# Soil Nail Pull-Out Safety Factor Calculator

> Check a soil nail's pull-out safety factor against the standard FHWA minimum of 2.0.

Page: https://craftquantities.com/calculators/heavy-civil/soil-nail-pullout-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.1, sources checked 2026-09-06, 2 published test vectors.

Pull-out safety factor: 3.56 (target ≥2.0) for Nominal Bond Strength 2088.54 psf, Drill Hole Diameter 6 in and Bonded Length 19.5 ft, the page's opening figures, to compare with the limit shown with it; a comparison, not a check. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Nominal Bond Strength (qs) | `bondStrength` | 100 kPa | 2088.54 psf | pa, kpa, mpa, psi, psf, in_wc; range 20000–400000 Pa |
| Drill Hole Diameter | `holeDiameter` | 15 cm | 6 in | mm, cm, m, in, ft, yd; range 0.01–0.4 m |
| Bonded Length | `bondedLength` | 6 m | 19.5 ft | mm, cm, m, in, ft, yd; range 0.01–20 m |
| Design (Working) Load | `designLoad` | 80 kN | 17.9847 kip | n, kn, lbf, kip; range 5000–1000000 N |

- **Nominal Bond Strength (qs)**: The grout-to-soil bond strength, from FHWA GEC-7 tables or site-specific pullout testing.
- **Drill Hole Diameter**: The diameter of the drilled hole for the nail and grout.
- **Bonded Length**: The length of the nail bonded (grouted) beyond the potential failure surface.
- **Design (Working) Load**: The nail's design tensile load.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Pull-out safety factor** | 3.53 (target ≥2.0) |
| Pullout capacity | 282.74 kN |

### US customary

| Result | Value |
|---|---|
| **Pull-out safety factor** | 3.56 (target ≥2.0) |
| Pullout capacity | 63.97 kips |

- Confidence: medium.
- The figure is compared against a limit; that is a check of the number, not an approval.

## How it is worked out

The design load on this nail is below the most the grout-to-ground bond would carry at a pullout safety factor of 2.0 shown with it — FHWA's minimum for soil nailing gives it. Site-specific pullout testing can establish a bond strength the assumed value does not. Being under the allowable pressure is not the whole ground question: settlement, groundwater and the footings alongside are all untouched here.

The working the page shows, in order: Pullout capacity; then pull-out safety factor.

The method, derived in full:

- [Fastener Capacity and the Failure Mode That Governs](https://craftquantities.com/methodology/fastener-capacity-modes/): Why an anchor's capacity is the smallest of several modes rather than one number, why concrete breakout grows with embedment to the power of one and a half, and why hole cleaning is the largest variable on site.

What this calculation does not cover:

- This checks the grout-to-ground bond and nothing else. The nail bar's own tensile capacity, the grout-to-steel bond, and the head plate and facing connection are separate checks — a nail can pass this one and still fail by yielding the bar or punching through the shotcrete face.
- It is a check on one nail, not a wall design. Global and sliding stability, bearing at the toe, facing reinforcement and the analysis that produced the design load per nail all sit outside it, and the design load you type in is taken as given rather than tested.
- Only the bonded length beyond the potential failure surface earns capacity, and the calculation cannot locate that surface for you. Enter the whole nail length instead of the portion past the failure plane and the answer is overstated in direct proportion.
- Bond strength is treated as one uniform value along the whole bonded length. Soil layering, change with depth, drilling method, groundwater and grout pressure all move it, and a tabulated figure remains an assumption until verification and proof pull-out tests on site confirm what the ground actually delivers.
- Static, short-term conditions only, and the 2.0 target is the common static minimum. Seismic loading, construction surcharge, creep in fine-grained soils and corrosion over a permanent wall's life are not in the arithmetic, and a project specification or a load-and-resistance-factor design can demand a different margin. This does not replace a geotechnical engineer's design.

A professional must decide:

- Static, short-term conditions only, and the 2.0 target is the common static minimum. Seismic loading, construction surcharge, creep in fine-grained soils and corrosion over a permanent wall's life are not in the arithmetic, and a project specification or a load-and-resistance-factor design can demand a different margin.

## Sources

As the calculator cites them (sources checked 2026-09-06):

- FHWA GEC No. 7 soil nail wall design: pullout capacity = nominal bond strength x pi x drill hole diameter x bonded length; a minimum pullout safety factor of 2.0 is standard practice

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Why does soil nailing need a pullout safety factor specifically?**

Pullout (the grout column sliding out of the surrounding soil) is one of the primary failure modes for a soil nail — the safety factor ensures a comfortable margin between the design load and the actual resistance the bond can provide.

**What if my bonded length seems very long?**

Weaker soils (lower bond strength) need proportionally longer bonded lengths to develop the same capacity — this is normal and expected in soft or loose soil conditions.

**Should I always use FHWA GEC-7 bond strength values?**

They're a reasonable starting point for preliminary design, but site-specific pullout testing (required on most soil nail projects before or during production) gives a much more reliable bond strength value for your actual soil and installation method.

## Related calculators

- [Retaining Wall Preliminary Stability Check](https://craftquantities.com/calculators/materials-quantities/retaining-wall-stability-calculator/)
- [Geogrid Reinforcement Layer Count Calculator](https://craftquantities.com/calculators/materials-quantities/geogrid-layer-count-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/soil-nail-pullout-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/soil-nail-pullout-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `soil-nail-pullout-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/soil-nail-pullout-calculator.json

---
Source: https://craftquantities.com/calculators/heavy-civil/soil-nail-pullout-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.