# Central heating replacement takeoff

> Replace a wet central heating system: dust sheets, scaffold where the flue needs it, lagging on pipes in cold spaces, the room the old boiler comes off repainted, and the skip, with the drain-down, the power flush before the new boiler, the boiler, flue, gas pipe, radiators, controls, inhibitor and commissioning listed and never certified.

Page: https://craftquantities.com/build/central-heating-replacement/ (whole-job takeoff). This is the page's Markdown copy; the HTML page is the canonical version.

## Measurements

Each length, area or volume is entered with its unit; one left out opens at the figure shown.

| Measurement | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Floor area of the rooms worked in | `floorArea` | 90 m² | 970 sq ft | m2, ft2, mm2, in2 |
| Scaffold along the wall below the flue | `scaffoldLength` | 0 m | 0 ft | mm, cm, m, in, ft, yd |
| Height to the flue's working platform | `flueHeight` | 5 m | 16.5 ft | mm, cm, m, in, ft, yd |
| Pipe in cold spaces, each pipe counted | `lagLength` | 12 m | 39 ft | mm, cm, m, in, ft, yd |
| Room the old boiler comes off: length | `roomLength` | 4 m | 13 ft | mm, cm, m, in, ft, yd |
| Room the old boiler comes off: width | `roomWidth` | 3 m | 10 ft | mm, cm, m, in, ft, yd |
| Room the old boiler comes off: floor to ceiling | `roomHeight` | 2.4 m | 8 ft | mm, cm, m, in, ft, yd |
| Doors in that room | `roomDoors` | 1 | 1 | a number |
| Windows in that room | `roomWindows` | 1 | 1 | a number |
| Loose waste, as a depth over the floor worked in | `wasteDepth` | 15 mm | 0.59 in | mm, cm, m, in, ft, yd |

- **Floor area of the rooms worked in**: Every room where a radiator is changed or pipe is altered, and the room the boiler is in. The dust sheets and the waste follow it.
- **Scaffold along the wall below the flue**: Where the flue goes out through the roof, or higher up a wall than a tower reaches, the length of scaffold face below it; a flue alone takes a few bays. 0 where it is reached from the ground, a ladder or a tower, which leaves the scaffold row out.
- **Height to the flue's working platform**: From the ground to the platform the flue is fitted from: the eaves, for a flue through the roof. It is read only where there is a scaffold length.
- **Pipe in cold spaces, each pipe counted**: Heating and hot-water pipe that runs through the loft, an unheated floor void, a garage or outside, with the condensate pipe where it leaves the house. A flow and a return side by side are twice the route. 0 where every pipe stays inside heated rooms.
- **Room the old boiler comes off: length**: The room whose walls are repainted once the old boiler, its brackets and its flue hole are gone. 0 where nothing is repainted, which leaves the paint row out.
- **Loose waste, as a depth over the floor worked in**: The loose volume the job makes for each square metre (square foot) of floor worked in: the old boiler, the radiators that change, a cylinder and loft tanks where the system becomes a combination boiler, the pipe cut out and the packaging the new parts come in. Metal that goes for scrap comes off it.

## Quantities on the opening figures

Worked as the takeoff page works them, each row by its own calculator.

### Metric

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Dust sheets in the rooms worked in | 9 items |  | Masking and Protection Materials Calculator |
| Lagging on pipes in cold spaces | 14 x 1 m sections |  | Pipe Insulation Calculator |
| Wall paint, two coats, in one room | 6.05 L |  | Paint Calculator |
| Skip (dumpster) for what comes out | 1.35 m³ |  | Skip & Dumpster Size Calculator |

### US customary

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Dust sheets in the rooms worked in | 9 items |  | Masking and Protection Materials Calculator |
| Lagging on pipes in cold spaces | 8 x 6 ft sections |  | Pipe Insulation Calculator |
| Wall paint, two coats, in one room | 1.66 gal |  | Paint Calculator |
| Skip (dumpster) for what comes out | 1.77 yd³ |  | Skip & Dumpster Size Calculator |

## Calculators it runs

- [Masking and Protection Materials Calculator](https://craftquantities.com/calculators/renovation-construction/masking-and-protection-calculator/)
- [Pipe Insulation Calculator](https://craftquantities.com/calculators/insulation-efficiency/pipe-insulation-calculator/)
- [Paint Calculator](https://craftquantities.com/calculators/renovation-construction/paint-calculator/)
- [Skip & Dumpster Size Calculator](https://craftquantities.com/calculators/auto-utility/skip-and-dumpster-size-calculator/)

## Not counted

- The heat-loss calculation and the system design: the boiler's output, the heat each room needs from its emitter, the pipe bores and the pump, which a designer or the engineer works out for the house. The site's heat-load and heat-output pages size them, and none is reached here.
- A hot-water cylinder changed or added, with its controls and its discharge pipe. Taking an old cylinder out for a combination boiler is listed; fitting a new one is a job of its own.
- The gas meter and the supply to it. An upsized or rerouted pipe from the meter to the boiler is listed as work; a larger meter or a new service is the gas supplier's or the network's.
- The commissioning record, the gas tightness test's paperwork and the building control notification themselves, and any fee for them. They come from the engineer and the scheme.
- Other fuel-burning appliances in the house: a gas fire, a back boiler behind it, an open-flued water heater or a cooker. They are checked by their own engineer; only the heating system is in this job.
- Radiators, valves, pipe, fittings and the flue as quantities. Each follows the design, so each is listed as work and none is measured; the lagging row counts only the pipe in cold spaces.
- Floor coverings lifted for pipe runs, and redecorating beyond the room the old boiler comes off.
- A change to a heat pump, which alters the emitters, the cylinder and the electrical supply and is a job of its own.

## Frequently asked questions

**What does the central heating replacement takeoff give for a typical job?**

Opened at Floor area of the rooms worked in 90 m² · Scaffold along the wall below the flue 0 m · Height to the flue's working platform 5 m · Pipe in cold spaces, each pipe counted 12 m · Room the old boiler comes off: length 4 m · Room the old boiler comes off: width 3 m · Room the old boiler comes off: floor to ceiling 2.4 m · Doors in that room 1 · Windows in that room 1 · Loose waste, as a depth over the floor worked in 15 mm, it orders: Dust sheets in the rooms worked in, 9 items; Lagging on pipes in cold spaces, 14 x 1 m sections; Wall paint, two coats, in one room, 6.05 L; Skip (dumpster) for what comes out, 1.35 m³. Opened at Floor area of the rooms worked in 970 sq ft · Scaffold along the wall below the flue 0 ft · Height to the flue's working platform 16.5 ft · Pipe in cold spaces, each pipe counted 39 ft · Room the old boiler comes off: length 13 ft · Room the old boiler comes off: width 10 ft · Room the old boiler comes off: floor to ceiling 8 ft · Doors in that room 1 · Windows in that room 1 · Loose waste, as a depth over the floor worked in 0.59 in: Dust sheets in the rooms worked in, 9 items; Lagging on pipes in cold spaces, 8 x 6 ft sections; Wall paint, two coats, in one room, 1.66 gal; Skip (dumpster) for what comes out, 1.77 yd³. Every figure follows the dimensions you give it.

**Which calculators does the central heating replacement takeoff run?**

4 calculators, one to a line: Masking and Protection Materials Calculator, Pipe Insulation Calculator, Paint Calculator, Skip & Dumpster Size Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.

**What does the central heating replacement takeoff leave out?**

8 things, each named on this page: The heat-loss calculation and the system design; A hot-water cylinder changed or added, with its controls and its discharge pipe; The gas meter and the supply to it; The commissioning record, the gas tightness test's paperwork and the building control notification themselves, and any fee for them; Other fuel-burning appliances in the house; Radiators, valves, pipe, fittings and the flue as quantities; Floor coverings lifted for pipe runs, and redecorating beyond the room the old boiler comes off; A change to a heat pump, which alters the emitters, the cylinder and the electrical supply and is a job of its own.

**Can I check a quote for this job against the takeoff?**

Yes. The central heating replacement quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/takeoff/central-heating-replacement` describes it; `https://api.craftquantities.com/v1/takeoff/central-heating-replacement/run` works it, measurements with their units.
- MCP: the `get_takeoff` and `run_takeoff` tools at https://api.craftquantities.com/mcp with `takeoff` `central-heating-replacement`.

---