# EV charger installation takeoff

> Fit a charge point for an electric car (a wallbox; an EVSE or Level 2 charger in North America): dust sheets along the route indoors, the dedicated circuit's run with its bends, in armoured cable or conduit, and a trench where the charger stands away from the house, with the supply check and the network operator's notice, the earthing, the charger, its isolator, the protection, the drive or lawn put back and the tests listed and never certified.

Page: https://craftquantities.com/build/ev-charger-installation/ (whole-job takeoff). This is the page's Markdown copy; the HTML page is the canonical version.

## Measurements

Each length, area or volume is entered with its unit; one left out opens at the figure shown.

| Measurement | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Floor along the cable's route indoors | `routeFloor` | 6 m² | 65 sq ft | m2, ft2, mm2, in2 |
| Cable route above ground, straight legs added | `route` | 10 m | 33 ft | mm, cm, m, in, ft, yd |
| Bends in the route | `bends` | 6 | 6 | a number |
| Buried run, house wall to the charger's post | `trenchLength` | 6 m | 19.5 ft | mm, cm, m, in, ft, yd |
| Trench depth | `trenchDepth` | 0.5 m | 1.5 ft | mm, cm, m, in, ft, yd |

- **Floor along the cable's route indoors**: The floor under the route from the board to the outside wall, the hall or the understairs cupboard where a British board often is, or the utility room or basement where a panel is: drilling and clipping drop dust on it. 0 where the board is in the garage or the cable leaves straight through the wall behind it, which leaves the dust sheets out.
- **Cable route above ground, straight legs added**: Every straight stretch of the route from the board to the charger, or to where the cable goes into the ground, added together: inside, through the wall and along or down the outside wall, with the drop into the trench and the rise up the post where it is buried. Measure each stretch to where it starts to bend; the row adds the bends' curves.
- **Bends in the route**: Each right-angle turn the cable or conduit makes: out of the board, through and along the wall, down into the trench and up the post. Two 45° turns at one corner count as one.
- **Buried run, house wall to the charger's post**: The trench's length where the charger stands on a post away from the house, across the drive, a path or the lawn. 0 where the charger is on the house or garage wall and nothing is buried, which leaves the trench out.
- **Trench depth**: As deep as the electrician sets for the cable, its duct and the ground or drive above it; the wiring regulations or electrical code set how a buried cable is protected, and the depth is theirs, not this page's.

## Build-up choices

| Choice | id | Options | Opens on (metric / US customary) |
|---|---|---|---|
| How the circuit is run | `cable` | Armoured cable (SWA), clipped direct (`armoured`); Wire in EMT conduit (`conduit`) | `armoured` / `conduit` |

## Quantities on the opening figures

Worked as the takeoff page works them, each row by its own calculator.

### Metric

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Dust sheets along the route indoors | 1 items |  | Masking and Protection Materials Calculator |
| Dedicated circuit: armoured cable (SWA) run, clipped or in duct (ducting), bends included | 17.4 m |  | EMT Conduit Bend Length Calculator |
| Groundworks: trench excavation and backfill for the buried leg, warning tape laid | 1.03 m³ (loose) | 1.04 m³ (loose) | Trench Excavation & Backfill Volume Calculator |

### US customary

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Dust sheets along the route indoors | 1 items |  | Masking and Protection Materials Calculator |
| Dedicated circuit: cable run in EMT conduit, in duct (ducting) below ground, bends included | 57.2 ft |  | EMT Conduit Bend Length Calculator |
| Groundworks: trench excavation and backfill for the buried leg, warning tape laid | 1.23 yd³ |  | Trench Excavation & Backfill Volume Calculator |

## Calculators it runs

- [Masking and Protection Materials Calculator](https://craftquantities.com/calculators/renovation-construction/masking-and-protection-calculator/)
- [EMT Conduit Bend Length Calculator](https://craftquantities.com/calculators/materials-quantities/conduit-bend-length-calculator/)
- [Trench Excavation & Backfill Volume Calculator](https://craftquantities.com/calculators/materials-quantities/trench-excavation-backfill-calculator/)

## Not counted

- A bigger supply to the house: a larger main fuse, a new incoming cable or meter, and whatever else is on the supplier's side of the meter. Checking the supply and the notice are listed.
- The earthing arrangement's design, which the electrician chooses once the supply has been examined: flagged here, and listed as a provisional item.
- The cable's size, the rating of the protective device at the board and the voltage drop along the route, all the electrician's from the wiring regulations; this site's gauge and voltage drop pages answer those, and none is reached here.
- A cable across the public footway (sidewalk) or a neighbour's land, and the permission for it.
- A supply to a detached garage or outbuilding with a board of its own: that is a feeder, the garden room takeoff's work, not a single circuit to one appliance.
- Tarmac (asphalt) over the trench, cut and patched by a surfacer; the drive's other surfaces put back are listed.
- The car's own lead, which comes with the car; a lead the installer supplies with the unit is listed with it.
- The app's paid subscriptions once it is set up, an energy tariff, and a grant with its forms.
- A second unit for another car, and a unit for a business, a workplace or a shared car park.

## Frequently asked questions

**What does the EV charger installation takeoff give for a typical job?**

Opened at Floor along the cable's route indoors 6 m² · Cable route above ground, straight legs added 10 m · Bends in the route 6 · Buried run, house wall to the charger's post 6 m · Trench depth 0.5 m, it orders: Dust sheets along the route indoors, 1 item; Dedicated circuit: armoured cable (SWA) run, clipped or in duct (ducting), bends included, 17.4 m; Groundworks: trench excavation and backfill for the buried leg, warning tape laid, 1.03 m³ (loose). Opened at Floor along the cable's route indoors 65 sq ft · Cable route above ground, straight legs added 33 ft · Bends in the route 6 · Buried run, house wall to the charger's post 19.5 ft · Trench depth 1.5 ft: Dust sheets along the route indoors, 1 item; Dedicated circuit: cable run in EMT conduit, in duct (ducting) below ground, bends included, 57.2 ft; Groundworks: trench excavation and backfill for the buried leg, warning tape laid, 1.23 yd³. Every figure follows the dimensions you give it.

**Which calculators does the EV charger installation takeoff run?**

3 calculators, one to a line: Masking and Protection Materials Calculator, EMT Conduit Bend Length Calculator, Trench Excavation & Backfill Volume Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.

**What does the EV charger installation takeoff leave out?**

9 things, each named on this page: A bigger supply to the house; The earthing arrangement's design, which the electrician chooses once the supply has been examined; The cable's size, the rating of the protective device at the board and the voltage drop along the route, all the electrician's from the wiring regulations; this site's gauge and voltage drop pages answer those, and none is reached here; A cable across the public footway (sidewalk) or a neighbour's land, and the permission for it; A supply to a detached garage or outbuilding with a board of its own; Tarmac (asphalt) over the trench, cut and patched by a surfacer; the drive's other surfaces put back are listed; The car's own lead, which comes with the car; a lead the installer supplies with the unit is listed with it; The app's paid subscriptions once it is set up, an energy tariff, and a grant with its forms; A second unit for another car, and a unit for a business, a workplace or a shared car park.

**Can I check a quote for this job against the takeoff?**

Yes. The EV charger installation quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/takeoff/ev-charger-installation` describes it; `https://api.craftquantities.com/v1/takeoff/ev-charger-installation/run` works it, measurements with their units.
- MCP: the `get_takeoff` and `run_takeoff` tools at https://api.craftquantities.com/mcp with `takeoff` `ev-charger-installation`.

---
Source: https://craftquantities.com/build/ev-charger-installation/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.
