# Strip footing takeoff

> Concrete, backfill and reinforcement for a continuous footing under a wall.

Page: https://craftquantities.com/build/strip-footing/ (whole-job takeoff). This is the page's Markdown copy; the HTML page is the canonical version.

## Measurements

Each length, area or volume is entered with its unit; one left out opens at the figure shown.

| Measurement | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Footing length | `footingLength` | 30 m | 98 ft | mm, cm, m, in, ft, yd |
| Footing width | `footingWidth` | 0.6 m | 2 ft | mm, cm, m, in, ft, yd |
| Footing depth | `footingDepth` | 300 mm | 11.75 in | mm, cm, m, in, ft, yd |
| Trench depth | `trenchDepth` | 0.9 m | 3 ft | mm, cm, m, in, ft, yd |
| Wall thickness below ground | `wallThickness` | 200 mm | 7.75 in | mm, cm, m, in, ft, yd |

- **Trench depth**: From the ground to the underside of the footing, so at least the footing depth: the backfill row fills the difference round the wall, and a trench-fill footing, where the two are equal, has no backfill row.
- **Wall thickness below ground**: The wall that stands on the footing and rises through the backfill; its width comes off the fill. The default, about 200 mm (8 in), suits a block about 190 mm (7 5/8 in) thick or a 215 mm (8 1/2 in) one-brick wall; a cavity wall is nearer 300 mm (12 in).

## Quantities on the opening figures

Worked as the takeoff page works them, each row by its own calculator.

### Metric

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Continuous Footing / Grade Beam Volume | 5.67 m³ |  | Continuous Footing / Grade Beam Volume Calculator |
| Trench Excavation & Backfill Volume | 8.28 m³ (loose) |  | Trench Excavation & Backfill Volume Calculator |
| Rebar | 10 x 12 m sticks |  | Rebar Calculator |

### US customary

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Continuous Footing / Grade Beam Volume | 7.46 yd³ |  | Continuous Footing / Grade Beam Volume Calculator |
| Trench Excavation & Backfill Volume | 11.4 yd³ |  | Trench Excavation & Backfill Volume Calculator |
| Rebar | 19 x 20 ft sticks |  | Rebar Calculator |

## Calculators it runs

- [Continuous Footing / Grade Beam Volume Calculator](https://craftquantities.com/calculators/materials-quantities/continuous-footing-grade-beam-calculator/)
- [Trench Excavation & Backfill Volume Calculator](https://craftquantities.com/calculators/materials-quantities/trench-excavation-backfill-calculator/)
- [Rebar Calculator](https://craftquantities.com/calculators/materials-quantities/rebar-calculator/)

## Not counted

- The depth the ground actually requires — frost, clay shrinkage, trees and made ground all govern it and none of them is in these figures.
- The reinforcement schedule. The row here is a mesh-equivalent across the plan, not the longitudinal bars and links a footing is really built from.
- Formwork, which a trench-poured footing may not need and a stepped or above-ground one certainly does.
- Muck-away. The dig is an in-situ volume — the footing's length by its width by the trench depth, which no row totals — and what leaves the site is bulked up by a quarter or more.
- Dewatering, and any ground improvement the inspection turns out to require.

## Frequently asked questions

**What does the strip footing takeoff give for a typical job?**

Opened at Footing length 30 m · Footing width 0.6 m · Footing depth 300 mm · Trench depth 0.9 m · Wall thickness below ground 200 mm, it orders: Continuous Footing / Grade Beam Volume, 5.67 m³; Trench Excavation & Backfill Volume, 8.28 m³ (loose); Rebar, 10 x 12 m sticks. Opened at Footing length 98 ft · Footing width 2 ft · Footing depth 11.8 in · Trench depth 3 ft · Wall thickness below ground 7.75 in: Continuous Footing / Grade Beam Volume, 7.46 yd³; Trench Excavation & Backfill Volume, 11.4 yd³; Rebar, 19 x 20 ft sticks. Every figure follows the dimensions you give it.

**Which calculators does the strip footing takeoff run?**

3 calculators, one to a line: Continuous Footing / Grade Beam Volume Calculator, Trench Excavation & Backfill Volume Calculator, Rebar Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.

**What does the strip footing takeoff leave out?**

5 things, each named on this page: The depth the ground actually requires; The reinforcement schedule; Formwork, which a trench-poured footing may not need and a stepped or above-ground one certainly does; Muck-away; Dewatering, and any ground improvement the inspection turns out to require.

**Can I check a quote for this job against the takeoff?**

Yes. The strip footing quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/takeoff/strip-footing` describes it; `https://api.craftquantities.com/v1/takeoff/strip-footing/run` works it, measurements with their units.
- MCP: the `get_takeoff` and `run_takeoff` tools at https://api.craftquantities.com/mcp with `takeoff` `strip-footing`.

---
Source: https://craftquantities.com/build/strip-footing/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.