# Labor Cost Calculator

> Estimate total labor cost from hours, hourly rate, and crew size.

Page: https://craftquantities.com/calculators/financial-adjacent/labor-cost-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.1, sources checked 2026-09-05, 2 published test vectors.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Estimated Hours | `estimatedHours` | 40 | 40 | range 0.5–2000 |
| Hourly Rate | `hourlyRate` | blank (your own rate) | blank (your own rate) | range 5–500 |
| Crew Size | `crewSize` | 1 | 1 | range 1–30 |

- **Estimated Hours**: The total hours the job is expected to take, per worker.
- **Hourly Rate**: The rate charged (or paid) per worker, per hour.
- **Crew Size**: The number of workers billed at this hourly rate.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Total crew-hours** | 40 hours |

### US customary

| Result | Value |
|---|---|
| **Total crew-hours** | 40 hours |

- Confidence: medium.
- Withheld until you enter: Hourly Rate. The site publishes no prices.

## How it is worked out

The method, derived in full:

- [Unit-Rate Estimating, Markup and Contingency](https://craftquantities.com/methodology/unit-rate-estimating-and-markup/): Why a 20% markup is not a 20% margin, why an estimate without a range is the wrong shape of answer, and why contingency should shrink as a design develops rather than staying at ten per cent forever.

What this calculation does not cover:

- One rate is multiplied across every hour and every worker, so there is no tier for overtime or holiday premiums, night and weekend differentials, or a crew that pairs a licensed lead with an apprentice — a mixed-rate job has to be totalled in separate runs and added by hand.
- Crew size acts as a straight multiplier on the hours you entered, which assumes each additional worker stays productive for the full duration: the tasks that will not split across two pairs of hands, the time a crew loses coordinating, and the helper who is only on site for part of the week all leave the total untouched.
- Nothing distinguishes a wage you pay from a rate you are charged, because the same multiplication runs on either. A figure built from raw wages carries no payroll taxes, workers' compensation, insurance or benefits on top of it, while a contractor's quoted rate may already have overhead and profit buried inside — the answer looks identical in both cases.
- Only worked hours are priced. Travel and mobilization, setup and clean-up, tool or equipment hire, disposal, permits and materials all sit outside the figure, and no minimum charge is imposed either — an entry of half an hour returns half an hour of money on a job many trades would bill as a minimum visit.
- The hours you type are taken exactly as they stand, with no contingency for rework, weather, waiting on an inspection or scope that grows once the walls are open, and the rate is held flat for the whole span — a long program approaching the 2,000-hour entry ceiling is still priced at today's number, with no escalation partway through.

A professional must decide:

- One rate is multiplied across every hour and every worker, so there is no tier for overtime or holiday premiums, night and weekend differentials, or a crew that pairs a licensed lead with an apprentice — a mixed-rate job has to be totalled in separate runs and added by hand.

## Sources

As the calculator cites them (sources checked 2026-09-05):

- Total labor cost = estimated hours x hourly rate x crew size

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Does this include materials cost?**

No — this is labor only. Use the Renovation Budget Calculator or Cost Per Square Foot Calculator alongside this one to build a fuller project estimate, or add material line items in the Project Builder.

**Should I use my own hours or the total crew-hours?**

Enter the hours the job takes per worker (i.e. the job's duration), not the total crew-hours — this calculator multiplies by crew size for you.

**How do I account for overtime rates?**

Run this calculator twice — once for regular hours at the standard rate, once for overtime hours at the overtime rate — and add the two totals together.

## Related calculators

- [Renovation Budget Calculator](https://craftquantities.com/calculators/financial-adjacent/renovation-budget-calculator/)
- [Cost Per Square Foot Calculator](https://craftquantities.com/calculators/financial-adjacent/cost-per-square-foot-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/labor-cost-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/labor-cost-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `labor-cost-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/labor-cost-calculator.json

---
Source: https://craftquantities.com/calculators/financial-adjacent/labor-cost-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.