Project cost, material cost, labor-hour and programme estimators — arithmetic only, not financial advice.

- 45 Calculators
- 3 Families
- 9 Method papers cited

Find in Financial-Adjacent

- [By material:](https://craftquantities.com/materials/)
- [Concrete](https://craftquantities.com/materials/concrete/)
- [Drywall](https://craftquantities.com/materials/drywall/)
- [Lumber](https://craftquantities.com/materials/lumber/)
- [Roofing](https://craftquantities.com/materials/roofing/)
- [Insulation](https://craftquantities.com/materials/insulation/)
- [Paint](https://craftquantities.com/materials/paint/)
- [Tile](https://craftquantities.com/materials/tile/)
- [Masonry](https://craftquantities.com/materials/masonry/)
- [Gravel](https://craftquantities.com/materials/gravel/)
- [Asphalt](https://craftquantities.com/materials/asphalt/)
- [Steel](https://craftquantities.com/materials/steel/)

None of these calculators contains a market rate, and that is deliberate. There is no honest national average cost per square metre: the figure varies by a factor of four across regions, moves every quarter, and a site that publishes one is inviting people to budget against a number that was never true for their project. Every rate here is yours to supply.

What these pages contribute instead is structure — the order in which contingency, professional fees and tax compound, the elements that are routinely left out of a builder's quote, and the difference between a material cost and a client price. Someone holding one quote and this structure can work out what the quote does not cover, which is usually the question they actually have. This is arithmetic on figures you enter, not regulated financial advice.

The same rule holds for time. The programme calculators turn a quantity and your crew's output into a duration, link activities into a critical path, count working days into calendar days and apply a learning curve to repeated work — and none of them carries a productivity rate, because a crew's output varies too much with the work, the site and the weather for a published average to be honest.

## 3 families in Financial-Adjacent

Every calculator in this category sits in one of these. Open the family and the page says what it covers, what decides between its tools, and what it does not.

### [Job costs & budgets](https://craftquantities.com/calculators/financial-adjacent/family/job-costs-and-budgets/)

What the work costs to price, buy and run: unit rates, whole-project budgets and the running costs after.

22 calculators

### [Home finance, tax & insurance](https://craftquantities.com/calculators/financial-adjacent/family/home-finance-tax-and-insurance/)

Buying, borrowing against and insuring a home: payments, affordability, transfer taxes and cover.

12 calculators

### [Programme & project controls](https://craftquantities.com/calculators/financial-adjacent/family/programme-and-project-controls/)

Time and money on a job that is already running: durations, the critical path, valuations and what a delay costs.

11 calculators

## Most used in Financial-Adjacent

### [Renovation Budget Calculator](https://craftquantities.com/calculators/financial-adjacent/renovation-budget-calculator/)

Add up materials, labor, permits, and a contingency buffer into one project budget total. Pure arithmetic — not financial advice.

### [Labor Cost Calculator](https://craftquantities.com/calculators/financial-adjacent/labor-cost-calculator/)

Estimate total labor cost from hours, hourly rate, and crew size.

### [Contractor Markup Calculator](https://craftquantities.com/calculators/financial-adjacent/contractor-markup-calculator/)

Calculate the total price to charge a client by applying a markup to material and labor costs.

### [Project Contingency Calculator](https://craftquantities.com/calculators/financial-adjacent/project-contingency-calculator/)

Add a contingency buffer to your base project budget to cover unexpected costs and overruns.

### [Deck Cost Calculator](https://craftquantities.com/calculators/financial-adjacent/deck-cost-calculator/)

Build a deck budget from its actual parts — surface, railing, footings and stairs — rather than one rate per square metre.

Metric

## The methods behind these numbers

- [Unit-Rate Estimating, Markup and Contingency](https://craftquantities.com/methodology/unit-rate-estimating-and-markup/)cited by 16 calculators here
- [Break-Even, Payback and Comparing Costs Over Time](https://craftquantities.com/methodology/break-even-payback-and-life-cycle-cost/)cited by 10 calculators here
- [Interim Valuations, Variations and the Cost of Delay](https://craftquantities.com/methodology/payment-variations-and-delay/)cited by 5 calculators here
- [Programme Arithmetic: Durations, Float, Calendars and Learning](https://craftquantities.com/methodology/programme-arithmetic/)cited by 4 calculators here

---