# Transformer Sizing Calculator

> Estimate the minimum transformer kVA rating needed for a given connected electrical load.

Page: https://craftquantities.com/calculators/electrical/transformer-sizing-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.1, sources checked 2026-09-02, 2 published test vectors.

Recommended transformer size: 15 kVA for Total Connected Load 10000 and Power Factor 0.8, the page's opening figures. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Total Connected Load (W) | `totalConnectedWatts` | 10000 | 10000 | range 500–500000 |
| Power Factor | `powerFactor` | 0.8 | 0.8 | range 0.5–1 |

- **Total Connected Load (W)**: The sum of the wattage of everything the transformer will serve.
- **Power Factor**: How efficiently the load uses apparent power — 1.0 is purely resistive, motors and electronics are typically lower.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Recommended transformer size** | 15 kVA |
| Minimum required capacity | 12.5 kVA |

### US customary

| Result | Value |
|---|---|
| **Recommended transformer size** | 15 kVA |
| Minimum required capacity | 12.5 kVA |

- Confidence: medium.

## How it is worked out

This is a planning estimate — final transformer sizing for a real installation should be confirmed by an electrical engineer or your utility, accounting for load diversity, future growth, and inrush current from large motors.

The working the page shows, in order: Minimum required capacity; then recommended transformer size.

The method, derived in full:

- [Electrical Demand, Three-Phase Power and Panel Capacity](https://craftquantities.com/methodology/electrical-demand-and-panel-capacity/): Why the sum of every nameplate is a load no building ever draws, why a motor's conductors are sized from a table rather than from its nameplate, and why a dark room needs far more light than a pale one for the same lux.

What this calculation does not cover:

- This is a watts-to-kVA conversion of the connected load, not a code load calculation. It applies no demand or diversity factors and no continuous-load multiplier, so it does not produce the load figure an inspector or the serving utility will ask for, and it does not size the primary or secondary overcurrent protection, conductors or grounding that the transformer still needs.
- No headroom for growth is included. The result is the smallest listed standard size that covers today's connected load exactly, so if you want the spare capacity the FAQ describes you have to add it to the load figure yourself before entering it.
- Motor starting is not modelled. Inrush and locked-rotor current can dip the voltage unacceptably on a transformer that is entirely adequate for the running load, and sizing for a large motor, welder or compressor start is a separate calculation this does not perform.
- Phase, voltage, impedance and derating are outside the model. It never asks single- or three-phase, and the standard-size list it selects from is a generic distribution series — three-phase dry-type units are commonly built in sizes that are not on it, and nameplate kVA is a rating at a stated ambient and altitude that this makes no adjustment for.
- One power factor is applied to the entire load. A mixed installation has a different power factor on each branch, and if the figure you have is already in VA or kVA rather than real watts, dividing it by power factor again oversizes the answer.

A professional must decide:

- This is a watts-to-kVA conversion of the connected load, not a code load calculation. It applies no demand or diversity factors and no continuous-load multiplier, so it does not produce the load figure an inspector or the serving utility will ask for, and it does not size the primary or secondary overcurrent protection, conductors or grounding that the transformer still needs.
- Electrics: circuit design, protection, cable sizing and the work itself are for a qualified or licensed electrician, under the rules where you build.

## Sources

As the calculator cites them (sources checked 2026-09-02):

- Required kVA = connected watts / 1,000 / power factor; standard distribution transformer sizes commonly include 5, 10, 15, 25, 37.5, 50, 75, 100, 150, and 225 kVA

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Why does power factor matter for sizing?**

A transformer is rated in kVA (apparent power), not kW (real power) — loads with a lower power factor (like motors) draw more apparent power for the same real wattage, so a lower power factor requires a larger transformer for the same connected watts.

**Should I size for today's load or future growth?**

Many electrical designers add headroom (often 20-25%) beyond the current connected load specifically to accommodate future additions, since replacing an undersized transformer later is far more disruptive than installing slightly larger capacity upfront.

**Is this for a whole utility service or a specific piece of equipment?**

This estimates general transformer capacity for a connected load — sizing for a specific application (like a dedicated machine, an outbuilding, or a full utility service) should also account for that context's specific code requirements and inrush current characteristics.

## Related calculators

- [Electrical Circuit Load Calculator](https://craftquantities.com/calculators/electrical/electrical-load-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/transformer-sizing-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/transformer-sizing-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `transformer-sizing-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/transformer-sizing-calculator.json

---