> Turn a loft into a room under its own roof, lit by rooflights (roof windows) and with no dormer: insulation in the slopes, knee walls and over the flat ceiling, sound insulation in the new floor, studs for the knee walls, boards on the ceilings, slopes, reveals and walls, skimmed or taped, paint, skirting and the skip, with the floor, any beam, the trimming and the stair listed and never sized.

Page: https://craftquantities.com/build/loft-room-rooflights/ (whole-job takeoff). This is the page's Markdown copy; the HTML page is the canonical version.

## Measurements

Each length, area or volume is entered with its unit; one left out opens at the figure shown.

| Measurement | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Loft length, wall to wall | `loftLength` | 6 m | 20 ft | mm, cm, m, in, ft, yd |
| New floor, knee wall to knee wall | `floorDepth` | 4.4 m | 14.5 ft | mm, cm, m, in, ft, yd |
| Knee wall height | `kneeHeight` | 1.2 m | 4 ft | mm, cm, m, in, ft, yd |
| Floor to flat ceiling | `roomHeight` | 2.3 m | 7.5 ft | mm, cm, m, in, ft, yd |
| Sloped ceiling on each side, on plan | `slopeRun` | 1.1 m | 3.5 ft | mm, cm, m, in, ft, yd |
| Roof slope factor | `slopeFactor` | 1.414 | 1.414 | a number |
| Rooflights (roof windows) | `rooflights` | 2 | 2 | a number |
| Rooflight width, each | `rooflightWidth` | 0.78 m | 2.5 ft | mm, cm, m, in, ft, yd |
| Rooflight height, each | `rooflightHeight` | 1.18 m | 4 ft | mm, cm, m, in, ft, yd |
| Reveal depth round each rooflight | `revealDepth` | 300 mm | 11.75 in | mm, cm, m, in, ft, yd |
| Doors into the room | `doors` | 1 | 1 | a number |

- **Loft length, wall to wall**: Along the ridge, between the end walls inside the loft: gable to gable, or gable to party wall.
- **New floor, knee wall to knee wall**: Across the house, from the knee wall under one slope to the knee wall under the other.
- **Floor to flat ceiling**: The finished height under the flat ceiling at collar height.
- **Sloped ceiling on each side, on plan**: How far the ceiling slopes above each knee wall before it goes flat, measured on plan; the slope's own length is this times the slope factor. The room height less the knee wall, over this run, is the roof's pitch: 0.84 at 40°, 1.00 at 45°.
- **Roof slope factor**: Roof area ÷ plan area for the roof's pitch: 1.22 at 35°, 1.31 at 40°, 1.41 at 45°, 1.56 at 50°. Give it the same pitch as the sloped strip's rise over its run.
- **Rooflights (roof windows)**: How many roof windows the room takes, in either slope.
- **Rooflight width, each**: The roof window's outside frame across the slope: 0.78 m (about 2 ft 7 in) fits between rafters at 0.6 m (2 ft) centres once one is trimmed, or a wider one where the opening is trimmed across more.
- **Rooflight height, each**: The roof window's outside frame up the slope.
- **Reveal depth round each rooflight**: From the window's frame to the finished ceiling: the rafter's depth with the insulation under it. Each reveal is lined on all four sides to this depth.
- **Doors into the room**: The door off the stair into the room, and any other; each is a fire door where the escape route calls for one.

## Build-up choices

| Choice | id | Options | Opens on (metric / US customary) |
|---|---|---|---|
| Board finish | `finish` | Skimmed in plaster (`skimmed`); Taped and filled (`taped`) | `skimmed` / `taped` |
| Floor finish | `floor` | Carpet, listed and not counted (`carpet`); Laminate or vinyl plank (`click`) | `carpet` / `carpet` |

## Quantities on the opening figures

Worked as the takeoff page works them, each row by its own calculator.

### Metric

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Dust sheets in the rooms below | 5 items |  | Masking and Protection Materials Calculator |
| Studs for the two knee walls | 39 studs |  | Framing Stud Calculator |
| Boards between and under the sloped rafters | 7 sheets (2400x1200 mm) |  | Foam Board Insulation Calculator |
| Batts in the knee walls | 4 packages |  | Mineral Wool Insulation Batt Calculator |
| Sound insulation between the floor joists | 6 packages |  | Mineral Wool Insulation Batt Calculator |
| Insulation over the flat ceiling | 3 packages |  | Mineral Wool Insulation Batt Calculator |
| Plasterboard (drywall) on the ceiling, slopes and reveals | 13 sheets |  | Ceiling Plasterboard Calculator (Gypsum Board Sheets) |
| Plasterboard (drywall) on the walls | 13 sheets |  | Ceiling Plasterboard Calculator (Gypsum Board Sheets) |
| Skim over every board | 186 kg |  | Skim Coat Plaster Calculator |
| Mist coat or primer on the ceiling, slopes and reveals | 3.24 L |  | Ceiling Paint Calculator |
| Mist coat or primer on the walls | 3.22 L |  | Ceiling Paint Calculator |
| Skirting (baseboard) | 21.9 m |  | Baseboard & Trim Calculator |
| Ceiling, slopes and reveals, two coats | 6.48 L |  | Ceiling Paint Calculator |
| Walls, two coats | 6.44 L |  | Ceiling Paint Calculator |
| Skip (dumpster) for the strip-out | 3.96 m³ |  | Skip & Dumpster Size Calculator |

### US customary

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Dust sheets in the rooms below | 5 items |  | Masking and Protection Materials Calculator |
| Studs for the two knee walls | 39 studs |  | Framing Stud Calculator |
| Boards between and under the sloped rafters | 7 sheets (4x8 ft) |  | Foam Board Insulation Calculator |
| Batts in the knee walls | 4 packages |  | Mineral Wool Insulation Batt Calculator |
| Sound insulation between the floor joists | 7 packages |  | Mineral Wool Insulation Batt Calculator |
| Insulation over the flat ceiling | 4 packages |  | Mineral Wool Insulation Batt Calculator |
| Plasterboard (drywall) on the ceiling, slopes and reveals | 13 sheets |  | Ceiling Plasterboard Calculator (Gypsum Board Sheets) |
| Plasterboard (drywall) on the walls | 13 sheets |  | Ceiling Plasterboard Calculator (Gypsum Board Sheets) |
| Joint compound for taping and filling every board | 2 x 4.5 gal boxes |  | Drywall Joint Compound Calculator |
| Paper joint tape over every board | 440 ft |  | Drywall Joint Tape Calculator |
| Mist coat or primer on the ceiling, slopes and reveals | 0.884 gal |  | Ceiling Paint Calculator |
| Mist coat or primer on the walls | 0.883 gal |  | Ceiling Paint Calculator |
| Skirting (baseboard) | 72.7 linear ft |  | Baseboard & Trim Calculator |
| Ceiling, slopes and reveals, two coats | 1.77 gal |  | Ceiling Paint Calculator |
| Walls, two coats | 1.77 gal |  | Ceiling Paint Calculator |
| Skip (dumpster) for the strip-out | 5.29 yd³ |  | Skip & Dumpster Size Calculator |

## Calculators it runs

- [Masking and Protection Materials Calculator](https://craftquantities.com/calculators/renovation-construction/masking-and-protection-calculator/)
- [Framing Stud Calculator](https://craftquantities.com/calculators/renovation-construction/framing-stud-calculator/)
- [Foam Board Insulation Calculator](https://craftquantities.com/calculators/insulation-efficiency/foam-board-insulation-calculator/)
- [Mineral Wool Insulation Batt Calculator](https://craftquantities.com/calculators/materials-quantities/mineral-wool-batt-calculator/)
- [Ceiling Plasterboard Calculator (Gypsum Board Sheets)](https://craftquantities.com/calculators/materials-quantities/ceiling-plasterboard-sheet-calculator/)
- [Skim Coat Plaster Calculator](https://craftquantities.com/calculators/materials-quantities/skim-coat-plaster-calculator/)
- [Ceiling Paint Calculator](https://craftquantities.com/calculators/renovation-construction/ceiling-paint-calculator/)
- [Baseboard & Trim Calculator](https://craftquantities.com/calculators/renovation-construction/baseboard-trim-calculator/)
- [Skip & Dumpster Size Calculator](https://craftquantities.com/calculators/auto-utility/skip-and-dumpster-size-calculator/)
- [Drywall Joint Compound Calculator](https://craftquantities.com/calculators/renovation-construction/drywall-joint-compound-calculator/)
- [Drywall Joint Tape Calculator](https://craftquantities.com/calculators/renovation-construction/drywall-joint-tape-calculator/)

## Not counted

- The structure: the floor joists, any beam replacing a purlin or strut and its bearings, the trimmers round each rooflight and the stair, and the stair itself. Each is listed as work with no quantity; the engineer or the stair maker sizes it and building control inspects it.
- The rooflights themselves, their flashing kits, blinds and any electric opener: bought as units to the sizes given and fitted as listed work.
- The floor deck, listed as work: a British loft floor is usually tongue-and-groove chipboard in narrow boards and a US attic floor tongue-and-groove sheets, laid over the floor's area.
- Ventilation of the cold voids behind the knee walls and over the flat ceiling, and insulation of a gable end wall facing outside.
- Tiles, slates and battens round each rooflight beyond making them good, and any re-covering of the slopes.
- A shower room or bathroom in the loft, its drainage and the heating extended to the room beyond a radiator listed as work.
- Undercoat and gloss (trim enamel) on the new woodwork: the door, the architraves (casings) and the rest of the trim.

## Frequently asked questions

**What does the loft room takeoff give for a typical job?**

Opened at Loft length, wall to wall 6 m · New floor, knee wall to knee wall 4.4 m · Knee wall height 1.2 m · Floor to flat ceiling 2.3 m · Sloped ceiling on each side, on plan 1.1 m · Roof slope factor 1.41 · Rooflights (roof windows) 2 · Rooflight width, each 0.78 m · Rooflight height, each 1.18 m · Reveal depth round each rooflight 300 mm · Doors into the room 1, it orders: Dust sheets in the rooms below, 5 items; Studs for the two knee walls, 39 studs; Boards between and under the sloped rafters, 7 sheets (2400x1200 mm); Batts in the knee walls, 4 packages; Sound insulation between the floor joists, 6 packages; Insulation over the flat ceiling, 3 packages; Plasterboard (drywall) on the ceiling, slopes and reveals, 13 sheets; Plasterboard (drywall) on the walls, 13 sheets; Skim over every board, 186 kg; Mist coat or primer on the ceiling, slopes and reveals, 3.24 L; Mist coat or primer on the walls, 3.22 L; Skirting (baseboard), 21.9 m; Ceiling, slopes and reveals, two coats, 6.48 L; Walls, two coats, 6.44 L; Skip (dumpster) for the strip-out, 3.96 m³. Opened at Loft length, wall to wall 20 ft · New floor, knee wall to knee wall 14.5 ft · Knee wall height 4 ft · Floor to flat ceiling 7.5 ft · Sloped ceiling on each side, on plan 3.5 ft · Roof slope factor 1.41 · Rooflights (roof windows) 2 · Rooflight width, each 2.5 ft · Rooflight height, each 4 ft · Reveal depth round each rooflight 11.8 in · Doors into the room 1: Dust sheets in the rooms below, 5 items; Studs for the two knee walls, 39 studs; Boards between and under the sloped rafters, 7 sheets (4x8 ft); Batts in the knee walls, 4 packages; Sound insulation between the floor joists, 7 packages; Insulation over the flat ceiling, 4 packages; Plasterboard (drywall) on the ceiling, slopes and reveals, 13 sheets; Plasterboard (drywall) on the walls, 13 sheets; Joint compound for taping and filling every board, 2 x 4.5 gal boxes; Paper joint tape over every board, 440 ft; Mist coat or primer on the ceiling, slopes and reveals, 0.88 gal; Mist coat or primer on the walls, 0.88 gal; Skirting (baseboard), 72.7 linear ft; Ceiling, slopes and reveals, two coats, 1.77 gal; Walls, two coats, 1.77 gal; Skip (dumpster) for the strip-out, 5.29 yd³. Every figure follows the dimensions you give it.

**Which calculators does the loft room takeoff run?**

10 calculators, for 16 lines: Masking and Protection Materials Calculator, Framing Stud Calculator, Foam Board Insulation Calculator, Mineral Wool Insulation Batt Calculator, Ceiling Plasterboard Calculator (Gypsum Board Sheets), Drywall Joint Compound Calculator, Drywall Joint Tape Calculator, Ceiling Paint Calculator, Baseboard & Trim Calculator, Skip & Dumpster Size Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions. (US customary) / 9 calculators, for 15 lines: Masking and Protection Materials Calculator, Framing Stud Calculator, Foam Board Insulation Calculator, Mineral Wool Insulation Batt Calculator, Ceiling Plasterboard Calculator (Gypsum Board Sheets), Skim Coat Plaster Calculator, Ceiling Paint Calculator, Baseboard & Trim Calculator, Skip & Dumpster Size Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions. (metric)

**What does the loft room takeoff leave out?**

7 things, each named on this page: The structure; The rooflights themselves, their flashing kits, blinds and any electric opener; The floor deck, listed as work; Ventilation of the cold voids behind the knee walls and over the flat ceiling, and insulation of a gable end wall facing outside; Tiles, slates and battens round each rooflight beyond making them good, and any re-covering of the slopes; A shower room or bathroom in the loft, its drainage and the heating extended to the room beyond a radiator listed as work; Undercoat and gloss (trim enamel) on the new woodwork.

**Can I check a quote for this job against the takeoff?**

Yes. The loft room quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/takeoff/loft-room-rooflights` describes it; `https://api.craftquantities.com/v1/takeoff/loft-room-rooflights/run` works it, measurements with their units.
- MCP: the `get_takeoff` and `run_takeoff` tools at https://api.craftquantities.com/mcp with `takeoff` `loft-room-rooflights`.

---
Source: https://craftquantities.com/build/loft-room-rooflights/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.