# Shower enclosure takeoff

> Tanking, backer board, tile and adhesive for the walls and tray area of a shower.

Page: https://craftquantities.com/build/shower-enclosure/ (whole-job takeoff). This is the page's Markdown copy; the HTML page is the canonical version.

## Measurements

Each length, area or volume is entered with its unit; one left out opens at the figure shown.

| Measurement | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Tiled wall run | `wallRun` | 2.7 m | 9 ft | mm, cm, m, in, ft, yd |
| Tiled height | `height` | 2 m | 6.5 ft | mm, cm, m, in, ft, yd |
| Tray width | `trayWidth` | 0.9 m | 3 ft | mm, cm, m, in, ft, yd |
| Tray depth | `trayDepth` | 0.9 m | 3 ft | mm, cm, m, in, ft, yd |
| Tanked wall run | `tankedRun` | 2.7 m | 9 ft | mm, cm, m, in, ft, yd |
| Tanked height | `tankedHeight` | 2 m | 6.5 ft | mm, cm, m, in, ft, yd |
| Internal corners in the tanked zone | `corners` | 2 | 2 | a number |
| Pipe penetrations through the membrane | `penetrations` | 3 | 3 | a number |

- **Tiled wall run**: Add the widths of every wall being tiled.
- **Tanked wall run**: Add the widths of the walls the shower can wet: usually the walls around the tray, not every tiled wall in the room.
- **Tanked height**: The height the membrane's specification asks for, usually well above the shower head; the ceiling only where the design says so.
- **Internal corners in the tanked zone**: Vertical wall-to-wall corners: two in an alcove, one in a corner shower. Each takes tape for the full tanked height.
- **Pipe penetrations through the membrane**: Every supply pipe and valve body that passes through the wall membrane. A mixer valve is usually two and a riser one. Each takes a preformed collar, which the tanking row counts; the tape runs along the junctions only. Leave the tray's waste out: it is sealed with the tray or former, which this takeoff does not include.

## Quantities on the opening figures

Worked as the takeoff page works them, each row by its own calculator.

### Metric

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Wet Room Tanking and Waterproof Membrane | 13 litres |  | Wet Room Tanking and Waterproof Membrane Calculator |
| Tile Backer Board | 7 boards |  | Tile Backer Board Calculator |
| Tile & Grout | 66 tiles |  | Tile & Grout Calculator |
| Thinset & Tile Adhesive | 2 bags |  | Thinset & Tile Adhesive Calculator |

### US customary

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Wet Room Tanking and Waterproof Membrane | 3.4 gal |  | Wet Room Tanking and Waterproof Membrane Calculator |
| Tile Backer Board | 7 boards |  | Tile Backer Board Calculator |
| Tile & Grout | 65 tiles |  | Tile & Grout Calculator |
| Thinset & Tile Adhesive | 2 bags |  | Thinset & Tile Adhesive Calculator |

## Calculators it runs

- [Wet Room Tanking and Waterproof Membrane Calculator](https://craftquantities.com/calculators/materials-quantities/wet-room-tanking-calculator/)
- [Tile Backer Board Calculator](https://craftquantities.com/calculators/renovation-construction/backer-board-calculator/)
- [Tile & Grout Calculator](https://craftquantities.com/calculators/renovation-construction/tile-grout-calculator/)
- [Thinset & Tile Adhesive Calculator](https://craftquantities.com/calculators/renovation-construction/thinset-mortar-calculator/)

## Not counted

- The tray, former, screen, door and waste.
- The fall in the floor, which a tray sets and a wet room has to be built into.
- Grout as an order. The tile row's breakdown gives a rough bag count, the tiled area at about 7 m² (75 sq ft) a bag, which does not look at the tile size or the joint width; the real quantity depends on both, so check it against the grout maker's coverage chart for your tile and joint.
- Any pipework, valve or thermostatic mixer behind the wall.
- Primer, which absorbent substrates need and cement backer board often does not; apply the maker's rate to the tanked area in the tanking row's breakdown.

## Frequently asked questions

**What does the shower enclosure takeoff give for a typical job?**

Opened at Tiled wall run 2.7 m · Tiled height 2 m · Tray width 0.9 m · Tray depth 0.9 m · Tanked wall run 2.7 m · Tanked height 2 m · Internal corners in the tanked zone 2 · Pipe penetrations through the membrane 3, it orders: Wet Room Tanking and Waterproof Membrane, 13 litres; Tile Backer Board, 7 boards; Tile & Grout, 66 tiles; Thinset & Tile Adhesive, 2 bags. Opened at Tiled wall run 9 ft · Tiled height 6.5 ft · Tray width 3 ft · Tray depth 3 ft · Tanked wall run 9 ft · Tanked height 6.5 ft · Internal corners in the tanked zone 2 · Pipe penetrations through the membrane 3: Wet Room Tanking and Waterproof Membrane, 3.4 gal; Tile Backer Board, 7 boards; Tile & Grout, 65 tiles; Thinset & Tile Adhesive, 2 bags. Every figure follows the dimensions you give it.

**Which calculators does the shower enclosure takeoff run?**

4 calculators, one to a line: Wet Room Tanking and Waterproof Membrane Calculator, Tile Backer Board Calculator, Tile & Grout Calculator, Thinset & Tile Adhesive Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.

**What does the shower enclosure takeoff leave out?**

5 things, each named on this page: The tray, former, screen, door and waste; The fall in the floor, which a tray sets and a wet room has to be built into; Grout as an order; Any pipework, valve or thermostatic mixer behind the wall; Primer, which absorbent substrates need and cement backer board often does not; apply the maker's rate to the tanked area in the tanking row's breakdown.

**Can I check a quote for this job against the takeoff?**

Yes. The shower enclosure quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/takeoff/shower-enclosure` describes it; `https://api.craftquantities.com/v1/takeoff/shower-enclosure/run` works it, measurements with their units.
- MCP: the `get_takeoff` and `run_takeoff` tools at https://api.craftquantities.com/mcp with `takeoff` `shower-enclosure`.

---
Source: https://craftquantities.com/build/shower-enclosure/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.