# Asphalt Cubic Yards to Tons Calculator

> Convert an asphalt volume in cubic yards into short tons for suppliers who price by weight.

Page: https://craftquantities.com/calculators/materials-quantities/asphalt-cubic-yards-to-tons-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.0, sources checked 2026-08-26, 2 published test vectors.

Approximate weight: 19.6 short tons for Asphalt volume 10, the page's opening figures. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Asphalt volume (yd³) | `cubicYards` | 10 | 10 | range 0–5000 |

- **Asphalt volume (yd³)**: The volume of asphalt required, in cubic yards.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Approximate weight** | 19.6 short tons |
| Conversion factor applied | 1.96 short tons per yd³ |

### US customary

| Result | Value |
|---|---|
| **Approximate weight** | 19.6 short tons |
| Conversion factor applied | 1.96 short tons per yd³ |

## How it is worked out

About 1.96 short tons per cubic yard for compacted hot-mix asphalt — 145 lb per cubic foot over 27 cubic feet — which is the same density the Asphalt Driveway Calculator applies, so the two pages agree on the same load. This is a planning figure, not a specification. Confirm the density with your supplier before ordering by weight.

The working the page shows, in order: Conversion factor applied; then approximate weight.

The method, derived in full:

- [Unit Conversion, Exactness and Rounding](https://craftquantities.com/methodology/unit-conversion-and-rounding/): Why most conversion factors carry no uncertainty at all, which ones hide a material assumption, and why converting a measurement can never make it more precise than it was.

What this calculation does not cover:

- A tonnage is a quantity, not an order. Hot mix is made to order and moved in whole lorry loads, so the converted figure has to be turned into loads the plant will actually send, and the last one is rarely a neat fit. The two ways of rounding are not equal: surplus at the end of a run has nowhere to go, while running out mid-run stops the paver and leaves a joint across the finished surface.
- Haulage is planned against the tonnage rather than the cubic yards, and for hot mix that means a delivery sequence and not simply a number of loads, because each load carries its own temperature clock and has to arrive with the paver ready to take it. That weight also travels over the works before it reaches them: a laden tipper reversing to the paver puts its full axle load on the new sub-base, the domestic drive or the suspended deck underneath, and whether that will take it is a separate check from the paving.
- Breaking the pavement out changes the volume, not the weight. The density used here is that of the rolled mat, so the tonnage still stands once the pavement is broken up, while the same material stacked as slabs and lumps with voids between them takes a good deal more room on the ground and in the lorry. Size the skips and removal loads on that loose volume, not on the volume of pavement you measured — the container is filled by volume and the tip charges by weight.

## Sources

As the calculator cites them (sources checked 2026-08-26):

- Typical bulk density used here: approximately 1.9575 short tons per cubic yard
- Bulk density varies with moisture, compaction and grading — the supplier's weighbridge ticket governs

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Loose or compacted density?**

This uses compacted density, which is what a finished thickness specification refers to. Asphalt arrives loose and is rolled down, so the delivered volume exceeds the in-place volume — order against the compacted requirement plus an allowance.

**How thick should a driveway be?**

As thick as the design for its sub-base and traffic specifies, rather than a rule of thumb: a domestic driveway and a commercial yard have very different requirements. The sub-base matters at least as much as the asphalt thickness.

**Why must asphalt be laid hot?**

Because it has to be compacted while workable. Once it cools below the compaction window it cannot be brought to density, and material that has not reached density fails early regardless of how thick it is.

## Related calculators

- [Asphalt Tons to Cubic Yards Calculator](https://craftquantities.com/calculators/materials-quantities/asphalt-tons-to-cubic-yards-calculator/)
- [Asphalt Driveway Calculator](https://craftquantities.com/calculators/auto-utility/asphalt-driveway-calculator/)
- [Concrete Driveway Calculator](https://craftquantities.com/calculators/auto-utility/driveway-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/asphalt-cubic-yards-to-tons-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/asphalt-cubic-yards-to-tons-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `asphalt-cubic-yards-to-tons-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/asphalt-cubic-yards-to-tons-calculator.json

---
Source: https://craftquantities.com/calculators/materials-quantities/asphalt-cubic-yards-to-tons-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.