# Mulch & Gravel Calculator

> Estimate the mulch, gravel or soil needed to cover an area at a given depth, in cubic yards or cubic metres.

Page: https://craftquantities.com/calculators/landscaping-outdoor/mulch-gravel-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.2, sources checked 2026-09-05, 2 published test vectors.

Estimated mulch & gravel needed: 0.662 yd³ for Area Length 10 ft, Area Width 6.5 ft and Depth 3 in, the page's opening figures; on the metric page, 3 m, 2 m and 7.62 cm give 0.503 m³. Sources are cited below.

## Key facts

- The standard landscaping formula for loose mulch, gravel or soil is cubic yards = area in square feet × depth in inches ÷ 324. (source: Landscaping volume formula (÷ 324): Standard landscaping formula: cubic yards = area (sq ft) x depth (inches) / 324)
- Fine mulch top-ups are typically 1 to 2 in (2.5 to 5 cm) deep; coarser new mulch or a gravel base, 3 to 4 in (7.5 to 10 cm). (source: Mulch and gravel depth practice: 1-2 inch depth is typical for fine mulch top-ups; 3-4 inches for coarser new mulch or gravel bases)
- One cubic yard of mulch or gravel is 0.7645549 m³ (NIST), so a cubic metre of loose landscape material is about 1.31 cubic yards. ([NIST SI Guide, App. B.9](https://www.nist.gov/pml/special-publication-811/nist-guide-si-appendix-b-conversion-factors/nist-guide-si-appendix-b9): NIST Guide to the SI, Appendix B.9: Factors for units listed by kind of quantity, National Institute of Standards and Technology)

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Area Length | `areaLength` | 3 m | 10 ft | mm, cm, m, in, ft, yd; range 0.01–50 m |
| Area Width | `areaWidth` | 2 m | 6.5 ft | mm, cm, m, in, ft, yd; range 0.01–50 m |
| Depth | `depth` | 7.62 cm | 3 in | mm, cm, m, in, ft, yd; range 0.01–0.3048 m |
| Extra for Settling (%) | `wasteFactorPercent` | 10 | 10 | range 0–25 |

- **Area Length**: The length of the bed or area to cover.
- **Area Width**: The width of the bed or area to cover.
- **Depth**: How deep a layer to spread.
- **Extra for Settling (%)**: Mulch settles and beds are rarely perfectly level.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Estimated mulch & gravel needed** | 0.503 m³ |
| Area | 6 m² |
| Depth | 76.2 mm |
| Volume (no extra) | 0.46 m³ |

### US customary

| Result | Value |
|---|---|
| **Estimated mulch & gravel needed** | 0.662 yd³ |
| Area | 65 sq ft |
| Depth | 3 in |
| Volume (no extra) | 0.6 yd³ |

## Formula with your numbers

1. **Measure the area**: 10 ft × 6.5 ft = 65 sq ft
2. **Multiply by the depth**: 65 sq ft × 3 in = 0.6 yd³
3. **Add the extra for settling**: 0.6 yd³ + 10% = 0.662 yd³

Worked on the figures the page opens on; the page re-works each step on the reader's own.

## How to calculate mulch & gravel in 3 steps

1. **Measure the area**: Measure the bed's length and width and multiply them; break a curved bed or a tree ring into rectangles and run each one.
2. **Multiply by the depth**: Multiply the area by the depth: square feet times inches, divided by 324, gives cubic yards; square metres times metres gives cubic metres.
3. **Add the extra for settling**: Add the settling percentage for mulch that sinks and a base that is not level, then round up to the bulk unit or bag your supplier sells.

## Mulch or gravel for common bed sizes

Page defaults, not your figures above.

| Bed (length × width) | Estimated mulch & gravel needed |
|---|---|
| 10 × 3 ft (3.05 × 0.91 m) | 0.31 yd³ (0.23 m³) |
| 10 × 10 ft (3.05 × 3.05 m) | 1.02 yd³ (0.78 m³) |
| 20 × 5 ft (6.1 × 1.52 m) | 1.02 yd³ (0.78 m³) |
| 20 × 20 ft (6.1 × 6.1 m) | 4.07 yd³ (3.11 m³) |
| 3 × 1 m (9.84 × 3.28 ft) | 0.25 m³ (0.33 yd³) |
| 5 × 2 m (16.4 × 6.56 ft) | 0.84 m³ (1.1 yd³) |
| 10 × 3 m (32.81 × 9.84 ft) | 2.51 m³ (3.29 yd³) |

## How it is worked out

The working the page shows, in order: Area; Depth; Volume (no extra); then estimated mulch & gravel needed.

The method, derived in full:

- [Quantity, Waste and Rounding](https://craftquantities.com/methodology/quantity-waste-and-rounding/): Why a material count is a ceiling function rather than a division, and why the waste factor — not the geometry — carries the risk.

What this calculation does not cover:

- The covered area is one rectangle: \`areaLength \* areaWidth\` and nothing else, so a curved border, a kidney-shaped bed, a circular tree ring or a path that turns a corner has to be broken into rectangles and each piece run separately before you add the yardages up. Each of those two fields also stops at 50 m (about 164 ft), and a longer run is clamped back to that bound rather than calculated.
- The depth you enter is spread flat across the whole measured area. Nothing thins the layer back from stems and trunks, dishes it around a drain cover or manhole, crowns a gravel path so it sheds water, or subtracts the mulch already sitting in the bed — the answer is a full new layer at the stated depth over the whole rectangle, and the depth field itself is capped at 12 inches (30.5 cm), so a deeper gravel fill is not what this describes.
- No material is named anywhere in the arithmetic, so shredded bark, wood chip, pea gravel, crushed stone and screened topsoil all come back as exactly the same volume. Bulk aggregate is normally sold and delivered by weight while mulch is sold by volume, and turning this volume into a weight for a gravel order needs a density figure the page never asks for.
- The "Extra for Settling" percentage is a single flat multiplier on the finished volume, capped at 25 per cent, and settling is what it is named for: mulch sinking and an uneven base. It is not a compaction allowance, so gravel that will be raked and plate-compacted to a finished depth needs more loose material delivered than the area-by-depth figure suggests, and nothing in the formula adds it.
- The figure comes back unrounded, at whatever fraction of a bulk unit the geometry gives. Bulk suppliers deliver in whole units of their own measure, by weight or in bulk bags and bagged mulch comes in fixed bag sizes, so this is the amount needed to cover the bed rather than the amount you can actually order — round up to the next unit your yard sells.
- Cost, where you switch it on, is applied through one installed-mulch rate per cubic yard for every result. Gravel, decorative stone and topsoil are priced at that same mulch rate, so the money figure tracks the volume correctly but not the material.

## Sources

As the calculator cites them (sources checked 2026-09-05):

- Standard landscaping formula: cubic yards = area (sq ft) x depth (inches) / 324
- 1-2 inch depth is typical for fine mulch top-ups; 3-4 inches for coarser new mulch or gravel bases

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**How many bags of mulch is this?**

Bagged mulch is typically sold in 2 cubic foot bags — multiply the cubic yards result by 13.5 to get the number of 2 ft³ bags needed (1 cubic yard = 27 cubic feet).

**Does this work for gravel and soil too?**

Yes — the area x depth / 324 formula is generic to any bulk loose material. Just adjust the depth to what's appropriate for gravel (often 4+ inches for a base layer) or soil.

**How many cubic yards cover a 6.5 ft by 10 ft bed 3 inches deep?**

0.66 cubic yards with the page's 10% extra for settling: 65 sq ft × 3 in ÷ 324 is 0.60 cubic yards, and the extra takes it to 0.66. The metric opening, 3 m by 2 m at 7.62 cm, needs 0.50 m³ on the same 10%.

**Where does the 324 in the mulch and gravel formula come from?**

It is 12 × 27: a depth in inches becomes feet by dividing by 12, and cubic feet become cubic yards by dividing by 27, so cubic yards = area (sq ft) x depth (inches) / 324 does both in one step. In metric no divisor is needed: square metres times metres of depth is cubic metres.

**Can this page tell me how many tons of gravel to order?**

No: it returns a volume only, and no material or density enters the arithmetic, so bark, pea gravel, crushed stone and topsoil all come back as the same yardage. Bulk aggregate is usually sold by weight, so convert with the density your yard quotes, or use the gravel calculator, which weighs the load.

**Is the settling extra enough for gravel that will be plate-compacted?**

Not necessarily: the extra is one flat multiplier, capped at 25 per cent, meant for mulch sinking and an uneven base, not a compaction allowance. Gravel raked and compacted to a finished depth needs more loose material delivered than the area-by-depth figure, and nothing in this formula adds it.

## Related calculators

- [Concrete Calculator](https://craftquantities.com/calculators/materials-quantities/concrete-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/mulch-gravel-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/mulch-gravel-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `mulch-gravel-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/mulch-gravel-calculator.json

---
Source: https://craftquantities.com/calculators/landscaping-outdoor/mulch-gravel-calculator/