fill volume, mass at the installed density, bags and injection holes for retrofitting a closed masonry cavity or drill-and-fill stud bays.

Page: https://craftquantities.com/calculators/materials-quantities/cavity-fill-volume-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.0, sources checked 2026-09-28, 3 published test vectors.

Bags of fill at the installed density: 7 bags for Wall Length 33 ft, Wall Height to Fill 8 ft and Openings Area 43 sq ft, the page's opening figures; on the metric page, 10 m, 2.4 m and 4 m² give 3 bags. Source: BBA Agrément Certificate 11/4857, Product Sheet 2 Issue 4 (12 December 2023), Knauf Insulation Supafil 34 (Retrofit).

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Wall Length | `wallLength` | 10 m | 33 ft | mm, cm, m, in, ft, yd; range 0.1–500 m |
| Wall Height to Fill | `wallHeight` | 2.4 m | 8 ft | mm, cm, m, in, ft, yd; range 0.1–30 m |
| Openings Area (windows and doors) | `openingsArea` | 4 m² | 43 sq ft | m2, ft2, mm2, in2; range 0–5000 m² |
| Number of Openings | `openingsCount` | 3 | 3 | range 0–200 |
| Cavity Width or Stud-Bay Depth | `cavityWidth` | 65 mm | 3.5 in | mm, cm, m, in, ft, yd; range 0.01–0.4 m |
| Stud Thickness (0 for a masonry cavity) | `studThickness` | 0 mm | 1.5 in | mm, cm, m, in, ft, yd; range 0–0.1 m |
| Hole Centres Along a Row (stud spacing if framed) | `holeSpacing` | 1.35 m | 16 in | mm, cm, m, in, ft, yd; range 0.1–3 m |
| Row Spacing Up the Wall (height between blocking if framed) | `rowSpacing` | 1.35 m | 8 ft | mm, cm, m, in, ft, yd; range 0.1–10 m |
| Extra Holes per Opening | `extraHolesPerOpening` | 2 | 2 | range 0–20 |
| Installed Density (from the certificate or chart) | `installedDensity` | 25 kg/m³ | 3.5 pcf | kgm3, pcf, lbyd3; range 5–150 kg/m³ |
| Bag Mass | `bagMass` | 15.5 kg | 30 lb | kg, lb, t, ton; range 1–1000 kg |
| Waste Allowance (%) | `wastePercent` | 0 | 0 | range 0–50 |

- **Wall Length**: The length of the elevation being filled, measured along its face.
- **Wall Height to Fill**: Masonry: the damp-proof course to the top of the cavity. Framed: one storey's bay, plate to plate.
- **Openings Area (windows and doors)**: The combined area of the windows and doors in this run, taken off the wall before the volume is worked out.
- **Number of Openings**: How many windows and doors there are in this run; each one adds the extra holes set below.
- **Cavity Width or Stud-Bay Depth**: The clear gap to fill: the width measured at the survey holes, 65 mm (2.56 in) in the masonry example, or a framed wall's stud depth, 3.5 in (89 mm) for a 2x4.
- **Stud Thickness (0 for a masonry cavity)**: Leave at 0 mm (0 in) for a masonry cavity; in a framed wall, the stud's face width, 1.5 in (38 mm) for dimensional lumber.
- **Hole Centres Along a Row (stud spacing if framed)**: Masonry: the certificate's spacing along a row, 1.35 m (4.43 ft) for Supafil 34. Framed: the stud centres, 16 in (406 mm) or 24 in (610 mm).
- **Row Spacing Up the Wall (height between blocking if framed)**: Masonry: the vertical centres of the certificate's rows. Framed: the height of each bay section between blocking, or the storey height if there is none.
- **Extra Holes per Opening**: Holes added for each window or door on top of the regular grid, under a cill, beside a frame, or in a short bay above or below it.
- **Installed Density (from the certificate or chart)**: The density the fill is blown to in the wall: 25 kg/m³ (1.56 lb/ft³) for Supafil 34, 3.5 lb/ft³ (56 kg/m³) for dense-pack cellulose.
- **Bag Mass**: The mass of one bag or bale as sold: 15.5 kg (34.2 lb) for a Supafil 34 bale, 30 lb (13.6 kg) nominal for a GreenFiber INS515LD cellulose bag.
- **Waste Allowance (%)**: A share added to the fill mass for material lost in the hose, blown into the loft and cleared out, or left in a part-used bag.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Bags of fill at the installed density** | 3 bags |
| Wall area to fill, openings deducted | 20 m² |
| Fill area, stud faces deducted | 20 m² |
| Fill volume | 1.3 m³ |
| Fill mass at the installed density, allowance included | 32.5 kg |
| Holes along each row | 8 holes |
| Rows of holes up the wall | 2 rows |
| Extra holes at openings | 6 holes |
| Injection holes in all | 22 holes |

### US customary

| Result | Value |
|---|---|
| **Bags of fill at the installed density** | 7 bags |
| Wall area to fill, openings deducted | 221 sq ft |
| Fill area, stud faces deducted | 200.28 sq ft |
| Fill volume | 58.42 ft³ |
| Fill mass at the installed density, allowance included | 204.45 lb |
| Holes along each row | 25 holes |
| Rows of holes up the wall | 1 row |
| Extra holes at openings | 6 holes |
| Injection holes in all | 31 holes |

## How it is worked out

The mass is the fill volume at the installed density entered, and the bags are that mass over the bag mass entered, rounded up. The holes are a grid estimate: what gets drilled is the pattern the system's certificate or the manufacturer's instructions draw for this elevation, which the installer marks up after the survey.

The working the page shows, in order: Wall area to fill, openings deducted; Fill area, stud faces deducted; Fill volume; Fill mass at the installed density, allowance included; Holes along each row; Rows of holes up the wall; Extra holes at openings; Injection holes in all; then bags of fill at the installed density.

The method, derived in full:

- [Mass from Volume and Density](https://craftquantities.com/methodology/mass-from-volume-and-density/): Why a rolled steel section's mass is read from a table rather than computed, why one material has five densities, and why a tonne of wet sand is less sand.

What this calculation does not cover:

- Whether this wall should be filled at all is not in the arithmetic. Driving-rain exposure, the clear width hole by hole, mortar snots and rubble bridging the leaves, a partial-fill board already inside, the state of the ties, missing cavity trays and damp already on the inner leaf are the installer's survey to establish before anything is drilled: the site assessment by a trained assessor that the system's certificate calls for (BBA 11/4857 for Supafil 34, section A.1), a practice set out in BS 8208-1:1985, a guide BSI withdrew in 2009. The page takes a wall that survey has cleared and counts what goes into it.
- Some wall voids must never be filled, and nothing here tells them apart: the air space behind a brick veneer on a timber or steel frame, and the gap between a masonry outer leaf and a timber-frame inner wall, are drainage and ventilation spaces. The page counts material for a two-leaf masonry cavity or for closed stud bays; which of those a wall is belongs to the surveyor.
- Air bricks and sleeves feeding an underfloor void or a combustion appliance, flue terminals and extract ducts that cross the void have to be sleeved or closed off before filling and checked clear afterwards, as the certificates cited require. The volume does not deduct them and the hole grid does not route round them.
- In a framed wall, knob-and-tube wiring must not be buried: the National Electrical Code does not permit it in a hollow wall insulated with loose or foamed-in-place fill that surrounds the conductors, so an electrician deals with it before any fill goes in. When the work is done for pay on a home built before 1978, opening painted siding in a way that disturbs more than 20 sq ft (1.86 m²) of it falls under the EPA's Renovation, Repair and Painting rule, which calls for a certified firm working lead-safe.
- The holes are a rectangular grid, holes along each row times rows up the wall, plus a fixed number an opening. A certificate draws its own pattern: Supafil 34 staggers 22 mm (0.87 in) holes in a diamond at about 1.35 m (4.43 ft), starts about 800 mm (31.5 in) above the damp-proof course and keeps the top holes within 350 mm (13.8 in) of the top of the cavity and no more than 1 m (3.28 ft) apart along it, or 1.35 m (4.43 ft) under a gable slope, so its top row usually takes more holes than the grid gives it; Ecobead Platinum drills at about 600 mm (23.6 in) with rows up to 2.5 m (8.2 ft) apart. The grid can land a row short or a row over; the marked-up elevation governs.
- Volume is the gap times the net area, with the studs' share taken off a framed wall. Plates, headers, blocking, window reveals where the leaves close together, and a cavity that narrows or widens along its length are left in, so a real wall usually takes a little less than this; a wall that takes far less is one whose cavity was already partly blocked.
- The mass follows the installed density typed in, and nothing is added for settling: the masonry certificates set a target mean over the whole wall, 25 kg/m³ (1.56 lb/ft³) for Supafil 34 and 12 kg/m³ (0.75 lb/ft³) for Ecobead Platinum, and dense-pack is blown to a minimum such as 3.5 lb/ft³ (56 kg/m³) so that it holds its place. A loft chart's lower density counts too few bags for the same wall.
- Nothing here stands for a guarantee or for building-control sign-off. In England and Wales, putting insulation into a cavity wall is building work notified to building control, directly or through an installer registered with a competent person scheme, and a UK installer registers the guarantee, commonly through the Cavity Insulation Guarantee Agency (CIGA). Whether either is in place is the installer's paperwork, not this estimate.

A professional must decide:

- In a framed wall, knob-and-tube wiring must not be buried: the National Electrical Code does not permit it in a hollow wall insulated with loose or foamed-in-place fill that surrounds the conductors, so an electrician deals with it before any fill goes in. When the work is done for pay on a home built before 1978, opening painted siding in a way that disturbs more than 20 sq ft (1.86 m²) of it falls under the EPA's Renovation, Repair and Painting rule, which calls for a certified firm working lead-safe.
- Nothing here stands for a guarantee or for building-control sign-off. In England and Wales, putting insulation into a cavity wall is building work notified to building control, directly or through an installer registered with a competent person scheme, and a UK installer registers the guarantee, commonly through the Cavity Insulation Guarantee Agency (CIGA).
- Electrics: circuit design, protection, cable sizing and the work itself are for a qualified or licensed electrician, under the rules where you build.

## Sources

As the calculator cites them (sources checked 2026-09-28):

- BBA Agrément Certificate 11/4857, Product Sheet 2 Issue 4 (12 December 2023), Knauf Insulation Supafil 34 (Retrofit): a site assessment by a trained assessor before installation (A.1); target mean installed density 25 kg/m³ (±5) over the whole wall (9.1.4); bales of about 15.5 kg (11.1); nominal cavity not less than 50 mm, and over 200 mm referred to the certificate holder (9.1.2, 9.1.3); 22 mm holes in a diamond pattern at about 1.35 m centres, bottom row about 800 mm above the DPC, top holes within 350 mm of the top and not more than 1 m apart, extra holes under cills and around features (A.5); ventilation openings and flues sleeved before and checked after (9.1.5, A.7); up to 12 m without a waiver (9.1.14) <https://knauf.com/api/download-center/v1/assets/71ae5b5e-94e4-4be5-86fb-67c17c663cf8?download=true>
- BBA Agrément Certificate 88/2033, Product Sheet 1, fourth issue (26 July 2021), Knauf Insulation Supafil 40: target mean installed density 18 kg/m³ (section 1.2) and bales of about 17.6 kg (section 3.1) — a second product from the same maker, which is why the density and the bag mass are the certificate's, not the page's <https://pim.knaufinsulation.com/files/download/knauf_insulation_supafil_40_bba_certificate_88_2033-uk-en.pdf>
- BBA Agrément Certificate 04/4167, Product Sheet 1, third issue (4 June 2020), Springvale Ecobead Platinum bonded EPS bead: target mean installed density 12 kg/m³ (±2) (section 1.2); 22 mm holes at about 600 mm intervals, holes about 250 mm below openings and between them, rows not more than 2.5 m apart (18.1–18.3); bead delivered in sacks or bulk containers (3.1) <https://springvale.com/wp-content/uploads/2020/07/bba-04-4167-ecobead-dated-june-2020.pdf>
- GreenFiber INS515LD application coverage chart (manufacturer's data sheet): 30 lb nominal bag, minimum net weight 28.5 lb; dry dense-pack sidewall at 3.5 pcf minimum installed density; a 2x4 wall at 3.5 in takes 1.02 lb/sq ft, 29.39 sq ft a bag before framing and 32.4 sq ft at 16 in centres; framing factor 9.375% at 16 in centres and 6.25% at 24 in <http://pdf.lowes.com/operatingguides/729477005157_oper.pdf>
- US DOE Building America Solution Center (PNNL): 'Dense-Pack Insulation' — cellulose dense-packed at 3.5 to 4.5 lb/ft³ (56 to 72 kg/m³); 'Blown Insulation for Cavities of Existing Exterior Walls' — a 1 in or 2 in hole in the centre of each stud cavity about 6 in below the ceiling, an additional hole below any blocking, and knob-and-tube wiring not to be surrounded by insulation <https://basc.pnnl.gov/resource-guides/blown-insulation-cavities-existing-exterior-walls>
- Ofgem / ECO Reporting Working Group, Guidance on suitable photographic evidence of retrofitted CWI, Version 1.0 (October 2020): standard drill holes of approximately 18–25 mm in the mortar joints, a pattern determined by the product manufacturer or certification body, concentrated round windows and doors and under waste pipes and vents; lance installations drilled at the corners of elevations, typically 27–40 mm <https://www.ofgem.gov.uk/sites/default/files/docs/2020/10/ftch_drill_patterns_final.pdf>
- BS 8208-1:1985, Guide to assessment of suitability of external cavity walls for filling with thermal insulants — Part 1: Existing traditional cavity construction — withdrawn by BSI on 1 July 2009 and still cited in Approved Document D (1992 edition incorporating the 2002 and 2010 amendments) for foam fill; the withdrawn guide behind the survey this page leaves to the installer
- NFPA 70, National Electrical Code, Article 394.12 — concealed knob-and-tube wiring is not permitted in hollow wall spaces insulated by loose, rolled or foamed-in-place insulation that envelops the conductors
- US EPA Renovation, Repair and Painting Rule, 40 CFR Part 745 Subpart E: the rule applies to renovations performed for compensation in target housing (§745.82), and work in housing built before 1978 that disturbs more than 20 sq ft of painted exterior surface is not minor repair (§745.83) <https://www.law.cornell.edu/cfr/text/40/745.83>
- The Building Regulations 2010 (England), regulation 3(1)(e): the insertion of insulating material into the cavity wall of a building is building work; the Cavity Insulation Guarantee Agency (CIGA) registers the guarantee a UK installer issues <https://www.legislation.gov.uk/uksi/2010/2214/regulation/3>

The site's pages for the documents these name:

- [National Electrical Code (NFPA 70)](https://craftquantities.com/standards/nfpa/nec/)
- [Approved Documents to the Building Regulations (England)](https://craftquantities.com/standards/uk-gov/uk-approved-documents/)

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Why does the page ask for the installed density instead of a coverage per bag?**

Because a closed wall is filled to a density, and the certificate or the dense-pack chart states it. Two products from one maker show why it cannot be assumed: Supafil 34 is blown to 25 kg/m³ (1.56 lb/ft³) and sold in bales of about 15.5 kg (34.2 lb), Supafil 40 to 18 kg/m³ (1.12 lb/ft³) in bales of about 17.6 kg (38.8 lb). On the same 20 m² (215 sq ft) of 65 mm (2.56 in) cavity that is three bales of one and two of the other. A loft bag's coverage is quoted at a far lower density and would under-count a wall.

**How do I use the result to check a job that has been done?**

Ask the installer how many bags or bales went into the wall, and set that beside the bags shown here for the same wall. Well short means the fill stopped at something: a bridged or rubble-filled cavity, a partial-fill board, or voids the pattern did not reach. Well over, on a masonry wall, can mean fill escaped into the loft or a neighbour's cavity. Either is a question for the installer, and a borescope through a fresh hole is how it gets answered.

**How is a US or Canadian drill-and-fill wall entered?**

Enter the stud depth as the gap, 3.5 in (89 mm) for a 2x4, the stud thickness as 1.5 in (38 mm), and the stud spacing, 16 in (406 mm) or 24 in (610 mm), as the hole centres. There is one hole in each bay. Set the row spacing to the height of each bay section: the storey height where there is no blocking, half of it where a row of blocking runs across the middle. Run each storey separately. The holes themselves are usually 1 in or 2 in (25 or 51 mm), sized to the blowing nozzle.

**Why does the page open on a stud wall in imperial units and a brick cavity in metric?**

Six fields open on what each unit system's main market installs, and a page cannot tell a Canadian reader from a British one. In imperial units it opens on a 2x4 wall with dense-pack cellulose; for a brick or block cavity, set the stud thickness to 0 in (0 mm) and enter the certificate's gap, hole pattern, installed density and bale mass. In metric units, which is how it usually opens in Canada as well as in the UK, it starts on a 65 mm (2.56 in) masonry cavity; for Canadian drill-and-fill, change all six: gap 89 mm (3.5 in), stud thickness 38 mm (1.5 in), hole centres 406 mm (16 in), row spacing the storey height, installed density 56 kg/m³ (3.5 lb/ft³), and the bag mass printed on the bag.

**What size are the holes in a brick cavity wall, and what happens to them?**

Around 22 mm (0.87 in) for the certificated mineral wool and bead systems cited here, drilled into the mortar joints rather than the bricks, and filled afterwards with mortar matched to the wall's type, colour and texture. The ECO guidance on photographing a filled wall as evidence for Ofgem puts standard retrofit holes at 18 to 25 mm (0.71 to 0.98 in), clustered round windows and doors and under pipes and vents; a wall filled with a lance from the side shows larger holes at the corners of each elevation, 27 to 40 mm (1.06 to 1.57 in).

**Does this work for an injected foam?**

The volume and the mass do, if the installed density typed in is the one in that foam's own certificate. The bag count does not mean much, because foam is mixed on site from liquid components rather than bought in bags of a fixed mass, so read the mass line. In the UK, urea-formaldehyde cavity foam had its own pair of standards, BS 5617:1985 for the system and BS 5618:1985 for installing it; BSI has withdrawn both, and Approved Document D still cites them.

## Related calculators

- [Blown-In Insulation Bag Count Calculator](https://craftquantities.com/calculators/materials-quantities/blown-insulation-bag-calculator/)
- [Spray Foam Insulation Calculator](https://craftquantities.com/calculators/insulation-efficiency/spray-foam-insulation-calculator/)
- [Cavity Wall Weep Hole Spacing Calculator](https://craftquantities.com/calculators/materials-quantities/cavity-wall-weep-hole-calculator/)
- [Brick Veneer Wall Tie Density Calculator](https://craftquantities.com/calculators/materials-quantities/wall-tie-density-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/cavity-fill-volume-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/cavity-fill-volume-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `cavity-fill-volume-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/cavity-fill-volume-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/cavity-fill-volume-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.