# Full house rewire takeoff

> Rewire a house from the old wiring out: dust sheets over the floors, the outlet (socket) count by the North American spacing rule, fire-stopping where a cable crosses a fire-separating wall, the skim and mist coat where chased walls are replastered, and the skip, with the chases, the lifted boards, the consumer unit (panel), the bonding, the alarms and the test listed and never certified.

Page: https://craftquantities.com/build/full-rewire/ (whole-job takeoff). This is the page's Markdown copy; the HTML page is the canonical version.

## Measurements

Each length, area or volume is entered with its unit; one left out opens at the figure shown.

| Measurement | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Floor area of the house, every storey added up | `floorArea` | 90 m² | 970 sq ft | m2, ft2, mm2, in2 |
| Wall round the living rooms and bedrooms, added up | `socketWallRun` | 64 m | 210 ft | mm, cm, m, in, ft, yd |
| Sleeved runs through a fire-separating wall or floor | `fireSleeves` | 2 | 2 | a number |
| Each sleeve across, outside | `sleeveSize` | 25 mm | 1 in | mm, cm, m, in, ft, yd |
| Walls and ceilings replastered after the chases | `skimArea` | 30 m² | 320 sq ft | m2, ft2, mm2, in2 |
| Loose waste, as a depth over the floor area | `wasteDepth` | 10 mm | 0.39 in | mm, cm, m, in, ft, yd |

- **Floor area of the house, every storey added up**: Inside the outside walls, on every floor that is rewired, a finished basement included. The dust sheets and the waste follow it.
- **Wall round the living rooms and bedrooms, added up**: Each living room's, dining room's and bedroom's perimeter, added together: the walls general-use outlets (sockets) go on. Leave out the kitchen worktop, bathrooms, the hall and the landing, which have rules of their own.
- **Sleeved runs through a fire-separating wall or floor**: Each place a sleeve carries cable through a wall or ceiling that separates the house from an attached (integral) garage, or one flat from another. 0 where no run crosses one, which leaves the fire-stop row out.
- **Each sleeve across, outside**: The outside diameter of the sleeve or conduit the cables pass through. The sealant fills the ring between it and the hole.
- **Walls and ceilings replastered after the chases**: The area skimmed over rather than patched, where old plaster came away with the chasing or the filled chases would show through paint. 0 where every chase is only filled, which leaves the skim and the mist coat out.
- **Loose waste, as a depth over the floor area**: The loose volume the rewire makes for each square metre (square foot) of floor: the old cable and accessories, the old board, the plaster out of the chases and the packaging the new materials come in. 10 mm (about 3/8 in) over 90 m² (about 970 sq ft) is 0.9 m³ (about 1.2 cubic yards).

## Quantities on the opening figures

Worked as the takeoff page works them, each row by its own calculator.

### Metric

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Dust sheets over the floors | 9 items |  | Masking and Protection Materials Calculator |
| Outlets (receptacles, sockets) by the North American spacing rule | 18 outlets (minimum) |  | Outlet Spacing Calculator |
| Fire stopping: sealant round the sleeves | 0.0393 L |  | Penetration Firestop Caulk Volume Calculator |
| Skim over the replastered walls and ceilings | 86.3 kg |  | Skim Coat Plaster Calculator |
| Mist coat or sealer on the new skim | 7.57 L |  | Paint Primer Calculator |
| Skip (dumpster) or bags for the strip-out | 0.9 m³ |  | Skip & Dumpster Size Calculator |

### US customary

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Dust sheets over the floors | 9 items |  | Masking and Protection Materials Calculator |
| Outlets (receptacles, sockets) by the North American spacing rule | 18 outlets (minimum) |  | Outlet Spacing Calculator |
| Fire stopping: sealant round the sleeves | 0.0106 gal |  | Penetration Firestop Caulk Volume Calculator |
| Skim over the replastered walls and ceilings | 188 lb |  | Skim Coat Plaster Calculator |
| Mist coat or sealer on the new skim | 2 gallons |  | Paint Primer Calculator |
| Skip (dumpster) or bags for the strip-out | 1.17 yd³ |  | Skip & Dumpster Size Calculator |

## Calculators it runs

- [Masking and Protection Materials Calculator](https://craftquantities.com/calculators/renovation-construction/masking-and-protection-calculator/)
- [Outlet Spacing Calculator](https://craftquantities.com/calculators/electrical/outlet-spacing-calculator/)
- [Penetration Firestop Caulk Volume Calculator](https://craftquantities.com/calculators/materials-quantities/firestop-caulk-volume-calculator/)
- [Skim Coat Plaster Calculator](https://craftquantities.com/calculators/materials-quantities/skim-coat-plaster-calculator/)
- [Paint Primer Calculator](https://craftquantities.com/calculators/renovation-construction/paint-primer-calculator/)
- [Skip & Dumpster Size Calculator](https://craftquantities.com/calculators/auto-utility/skip-and-dumpster-size-calculator/)

## Not counted

- The supply side: the incoming cable, the cut-out, the meter and the meter tails in Britain, the utility's drop or lateral and the meter across North America, and anything else the network operator or the utility owns. The job books the supplier's isolation for the day the board changes and does no work on the supply itself.
- The circuit design: how many circuits, what each carries, the cable sizes and each circuit's rating, which the electrician takes from the wiring regulations or the electrical code; and the cable, boxes and accessories as quantities, which follow from it.
- The certificate or the inspection record itself, and the building control or permit fee behind it. The work is listed; the paper comes from the electrician, the scheme or the inspector.
- Circuits outside the house or for a new appliance: garden lighting, an outbuilding's supply, an EV charger, or a shower or cooker circuit upgraded, each sized on its own load.
- New floor coverings where boards are lifted. A carpet that can be relaid by hand goes back with the boards; a fitted carpet, sheet vinyl or a glued floor that cannot is the floor layer's.
- Decorating as a quantity. The chases filled, the skim and its mist coat are here; painting whole rooms afterwards is listed as work, because the paint page paints one room at a time and a rewire decorates a house.
- Taking out asbestos. A survey is listed where textured ceilings, the old board or floor tiles are old enough to contain it; removing any of it is a licensed or specialist job with its own programme.
- Notches, holes and chases beyond the limits the building regulations or code set for joists and walls. Where a route cannot stay inside them, the route changes or an engineer is asked; nothing here allows a deeper cut.

## Frequently asked questions

**What does the full rewire takeoff give for a typical job?**

Opened at Floor area of the house, every storey added up 90 m² · Wall round the living rooms and bedrooms, added up 64 m · Sleeved runs through a fire-separating wall or floor 2 · Each sleeve across, outside 25 mm · Walls and ceilings replastered after the chases 30 m² · Loose waste, as a depth over the floor area 10 mm, it orders: Dust sheets over the floors, 9 items; Outlets (receptacles, sockets) by the North American spacing rule, 18 outlets (minimum); Fire stopping: sealant round the sleeves, 0.04 L; Skim over the replastered walls and ceilings, 86.3 kg; Mist coat or sealer on the new skim, 7.57 L; Skip (dumpster) or bags for the strip-out, 0.9 m³. Opened at Floor area of the house, every storey added up 970 sq ft · Wall round the living rooms and bedrooms, added up 210 ft · Sleeved runs through a fire-separating wall or floor 2 · Each sleeve across, outside 1 in · Walls and ceilings replastered after the chases 320 sq ft · Loose waste, as a depth over the floor area 0.39 in: Dust sheets over the floors, 9 items; Outlets (receptacles, sockets) by the North American spacing rule, 18 outlets (minimum); Fire stopping: sealant round the sleeves, 0.01 gal; Skim over the replastered walls and ceilings, 188 lb; Mist coat or sealer on the new skim, 2 gallons; Skip (dumpster) or bags for the strip-out, 1.17 yd³. Every figure follows the dimensions you give it.

**Which calculators does the full rewire takeoff run?**

6 calculators, one to a line: Masking and Protection Materials Calculator, Outlet Spacing Calculator, Penetration Firestop Caulk Volume Calculator, Skim Coat Plaster Calculator, Paint Primer Calculator, Skip & Dumpster Size Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.

**What does the full rewire takeoff leave out?**

8 things, each named on this page: The supply side; The circuit design; The certificate or the inspection record itself, and the building control or permit fee behind it; Circuits outside the house or for a new appliance; New floor coverings where boards are lifted; Decorating as a quantity; Taking out asbestos; Notches, holes and chases beyond the limits the building regulations or code set for joists and walls.

**Can I check a quote for this job against the takeoff?**

Yes. The full rewire quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/takeoff/full-rewire` describes it; `https://api.craftquantities.com/v1/takeoff/full-rewire/run` works it, measurements with their units.
- MCP: the `get_takeoff` and `run_takeoff` tools at https://api.craftquantities.com/mcp with `takeoff` `full-rewire`.

---
Source: https://craftquantities.com/build/full-rewire/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.