# Generator Sizing Calculator

> Estimate the minimum running-watt capacity a backup generator needs for your household loads.

Page: https://craftquantities.com/calculators/electrical/generator-sizing-calculator/ (calculator). This is the page's Markdown copy; the HTML page is the canonical version.

Version 1.0.1, sources checked 2026-09-02, 2 published test vectors.

Recommended generator size: 6,600 W (recommended generator rating) for Total Running Watts 3500, Largest Motor's Additional Starting Surge 2000 and Safety Margin 20, the page's opening figures. Sources are cited below.

## Inputs

A length, area or volume is entered with its unit. The page opens on the values below: a metric reader sees the metric column, a US customary reader the other.

| Input | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Total Running Watts | `totalRunningWatts` | 3500 | 3500 | range 100–20000 |
| Largest Motor's Additional Starting Surge | `additionalSurgeWatts` | 2000 | 2000 | range 0–15000 |
| Safety Margin (%) | `safetyMarginPercent` | 20 | 20 | range 0–50 |

- **Total Running Watts**: The sum of the running wattage of everything you'd want powered at once.
- **Largest Motor's Additional Starting Surge**: The extra surge (beyond its own running watts) needed to start your single largest motor.
- **Safety Margin (%)**: Extra headroom so the generator isn't run at its absolute maximum continuously.

## The answer on the opening values

Worked exactly as the page works it, on the values each system opens on.

### Metric

| Result | Value |
|---|---|
| **Recommended generator size** | 6,600 W (recommended generator rating) |
| Total running watts | 3,500 W |
| Peak (with largest surge) | 5,500 W |

### US customary

| Result | Value |
|---|---|
| **Recommended generator size** | 6,600 W (recommended generator rating) |
| Total running watts | 3,500 W |
| Peak (with largest surge) | 5,500 W |

- Confidence: medium.

## How it is worked out

This is a rule-of-thumb estimate. For whole-home standby systems, an electrician performs a full load calculation accounting for which circuits can run simultaneously.

The working the page shows, in order: Total running watts; Peak (with largest surge); then recommended generator size.

The method, derived in full:

- [Electrical Demand, Three-Phase Power and Panel Capacity](https://craftquantities.com/methodology/electrical-demand-and-panel-capacity/): Why the sum of every nameplate is a load no building ever draws, why a motor's conductors are sized from a table rather than from its nameplate, and why a dark room needs far more light than a pale one for the same lux.

What this calculation does not cover:

- A generator carries two ratings - the watts it holds continuously and a higher surge it absorbs for a second or two - and this returns one number without saying which of the two to compare it against. Alternators are rated in kVA at a stated power factor, and a stalled motor's inrush arrives at a very poor one, so clearing a watt total is not the same as clearing the motor-starting column on the same spec sheet.
- Only the largest single surge is counted, on the assumption that two motors never start in the same instant. Nothing here enforces that: a well pump, a septic pump and a condenser that can all call together need all three surges, and after a transfer the whole building restarts at once. Where load-shed or sequencing controls are what make the single-surge assumption true, those controls have become part of the sizing.
- No voltage or frequency dip is calculated. Sets usually fail a motor start by sagging rather than by overloading - contactors drop out and drive buses undervolt while the engine is barely loaded - and how deep a dip a machine rides through depends on its alternator and excitation, which two sets carrying the same badge kW do not share.
- The answer is a required capacity, not a rating you can read straight off a badge. Engine output falls with altitude and intake air temperature, a set rated on propane delivers less on natural gas, and standby, prime and continuous are different ratings of the same machine - compare this figure against the rating that matches your duty and site conditions.
- This is not an electrical load calculation, and it says nothing about the installation. Sizing a dwelling's service by the code's demand-factor rules, the transfer switch rating, and the neutral bonding and backfeed protection that keep a running set off the utility's lines are separate work for a licensed electrician.

A professional must decide:

- This is not an electrical load calculation, and it says nothing about the installation. Sizing a dwelling's service by the code's demand-factor rules, the transfer switch rating, and the neutral bonding and backfeed protection that keep a running set off the utility's lines are separate work for a licensed electrician.
- Electrics: circuit design, protection, cable sizing and the work itself are for a qualified or licensed electrician, under the rules where you build.

## Sources

As the calculator cites them (sources checked 2026-09-02):

- Standard sizing rule of thumb: generator capacity >= sum of all running watts running simultaneously, plus the largest single motor's additional starting-surge watts (beyond its own running watts), plus a safety margin

A code or standard has force only where a jurisdiction has adopted it, usually with local amendments; check what is in force with the authority where you build.

## Questions answered on the page

**Why only count the largest motor's surge, not every motor's?**

Motors briefly surge only for the second or two it takes to start, and it's uncommon for multiple large motors to start at the exact same instant — sizing for the single largest surge on top of everything else running is the standard practical approach.

**Should I size for every circuit in my house?**

Only if you want true whole-home coverage. Most portable and mid-size standby generators are sized for essential circuits only (fridge, some lights, furnace blower, a few outlets) — decide what you actually need powered during an outage first.

**Is a bigger generator always better?**

Not necessarily — oversizing costs more upfront and burns more fuel per hour even at partial load. This calculator estimates the minimum recommended size; going moderately above it for headroom is reasonable, but extreme oversizing has diminishing returns.

## Related calculators

- [Electrical Circuit Load Calculator](https://craftquantities.com/calculators/electrical/electrical-load-calculator/)

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/calculate/generator-sizing-calculator` with each input as a query parameter, a length, area or volume with its unit; `https://api.craftquantities.com/v1/describe/generator-sizing-calculator` lists the inputs.
- MCP: the `calculate` tool at https://api.craftquantities.com/mcp with `slug` `generator-sizing-calculator`.
- Definition and test vectors: https://craftquantities.com/api/v1/calculators/generator-sizing-calculator.json

---
Source: https://craftquantities.com/calculators/electrical/generator-sizing-calculator/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.