# Floor sanding and refinishing takeoff

> Sand a wood floor back to bare timber and finish it again: dust sheets outside the doors and tape along the skirting (baseboard), the sealer and finish coat by coat with the abrasives for every grit in its working, the beading (quarter round or shoe molding) refitted, a threshold strip at each doorway and a skip for a carpet lifted first, with the lead test, the board preparation, the sanding, the gap filling and the doors off and rehung listed, and nothing certified.

Page: https://craftquantities.com/build/floor-sanding-refinish/ (whole-job takeoff). This is the page's Markdown copy; the HTML page is the canonical version.

## Measurements

Each length, area or volume is entered with its unit; one left out opens at the figure shown.

| Measurement | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Floor length | `floorLength` | 5 m | 16.5 ft | mm, cm, m, in, ft, yd |
| Floor width | `floorWidth` | 4 m | 13 ft | mm, cm, m, in, ft, yd |
| Doorways | `doorways` | 1 | 1 | a number |
| Floor sheeted outside the doorways | `landingArea` | 4 m² | 43 sq ft | m2, ft2, mm2, in2 |
| Covering lifted first, as a loose depth over the floor | `wasteDepth` | 30 mm | 1.25 in | mm, cm, m, in, ft, yd |

- **Floor length**: Wall to wall the longer way, into a bay or an alcove only where the boards run into it. With the width it gives the floor sanded and finished, and the edge the edger works round.
- **Floor width**: Wall to wall the shorter way.
- **Doorways**: Each doorway out of the room: it is taped round to hold a dust sheet across it, its door is lifted off for the sanding and rehung after, and a threshold strip crosses it where the floor meets another finish. 0 leaves the strip row out.
- **Floor sheeted outside the doorways**: The landing or hall just outside, where the machines stand between passes and the dust bags are changed. The dust sheets cover it; the floor being sanded is never sheeted.
- **Covering lifted first, as a loose depth over the floor**: The loose volume an old carpet, its underlay and gripper, or another covering, take up once lifted, for each square metre (square foot) of floor: 30 mm (1 1/4 in) over 20 m² (215 sq ft) is 0.6 m³ (about 0.8 cubic yards). 0 where the boards are bare or under a worn finish only, which leaves the skip row out.

## Build-up choices

| Choice | id | Options | Opens on (metric / US customary) |
|---|---|---|---|
| At the edge of the floor | `edge` | Beading (quarter round or shoe molding), or the skirting, taken off and refitted or renewed (`off`); Left in place: the edger works up to the skirting (`kept`) | `off` / `off` |

## Quantities on the opening figures

Worked as the takeoff page works them, each row by its own calculator.

### Metric

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Masking and protection materials | 2 items |  | Masking and Protection Materials Calculator |
| Lacquer, varnish, oil or polyurethane (poly), with its sealer and abrasives | 7.87 L |  | Floor Sanding and Finish Calculator |
| Beading or skirting (scotia, quarter round, shoe molding) | 18.8 m |  | Baseboard & Trim Calculator |
| Threshold strips (transitions, threshold bars, T-moldings, reducers) | 0.945 m |  | Floor Transition Strip Calculator |
| Skip (dumpster) | 0.6 m³ |  | Skip & Dumpster Size Calculator |

### US customary

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Masking and protection materials | 2 items |  | Masking and Protection Materials Calculator |
| Lacquer, varnish, oil or polyurethane (poly), with its sealer and abrasives | 2.07 gal |  | Floor Sanding and Finish Calculator |
| Beading or skirting (scotia, quarter round, shoe molding) | 61.7 linear ft |  | Baseboard & Trim Calculator |
| Threshold strips (transitions, threshold bars, T-moldings, reducers) | 3.15 ft |  | Floor Transition Strip Calculator |
| Skip (dumpster) | 0.828 yd³ |  | Skip & Dumpster Size Calculator |

## Calculators it runs

- [Masking and Protection Materials Calculator](https://craftquantities.com/calculators/renovation-construction/masking-and-protection-calculator/)
- [Floor Sanding and Finish Calculator](https://craftquantities.com/calculators/renovation-construction/floor-finish-coverage-calculator/)
- [Baseboard & Trim Calculator](https://craftquantities.com/calculators/renovation-construction/baseboard-trim-calculator/)
- [Floor Transition Strip Calculator](https://craftquantities.com/calculators/materials-quantities/floor-transition-strip-calculator/)
- [Skip & Dumpster Size Calculator](https://craftquantities.com/calculators/auto-utility/skip-and-dumpster-size-calculator/)

## Not counted

- Joist or subfloor renewal, and boards beyond the odd one.
- Bitumen or old adhesive taken off.
- Moving the furniture out and back.
- Staining the timber a colour.
- Laying new flooring of another kind.
- Trimming a door's foot, or an undercut, to clear a raised floor.

## Frequently asked questions

**What does the floor sanding and refinishing takeoff give for a typical job?**

Opened at Floor length 5 m · Floor width 4 m · Doorways 1 · Floor sheeted outside the doorways 4 m² · Covering lifted first, as a loose depth over the floor 30 mm, it orders: Masking and protection materials, 2 items; Lacquer, varnish, oil or polyurethane (poly), with its sealer and abrasives, 7.87 L; Beading or skirting (scotia, quarter round, shoe molding), 18.8 m; Threshold strips (transitions, threshold bars, T-moldings, reducers), 0.95 m; Skip (dumpster), 0.6 m³. Opened at Floor length 16.5 ft · Floor width 13 ft · Doorways 1 · Floor sheeted outside the doorways 43 sq ft · Covering lifted first, as a loose depth over the floor 1.25 in: Masking and protection materials, 2 items; Lacquer, varnish, oil or polyurethane (poly), with its sealer and abrasives, 2.07 gal; Beading or skirting (scotia, quarter round, shoe molding), 61.7 linear ft; Threshold strips (transitions, threshold bars, T-moldings, reducers), 3.15 ft; Skip (dumpster), 0.83 yd³. Every figure follows the dimensions you give it.

**Which calculators does the floor sanding and refinishing takeoff run?**

5 calculators, one to a line: Masking and Protection Materials Calculator, Floor Sanding and Finish Calculator, Baseboard & Trim Calculator, Floor Transition Strip Calculator, Skip & Dumpster Size Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.

**What does the floor sanding and refinishing takeoff leave out?**

6 things, each named on this page: Joist or subfloor renewal, and boards beyond the odd one; Bitumen or old adhesive taken off; Moving the furniture out and back; Staining the timber a colour; Laying new flooring of another kind; Trimming a door's foot, or an undercut, to clear a raised floor.

**Can I check a quote for this job against the takeoff?**

Yes. The floor sanding and refinishing quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/takeoff/floor-sanding-refinish` describes it; `https://api.craftquantities.com/v1/takeoff/floor-sanding-refinish/run` works it, measurements with their units.
- MCP: the `get_takeoff` and `run_takeoff` tools at https://api.craftquantities.com/mcp with `takeoff` `floor-sanding-refinish`.

---
Source: https://craftquantities.com/build/floor-sanding-refinish/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.