# Asphalt Tons to Cubic Yards Calculator

> Convert a quoted asphalt tonnage into cubic yards to check it covers your area.

Page: https://craftquantities.com/calculators/materials-quantities/asphalt-tons-to-cubic-yards-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.0, sources checked 2026-08-26, 2 published test vectors.

Approximate volume: 5.11 yd³ for Asphalt weight 10, the page's opening figures. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Asphalt weight (short tons) | `tons` | 10 | 10 | range 0–5000 |

- **Asphalt weight (short tons)**: The tonnage quoted, ordered or delivered.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Approximate volume** | 5.11 yd³ |
| Conversion factor applied | 0.51 yd³ per short ton |

### US customary

| Result | Value |
|---|---|
| **Approximate volume** | 5.11 yd³ |
| Conversion factor applied | 0.51 yd³ per short ton |

## How it is worked out

About 1.96 short tons per cubic yard for compacted hot-mix asphalt — 145 lb per cubic foot over 27 cubic feet — which is the same density the Asphalt Driveway Calculator applies, so the two pages agree on the same load. The inverse of the volume-to-weight figure. Compare the resulting volume against your compacted or settled requirement, not the loose figure.

The working the page shows, in order: Conversion factor applied; then approximate volume.

The method, derived in full:

- [Unit Conversion, Exactness and Rounding](https://craftquantities.com/methodology/unit-conversion-and-rounding/): Why most conversion factors carry no uncertainty at all, which ones hide a material assumption, and why converting a measurement can never make it more precise than it was.

What this calculation does not cover:

- Not all of a delivered tonnage becomes pavement. Mix clings in the lorry body and the paver hopper, hand-work around gullies, ironwork and kerb lines wastes more than a machine-laid run does, and the edge trimmed back where the next run butts against it takes out material already paid for. The volume above is what that tonnage would make as finished mat, not what will finish up in yours.
- Dividing this volume by the area gives an average depth, not the depth you get everywhere. A paver screed floats on what is beneath it and only partly irons out ruts, patching and settlement, so hollows draw extra material while high spots take less, and bringing a poor base back to shape is a quantity in its own right rather than something the surfacing load absorbs. An under-rolled mat then goes on densifying under traffic, so the wheel paths lose a little more depth after the surface is opened.
- A quoted tonnage often spans more than one course. Binder course and surface course are different mixes, laid at different densities to separately specified thicknesses, so a combined tonnage converted at a single density gives a depth that belongs to neither. Split it by course against the delivery tickets before comparing anything with a specified thickness.

## Sources

As the calculator cites them (sources checked 2026-08-26):

- Inverse of approximately 1.9575 short tons per cubic yard
- 1 short ton = 2,000 lb; a metric tonne is about 10% heavier

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Will this tonnage cover my drive?**

Convert to volume, divide by the area, and compare against the specified compacted thickness. If it falls short, order more rather than laying thinner — thickness is what carries the load.

**Why is asphalt sold by weight?**

Because it is produced and transported hot in weighed loads, and weight is what a plant and a weighbridge can verify. Volume changes with temperature and compaction; weight does not.

**Does leftover asphalt keep?**

Not usefully. Hot mix must be laid and compacted within its temperature window, so surplus on site is generally waste. That makes accurate ordering more important than for materials that can be stockpiled.

## Related calculators

- [Asphalt Cubic Yards to Tons Calculator](https://craftquantities.com/calculators/materials-quantities/asphalt-cubic-yards-to-tons-calculator/)
- [Asphalt Driveway Calculator](https://craftquantities.com/calculators/auto-utility/asphalt-driveway-calculator/)
- [Concrete Driveway Calculator](https://craftquantities.com/calculators/auto-utility/driveway-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/asphalt-tons-to-cubic-yards-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/asphalt-tons-to-cubic-yards-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `asphalt-tons-to-cubic-yards-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/asphalt-tons-to-cubic-yards-calculator.json

---