# Electrical rough-in takeoff

> A starting outlet count by the North American spacing rule, the lighting load and the conduit run for first-fixing a single room.

Page: https://craftquantities.com/build/electrical-rough-in/ (whole-job takeoff). This is the page's Markdown copy; the HTML page is the canonical version.

## Measurements

Each length, area or volume is entered with its unit; one left out opens at the figure shown.

| Measurement | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Room length | `length` | 5 m | 16.5 ft | mm, cm, m, in, ft, yd |
| Room width | `width` | 4 m | 13 ft | mm, cm, m, in, ft, yd |
| Light fittings | `fixtures` | 6 | 6 | a number |
| Conduit bends | `bends` | 4 | 4 | a number |
| Conduit bend radius | `bendRadius` | 150 mm | 6 in | mm, cm, m, in, ft, yd |

## Quantities on the opening figures

Worked as the takeoff page works them, each row by its own calculator.

### Metric

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Outlet Spacing | 5 outlets (minimum) |  | Outlet Spacing Calculator |
| Lighting Circuit Connected Load | 360 W |  | Lighting Circuit Connected Load Calculator |
| EMT Conduit Bend Length | 17.7 m |  | EMT Conduit Bend Length Calculator |

### US customary

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Outlet Spacing | 5 outlets (minimum) |  | Outlet Spacing Calculator |
| Lighting Circuit Connected Load | 360 W |  | Lighting Circuit Connected Load Calculator |
| EMT Conduit Bend Length | 58.1 ft |  | EMT Conduit Bend Length Calculator |

## Calculators it runs

- [Outlet Spacing Calculator](https://craftquantities.com/calculators/electrical/outlet-spacing-calculator/)
- [Lighting Circuit Connected Load Calculator](https://craftquantities.com/calculators/materials-quantities/lighting-circuit-load-calculator/)
- [EMT Conduit Bend Length Calculator](https://craftquantities.com/calculators/materials-quantities/conduit-bend-length-calculator/)

## Not counted

- The circuit design: how many circuits, what they carry, and how they land in the panel.
- Cable, boxes, back-boxes, fixings and everything else bought by the piece.
- Anything on a dedicated circuit — a cooker, a shower, an EV charger — which is sized on its own load rather than on a room.
- Inspection, certification and the parts of this work that in most places only a licensed electrician may carry out.

## Frequently asked questions

**What does the electrical rough-in takeoff give for a typical job?**

Opened at Room length 5 m · Room width 4 m · Light fittings 6 · Conduit bends 4 · Conduit bend radius 150 mm, it orders: Outlet Spacing, 5 outlets (minimum); Lighting Circuit Connected Load, 360 W; EMT Conduit Bend Length, 17.7 m. Opened at Room length 16.5 ft · Room width 13 ft · Light fittings 6 · Conduit bends 4 · Conduit bend radius 6 in: Outlet Spacing, 5 outlets (minimum); Lighting Circuit Connected Load, 360 W; EMT Conduit Bend Length, 58.1 ft. Every figure follows the dimensions you give it.

**Which calculators does the electrical rough-in takeoff run?**

3 calculators, one to a line: Outlet Spacing Calculator, Lighting Circuit Connected Load Calculator, EMT Conduit Bend Length Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.

**What does the electrical rough-in takeoff leave out?**

4 things, each named on this page: The circuit design; Cable, boxes, back-boxes, fixings and everything else bought by the piece; Anything on a dedicated circuit; Inspection, certification and the parts of this work that in most places only a licensed electrician may carry out.

**Can I check a quote for this job against the takeoff?**

Yes. The electrical rough-in quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/takeoff/electrical-rough-in` describes it; `https://api.craftquantities.com/v1/takeoff/electrical-rough-in/run` works it, measurements with their units.
- MCP: the `get_takeoff` and `run_takeoff` tools at https://api.craftquantities.com/mcp with `takeoff` `electrical-rough-in`.

---
Source: https://craftquantities.com/build/electrical-rough-in/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.