# Pitched roof re-covering takeoff

> Strip a pitched roof to its rafters and cover it again: the scaffold, the underlay, battens and tiles or slates (or shingles on a deck), the eaves and ridge ventilation, the flashings and pipe flashings, the fascia and gutters if they are renewed, and the skip, with the rafters flagged and never sized.

Page: https://craftquantities.com/build/pitched-roof-recovering/ (whole-job takeoff). This is the page's Markdown copy; the HTML page is the canonical version.

## Measurements

Each length, area or volume is entered with its unit; one left out opens at the figure shown.

| Measurement | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Roof length on plan, along the ridge | `footprintLength` | 9 m | 30 ft | mm, cm, m, in, ft, yd |
| Roof width on plan, eave to eave | `footprintWidth` | 7.5 m | 25 ft | mm, cm, m, in, ft, yd |
| Roof pitch (rise per 12) | `pitch` | 8 | 8 | a number |
| Slope factor | `slopeFactor` | 1.202 | 1.202 | a number |
| Height to the eaves | `eaveHeight` | 5 m | 16.5 ft | mm, cm, m, in, ft, yd |
| Length where the roof meets a wall or chimney | `abutmentLength` | 4 m | 13 ft | mm, cm, m, in, ft, yd |
| Pipes and flues through the roof | `penetrations` | 1 | 1 | a number |
| Loose depth of the old covering, stripped | `stripDepth` | 40 mm | 1.5 in | mm, cm, m, in, ft, yd |
| Eaves with an ice barrier | `iceBarrierEaves` | 0 | 0 | a number |
| Eaves edge to the inside face of the wall | `iceReach` | 0.6 m | 2 ft | mm, cm, m, in, ft, yd |

- **Roof length on plan, along the ridge**: Verge to verge (rake to rake), the overhang at each gable end included. The ridge is this long, and so is each eave.
- **Roof width on plan, eave to eave**: From the edge of one eave to the edge of the other, both overhangs included, measured on plan rather than up the slope.
- **Roof pitch (rise per 12)**: The rise over a run of 12, which the ice barrier and shingle rows take. In degrees: 30° is 6.9 in 12, 35° is 8.4, 40° is 10.1 and 45° is 12.
- **Slope factor**: Roof area on the slope ÷ plan area, for the pitch above: 1.155 at 30°, 1.202 at 8 in 12, 1.221 at 35°, 1.305 at 40°, 1.414 at 45°. The underlay, batten, tile and skip rows take it, so keep it matched to the pitch.
- **Height to the eaves**: From the ground to the eaves, where the scaffold's top lift is set.
- **Length where the roof meets a wall or chimney**: Every length that takes a flashing: round a chimney stack (the apron, both sides and the back gutter), along a wall the roof butts against, and up a dormer's sides. 0 where there is none.
- **Pipes and flues through the roof**: Soil vent pipes, flues and extract vents that come up through the covering. A chimney stack is a length above, not a count here.
- **Loose depth of the old covering, stripped**: The loose volume the strip makes for each square metre (square foot) of roof: broken tiles or slates, battens and felt. Concrete tiles are the heaviest and bulkiest; a slate or shingle roof makes less.
- **Eaves with an ice barrier**: 2 on a gable where the local code asks for an ice barrier at the eaves, as the US model code does for shingles, tile and slate where ice dams form; 0 where it does not, as in Britain. 0 leaves the ice barrier row out and runs the underlay over the whole roof.
- **Eaves edge to the inside face of the wall**: On plan, from the edge of the eaves to the inside face of the outside wall: the overhang and the wall together. The ice barrier runs 24 in (610 mm) past that face. Used only where an eave takes one.

## Build-up choices

| Choice | id | Options | Opens on (metric / US customary) |
|---|---|---|---|
| Covering | `covering` | Concrete or clay interlocking tiles (`interlocking`); Natural slate (`slate`); Clay barrel (Spanish or mission) tiles (`barrel`); Asphalt shingles on a boarded deck (`shingles`) | `interlocking` / `shingles` |
| Tile, slate and flashing sizes | `sizes` | Metric: 300 mm cover tile at a 345 mm gauge, 500 × 250 mm slate, lead in 1.5 m pieces (`metric`); US: 12 in cover tile at a 13 1/2 in exposure, 20 × 10 in slate, flashing in 10 ft pieces (`us`) | `metric` / `us` |
| Fascia and gutters | `eaves` | Keep the fascia and gutters (`keep`); Renew the fascia and gutters (`renew`) | `keep` / `keep` |

## Quantities on the opening figures

Worked as the takeoff page works them, each row by its own calculator.

### Metric

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Dust sheets (drop cloths) in the loft (attic) | 7 items |  | Masking and Protection Materials Calculator |
| Scaffold along the first eave | 45 m² of face |  | Scaffold Face Area and Hire Quantity Calculator |
| Scaffold along the second eave | 45 m² of face |  | Scaffold Face Area and Hire Quantity Calculator |
| Underlay (felt, membrane or underlayment) | 1 rolls |  | Roofing Underlayment Calculator |
| Eaves vent trays (rafter baffles) | 30 baffles |  | Attic Rafter Baffle/Chute Count Calculator |
| Batten rows, each slope | 15 rows |  | Roof Batten Spacing Calculator (Tile Roofing) |
| Nails and clips (fixings) | 1,976 fixings |  | Roof Covering Fixing Calculator |
| Ventilated ridge (ridge vent) | 9.45 m |  | Ridge Vent Linear Footage Calculator |
| Pipe flashings (collars or boots) for soil and vent pipes | 2 boots |  | Roof Vent Pipe Boot Count Calculator |
| Abutment flashing at walls and the chimney (lead or step flashing) | 3 sheets |  | Exterior Flashing Layout Trim Sheet Calculator |
| Skip (dumpster) for the old covering | 3.25 m³ |  | Skip & Dumpster Size Calculator |

### US customary

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Dust sheets (drop cloths) in the loft (attic) | 7 items |  | Masking and Protection Materials Calculator |
| Scaffold along the first eave | 495 sq ft of face |  | Scaffold Face Area and Hire Quantity Calculator |
| Scaffold along the second eave | 495 sq ft of face |  | Scaffold Face Area and Hire Quantity Calculator |
| Underlay (felt, membrane or underlayment) | 1 rolls |  | Roofing Underlayment Calculator |
| Eaves vent trays (rafter baffles) | 30 baffles |  | Attic Rafter Baffle/Chute Count Calculator |
| Shingles, in squares | 9.92 squares |  | Roof Squares Calculator |
| Ventilated ridge (ridge vent) | 31.5 ft |  | Ridge Vent Linear Footage Calculator |
| Ridge cap shingles | 1 bundles |  | Roof Ridge Cap Calculator |
| Pipe flashings (collars or boots) for soil and vent pipes | 2 boots |  | Roof Vent Pipe Boot Count Calculator |
| Abutment flashing at walls and the chimney (lead or step flashing) | 2 sheets |  | Exterior Flashing Layout Trim Sheet Calculator |
| Skip (dumpster) for the old covering | 4.17 yd³ |  | Skip & Dumpster Size Calculator |

## Calculators it runs

- [Masking and Protection Materials Calculator](https://craftquantities.com/calculators/renovation-construction/masking-and-protection-calculator/)
- [Scaffold Face Area and Hire Quantity Calculator](https://craftquantities.com/calculators/materials-quantities/scaffold-face-area-calculator/)
- [Roofing Underlayment Calculator](https://craftquantities.com/calculators/renovation-construction/roofing-underlayment-calculator/)
- [Attic Rafter Baffle/Chute Count Calculator](https://craftquantities.com/calculators/materials-quantities/attic-baffle-count-calculator/)
- [Roof Batten Spacing Calculator (Tile Roofing)](https://craftquantities.com/calculators/materials-quantities/roof-batten-spacing-calculator/)
- [Roof Covering Fixing Calculator](https://craftquantities.com/calculators/renovation-construction/roof-covering-fixing-calculator/)
- [Ridge Vent Linear Footage Calculator](https://craftquantities.com/calculators/materials-quantities/ridge-vent-linear-footage-calculator/)
- [Roof Vent Pipe Boot Count Calculator](https://craftquantities.com/calculators/materials-quantities/roof-vent-boot-calculator/)
- [Exterior Flashing Layout Trim Sheet Calculator](https://craftquantities.com/calculators/materials-quantities/flashing-trim-sheet-calculator/)
- [Skip & Dumpster Size Calculator](https://craftquantities.com/calculators/auto-utility/skip-and-dumpster-size-calculator/)
- [Roof Squares Calculator](https://craftquantities.com/calculators/renovation-construction/roof-squares-calculator/)
- [Roof Ridge Cap Calculator](https://craftquantities.com/calculators/renovation-construction/roof-ridge-cap-calculator/)

## Not counted

- Strengthening the rafters, purlins or wall plates, and whether they carry a covering heavier than the old one. Timber found decayed is a provisional repair item; how it is repaired, and whether the roof takes the new weight, is for an engineer or building control, and the page sizes no member.
- Insulation the regulations may call for when the roof is renewed. In England, re-covering more than a quarter of a roof is renovating a thermal element, and the loft or the rafters are then brought up to today's standard wherever that is practical; what is needed is agreed with building control before the roof is closed, and it is neither listed nor measured here.
- Bat surveys, and any licence needed where bats roost in the roof.
- Chimney repairs and rebuilds: repointing, new pots, a cowl or a rebuilt stack. The flashings round a stack are counted; the stack itself is not.
- Taking down and recommissioning a solar PV array, which is its installer's work, and moving or shrouding an overhead supply cable at the eaves, which is the network operator's or the utility's. Aerials, dishes and alarm boxes are set aside and refixed, and nothing more.
- Work where the roof meets a neighbour's across a party wall, and any notice it needs (in England and Wales, under the Party Wall etc. Act 1996).
- A row of its own for the roof tiles or slates, and the ridge and hip tiles, verge units, valley troughs and eaves closures. Concrete, clay and interlocking tiles and natural slates are counted in the fixing row's working, as its units in total, before those cut at the verges, hips and valleys or broken in handling; the fittings are listed as work and ordered by their own length from the maker's range.
- A hipped roof's battens and courses, a lean-to, a mansard, or planes at two pitches. The area rows hold for a hipped roof at one pitch, but its batten rows take a gable's slope; take each plane off on its own.

## Frequently asked questions

**What does the pitched roof re-covering takeoff give for a typical job?**

Opened at Roof length on plan, along the ridge 9 m · Roof width on plan, eave to eave 7.5 m · Roof pitch (rise per 12) 8 · Slope factor 1.2 · Height to the eaves 5 m · Length where the roof meets a wall or chimney 4 m · Pipes and flues through the roof 1 · Loose depth of the old covering, stripped 40 mm · Eaves with an ice barrier 0 · Eaves edge to the inside face of the wall 0.6 m, it orders: Dust sheets (drop cloths) in the loft (attic), 7 items; Scaffold along the first eave, 45 m² of face; Scaffold along the second eave, 45 m² of face; Underlay (felt, membrane or underlayment), 1 roll; Eaves vent trays (rafter baffles), 30 baffles; Batten rows, each slope, 15 rows; Nails and clips (fixings), 1,976 fixings; Ventilated ridge (ridge vent), 9.45 m; Pipe flashings (collars or boots) for soil and vent pipes, 2 boots; Abutment flashing at walls and the chimney (lead or step flashing), 3 sheets; Skip (dumpster) for the old covering, 3.25 m³. Opened at Roof length on plan, along the ridge 30 ft · Roof width on plan, eave to eave 25 ft · Roof pitch (rise per 12) 8 · Slope factor 1.2 · Height to the eaves 16.5 ft · Length where the roof meets a wall or chimney 13 ft · Pipes and flues through the roof 1 · Loose depth of the old covering, stripped 1.5 in · Eaves with an ice barrier 0 · Eaves edge to the inside face of the wall 2 ft: Dust sheets (drop cloths) in the loft (attic), 7 items; Scaffold along the first eave, 495 sq ft of face; Scaffold along the second eave, 495 sq ft of face; Underlay (felt, membrane or underlayment), 1 roll; Eaves vent trays (rafter baffles), 30 baffles; Shingles, in squares, 9.92 squares; Ventilated ridge (ridge vent), 31.5 ft; Ridge cap shingles, 1 bundle; Pipe flashings (collars or boots) for soil and vent pipes, 2 boots; Abutment flashing at walls and the chimney (lead or step flashing), 2 sheets; Skip (dumpster) for the old covering, 4.17 yd³. Every figure follows the dimensions you give it.

**Which calculators does the pitched roof re-covering takeoff run?**

10 calculators, for 11 lines: Masking and Protection Materials Calculator, Scaffold Face Area and Hire Quantity Calculator, Roofing Underlayment Calculator, Attic Rafter Baffle/Chute Count Calculator, Roof Squares Calculator, Ridge Vent Linear Footage Calculator, Roof Ridge Cap Calculator, Roof Vent Pipe Boot Count Calculator, Exterior Flashing Layout Trim Sheet Calculator, Skip & Dumpster Size Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions. (US customary) / 10 calculators, for 11 lines: Masking and Protection Materials Calculator, Scaffold Face Area and Hire Quantity Calculator, Roofing Underlayment Calculator, Attic Rafter Baffle/Chute Count Calculator, Roof Batten Spacing Calculator (Tile Roofing), Roof Covering Fixing Calculator, Ridge Vent Linear Footage Calculator, Roof Vent Pipe Boot Count Calculator, Exterior Flashing Layout Trim Sheet Calculator, Skip & Dumpster Size Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions. (metric)

**What does the pitched roof re-covering takeoff leave out?**

8 things, each named on this page: Strengthening the rafters, purlins or wall plates, and whether they carry a covering heavier than the old one; Insulation the regulations may call for when the roof is renewed; Bat surveys, and any licence needed where bats roost in the roof; Chimney repairs and rebuilds; Taking down and recommissioning a solar PV array, which is its installer's work, and moving or shrouding an overhead supply cable at the eaves, which is the network operator's or the utility's; Work where the roof meets a neighbour's across a party wall, and any notice it needs (in England and Wales, under the Party Wall etc; A row of its own for the roof tiles or slates, and the ridge and hip tiles, verge units, valley troughs and eaves closures; A hipped roof's battens and courses, a lean-to, a mansard, or planes at two pitches.

**Can I check a quote for this job against the takeoff?**

Yes. The pitched roof re-covering quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/takeoff/pitched-roof-recovering` describes it; `https://api.craftquantities.com/v1/takeoff/pitched-roof-recovering/run` works it, measurements with their units.
- MCP: the `get_takeoff` and `run_takeoff` tools at https://api.craftquantities.com/mcp with `takeoff` `pitched-roof-recovering`.

---
Source: https://craftquantities.com/build/pitched-roof-recovering/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.