# Cable Tray Loaded Weight Per Unit Length Calculator

> The load per unit length a cable tray puts on its supports: the cables, the tray, attached conduits, ice, and a worker's weight as a distributed load.

Page: https://craftquantities.com/calculators/materials-quantities/cable-tray-loaded-weight-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.1, sources checked 2026-09-06, 3 published test vectors.

Total load per unit length: 53.8 lb/ft for Cable Schedule Weight per Unit Length 9.41 lb/ft, Tray Self-Weight per Unit Length 3.02 lb/ft and Attached Conduits, Cleats and Accessories 1.34 lb/ft, the page's opening figures; on the metric page, 14 kg/m, 4.5 kg/m and 2 kg/m give 81 kg/m. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Cable Schedule Weight per Unit Length | `cableWeightPerLength` | 14 kg/m | 9.40757 lb/ft | kgm, lbft; range 0–200 kg/m |
| Tray Self-Weight per Unit Length | `trayWeightPerLength` | 4.5 kg/m | 3.02386 lb/ft | kgm, lbft; range 0–50 kg/m |
| Attached Conduits, Cleats and Accessories | `conduitWeightPerLength` | 2 kg/m | 1.34394 lb/ft | kgm, lbft; range 0–100 kg/m |
| Ice or Snow Allowance per Unit Length | `iceSnowPerLength` | 0 kg/m | 0 lb/ft | kgm, lbft; range 0–60 kg/m |
| Concentrated Worker Allowance | `concentratedAllowance` | 90.7185 kg | 200 lb | kg, lb, t, ton; range 0–400 kg |
| Support Span | `supportSpan` | 3 m | 10 ft | mm, cm, m, in, ft, yd; range 0.5–9 m |

- **Cable Schedule Weight per Unit Length**: Every cable in this segment, summed from the schedule.
- **Tray Self-Weight per Unit Length**: The empty weight of the tray section itself, from the manufacturer's catalogue.
- **Attached Conduits, Cleats and Accessories**: Anything strapped to or hung off the tray that is not a cable in it.
- **Ice or Snow Allowance per Unit Length**: Radial ice or lying snow on an outdoor tray, per unit of run. Zero indoors.
- **Concentrated Worker Allowance**: The point load of a person working in the tray during a pull, applied at mid-span.
- **Support Span**: Centre-to-centre distance between the two supports either side of this segment.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Total load per unit length** | 81 kg/m |
| Uniformly distributed load from the schedule | 20.5 kg/m |
| Cables in the segment | 14 kg/m |
| Tray self-weight | 4.5 kg/m |
| Attached conduits and cleats | 2 kg/m |
| Ice or snow allowance | 0 kg/m |
| Concentrated allowance restated for a moment check | 60.48 kg/m |
| Concentrated allowance restated for a deflection check | 48.38 kg/m |
| Total load for a moment check, in N/m for the deflection page | 794.13 N/m |
| Total load for a deflection check, in N/m for the deflection page | 675.51 N/m |
| Mid-span bending moment from the total | 893.4 N·m |

### US customary

| Result | Value |
|---|---|
| **Total load per unit length** | 53.8 lb/ft |
| Uniformly distributed load from the schedule | 13.78 lb/ft |
| Cables in the segment | 9.41 lb/ft |
| Tray self-weight | 3.02 lb/ft |
| Attached conduits and cleats | 1.34 lb/ft |
| Ice or snow allowance | 0 lb/ft |
| Concentrated allowance restated for a moment check | 40 lb/ft |
| Concentrated allowance restated for a deflection check | 32 lb/ft |
| Total load for a moment check, in N/m for the deflection page | 784.79 N/m |
| Total load for a deflection check, in N/m for the deflection page | 668.04 N/m |
| Mid-span bending moment from the total | 672.19 lbf·ft |

## How it is worked out

The headline uses the moment-equivalent restatement of the worker allowance, which is the conservative one. For a deflection check, swap in the smaller figure from the breakdown — using the moment equivalent there overstates the sag by a quarter.

The working the page shows, in order: Uniformly distributed load from the schedule; Cables in the segment; Tray self-weight; Attached conduits and cleats; Ice or snow allowance; Concentrated allowance restated for a moment check; Concentrated allowance restated for a deflection check; Total load for a moment check, in N/m for the deflection page; Total load for a deflection check, in N/m for the deflection page; Mid-span bending moment from the total; then total load per unit length.

The method, derived in full:

- [Conduit Fill, Cable Pulling and Heating Cable](https://craftquantities.com/methodology/cable-containment-and-pulling/): Why a conduit is full at forty per cent, why two ninety-degree bends can multiply a pull force fivefold, and why snow melting needs far more power per square metre than heating the space above it.

What this calculation does not cover:

- The equivalence between a point load and a uniform load holds for a simply supported single span. Continuous tray over several supports redistributes both, generally in the tray's favour.
- No allowance for wind on an outdoor run, nor for the sideways load a cable pull puts on a bend. Both are real and neither is a weight per unit length.
- Cable weight per unit length rises as a tray fills, and the fill limit is a separate check on cross-sectional area rather than on weight.

A professional must decide:

- Electrics: circuit design, protection, cable sizing and the work itself are for a qualified or licensed electrician, under the rules where you build.

## Sources

As the calculator cites them (sources checked 2026-09-06):

- NEMA VE 1, Metal Cable Tray Systems — tray is rated for a uniformly distributed working load applied together with a concentrated load at mid-span, which is why a worker allowance has to be carried alongside the distributed cable weight rather than folded into it
- NEMA VE 2, Cable Tray Installation Guidelines — the concentrated allowance represents an installer standing or kneeling in the tray during a pull, and it is applied where it does most harm, at mid-span
- Restating a mid-span point load as an equivalent uniform load is exact beam statics, and the factor depends on what is being checked: 2P/L matches the bending moment (PL/4 = wL²/8) and 1.6P/L matches the deflection (PL³/48EI = 5wL⁴/384EI). Both are reported because using one where the other belongs overstates or understates by 25%
- Distinct from this site's Cable Tray Center-Span Deflection Calculator, which takes a load per unit length as an input. This one builds that number from the segment's own schedule and hands it over — but hand over one of the two N/m rows in the breakdown, NOT the kg/m headline: that field is a force per unit length and the headline is a mass per unit length, a factor of 9.81 apart

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Why restate the worker's weight as a distributed load at all?**

Because span tables and deflection formulas are written for distributed loads, and a person is emphatically not one. Converting the point load into the uniform load that produces the same effect lets you carry a single number into the span check. The conversion is exact simple-beam statics, not an approximation.

**Why are there two different restatements of the same 200 lb?**

Because bending and sagging are different questions. The uniform load matching a point load's bending moment is 2P divided by the span; the one matching its deflection is 1.6P divided by the span. They differ by a quarter, so using the moment figure in a deflection calculation makes the tray look worse than it is, and the reverse makes it look better.

**Should I really do this per segment rather than for the whole run?**

Yes, wherever the schedule changes. A tray leaving a switchroom with twelve feeders in it and arriving at the far end with three is not one loading case, and sizing the whole route on the heaviest segment buys steel and hangers you do not need. Work each stretch between branch points on its own.

**How does this differ from the tray deflection calculator on this site?**

That one starts where this one stops. It asks for the load per unit length and gives you the sag; this one builds that load from the cable schedule, the tray catalogue weight, the accessories and the worker allowance. Run this first — then take one of the two N/m rows from the breakdown into it, not the kg/m headline. That page's field is a FORCE per unit length and this page's headline is a MASS per unit length, so carrying the headline across under-states the load by a factor of 9.81 and returns about a tenth of the real sag. Use the deflection row for a serviceability check and the moment row where you want the conservative one.

## Related calculators

- [Cable Tray Center-Span Deflection Calculator](https://craftquantities.com/calculators/materials-quantities/cable-tray-deflection-calculator/)
- [Cable Tray Fill Percentage Calculator](https://craftquantities.com/calculators/materials-quantities/cable-tray-fill-calculator/)
- [Cable Pulling Tension Calculator (Straight Run)](https://craftquantities.com/calculators/materials-quantities/wire-pulling-tension-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/cable-tray-loaded-weight-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/cable-tray-loaded-weight-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `cable-tray-loaded-weight-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/cable-tray-loaded-weight-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/cable-tray-loaded-weight-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.