> Turn a cellar or basement into a habitable room: strip it out, keep water out with a drained cavity membrane, a barrier coating or both, insulate and line the walls on studs or with boards, board the ceiling as a fire separation, finish and decorate, with any underpinning, lowering, new slab and escape window listed and never sized.

Page: https://craftquantities.com/build/basement-conversion/ (whole-job takeoff). This is the page's Markdown copy; the HTML page is the canonical version.

## Measurements

Each length, area or volume is entered with its unit; one left out opens at the figure shown.

| Measurement | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Length, wall to wall | `length` | 6 m | 19.5 ft | mm, cm, m, in, ft, yd |
| Width, wall to wall | `width` | 4 m | 13 ft | mm, cm, m, in, ft, yd |
| Height, floor to the joists above | `height` | 2.3 m | 7.5 ft | mm, cm, m, in, ft, yd |
| Lining depth, old wall to new face | `liningDepth` | 120 mm | 4.75 in | mm, cm, m, in, ft, yd |
| Doors | `doors` | 1 | 1 | a number |
| Windows | `windows` | 1 | 1 | a number |

- **Length, wall to wall**: Inside the cellar, between the faces of the old walls, before anything is lined.
- **Width, wall to wall**: Inside the cellar, between the faces of the old walls.
- **Height, floor to the joists above**: From the floor to the underside of the joists or slab overhead; where the floor is to be lowered, the height it will have once it is.
- **Lining depth, old wall to new face**: How far the finished wall stands in from the old one: the membrane or coating, any gap, the studs or insulation boards and the board over them, about 120 mm (4 3/4 in) on a stand-off stud wall. The room loses it on every side.
- **Doors**: Doors into the room, the one at the foot of the stair among them; each is taken off the lining and the paint at the drywall page's own 1.95 m² (21 sq ft).
- **Windows**: Windows in the walls, an escape window among them where there is one; each is taken off the lining and the paint at the drywall page's own 1.4 m² (15 sq ft).

## Build-up choices

| Choice | id | Options | Opens on (metric / US customary) |
|---|---|---|---|
| Floor | `floor` | The old slab kept (`kept`); Lowered, with a new slab on a stone bed (`new`) | `kept` / `kept` |
| Keeping water out | `waterproofing` | A cavity drain membrane, drained to a sump (Type C) (`drained`); A barrier coating, tanking (Type A) (`barrier`); Both: a barrier coating behind a drained membrane (`both`) | `drained` / `drained` |
| Wall lining | `walls` | A stud wall standing clear, insulated between the studs (`studs`); Insulation boards fixed to the walls (`boards`) | `studs` / `studs` |
| Walls and ceiling finish | `lining` | Board skimmed in plaster (`skim`); Drywall taped and finished (`taped`) | `skim` / `taped` |
| Floor finish | `finish` | Laminate or vinyl plank (`click`); Left for a covering chosen later (`other`) | `click` / `click` |

## Quantities on the opening figures

Worked as the takeoff page works them, each row by its own calculator.

### Metric

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Skip (dumpster) for the strip-out | 3.6 m³ |  | Skip & Dumpster Size Calculator |
| Drainage channel round the room's edge (interior drain tile) | 7 segments |  | Perimeter Weeping Tile Pipe Segment Calculator |
| Floor insulation boards, under the finished floor | 10 sheets (2400x1200 mm) |  | Foam Board Insulation Calculator |
| Studs or battens for the stand-off wall | 62 studs |  | Framing Stud Calculator |
| Insulation batts between the studs | 10 packages |  | Mineral Wool Insulation Batt Calculator |
| Ceiling board, the fire separation (plasterboard or drywall) | 9 sheets |  | Ceiling Plasterboard Calculator (Gypsum Board Sheets) |
| Drywall (plasterboard) on the new walls | 16 sheets |  | Ceiling Plasterboard Calculator (Gypsum Board Sheets) |
| Skim (finish plaster) over the new board | 179 kg |  | Skim Coat Plaster Calculator |
| Paint on the walls | 8.09 L |  | Paint Calculator |
| Paint on the ceiling | 4.33 L |  | Ceiling Paint Calculator |
| Laminate or vinyl plank floor | 11 packs |  | LVP, Laminate & Engineered Floor Calculator |
| Skirting (baseboard) | 20 m |  | Baseboard & Trim Calculator |

### US customary

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Skip (dumpster) for the strip-out | 4.62 yd³ |  | Skip & Dumpster Size Calculator |
| Drainage channel round the room's edge (interior drain tile) | 7 segments |  | Perimeter Weeping Tile Pipe Segment Calculator |
| Floor insulation boards, under the finished floor | 9 sheets (4x8 ft) |  | Foam Board Insulation Calculator |
| Studs or battens for the stand-off wall | 62 studs |  | Framing Stud Calculator |
| Insulation batts between the studs | 9 packages |  | Mineral Wool Insulation Batt Calculator |
| Ceiling board, the fire separation (plasterboard or drywall) | 8 sheets |  | Ceiling Plasterboard Calculator (Gypsum Board Sheets) |
| Drywall (plasterboard) on the new walls | 15 sheets |  | Ceiling Plasterboard Calculator (Gypsum Board Sheets) |
| Joint compound (mud) over the new board | 2 x 4.5 gal boxes |  | Drywall Joint Compound Calculator |
| Joint tape over the new board | 376 ft |  | Drywall Joint Tape Calculator |
| Paint on the walls | 2.14 gal |  | Paint Calculator |
| Paint on the ceiling | 1.14 gal |  | Ceiling Paint Calculator |
| Laminate or vinyl plank floor | 11 packs |  | LVP, Laminate & Engineered Floor Calculator |
| Skirting (baseboard) | 64.8 linear ft |  | Baseboard & Trim Calculator |

## Calculators it runs

- [Skip & Dumpster Size Calculator](https://craftquantities.com/calculators/auto-utility/skip-and-dumpster-size-calculator/)
- [Perimeter Weeping Tile Pipe Segment Calculator](https://craftquantities.com/calculators/materials-quantities/weeping-tile-segment-calculator/)
- [Foam Board Insulation Calculator](https://craftquantities.com/calculators/insulation-efficiency/foam-board-insulation-calculator/)
- [Framing Stud Calculator](https://craftquantities.com/calculators/renovation-construction/framing-stud-calculator/)
- [Mineral Wool Insulation Batt Calculator](https://craftquantities.com/calculators/materials-quantities/mineral-wool-batt-calculator/)
- [Ceiling Plasterboard Calculator (Gypsum Board Sheets)](https://craftquantities.com/calculators/materials-quantities/ceiling-plasterboard-sheet-calculator/)
- [Skim Coat Plaster Calculator](https://craftquantities.com/calculators/materials-quantities/skim-coat-plaster-calculator/)
- [Paint Calculator](https://craftquantities.com/calculators/renovation-construction/paint-calculator/)
- [Ceiling Paint Calculator](https://craftquantities.com/calculators/renovation-construction/ceiling-paint-calculator/)
- [LVP, Laminate & Engineered Floor Calculator](https://craftquantities.com/calculators/renovation-construction/resilient-flooring-calculator/)
- [Baseboard & Trim Calculator](https://craftquantities.com/calculators/renovation-construction/baseboard-trim-calculator/)
- [Drywall Joint Compound Calculator](https://craftquantities.com/calculators/renovation-construction/drywall-joint-compound-calculator/)
- [Drywall Joint Tape Calculator](https://craftquantities.com/calculators/renovation-construction/drywall-joint-tape-calculator/)

## Not counted

- Choosing the system and the grade: which kind of protection the room needs, and the grade its use calls for under BS 8102 in the UK or the code's dampproofing provisions in North America, are the designer's to decide. The page offers each system as a build-up, chooses none, and counts what the chosen one asks for.
- Underpinning, lowering the floor and the new slab's design: the engineer's scheme, the depth dug, the spoil from it and the old slab broken out are part of a provisional item, and the page stops at the formation level the new slab is laid on. A wall shared with a neighbour brings a party wall award in England and Wales.
- Anything done to the walls' outside face from a dig in the garden, such as a sheet bonded to it under a protection board: every row here works from inside the cellar.
- Radon. Where the house is in a radon-affected area in the UK, or a test under US EPA guidance finds a raised level, a barrier or a sump and fan beneath the floor is needed; no row covers it.
- Flood protection, and the pump's duty, a second pump or battery backup, and where the discharge goes, beyond listing the sump and pump as work.
- The stair's geometry, headroom and guarding, and the fire separation's specification: the stair, the handrail and guarding and the fire doors are listed as work where they are needed, and building control or the code sets each.
- Heating a room below ground: whether the boiler or heat pump can serve a circuit carried down the stair, and how large a radiator on a lined wall must be for a room with earth behind two or more of its walls, which the heating engineer works out.
- Moving a gas or electricity meter, the boiler or the consumer unit (service panel) out of the cellar.
- The floor's screed or floating board floor as a quantity, and where any vapour layer is placed: each follows the build-up the designer sets, and is listed as work.

## Frequently asked questions

**What does the basement conversion takeoff give for a typical job?**

Opened at Length, wall to wall 6 m · Width, wall to wall 4 m · Height, floor to the joists above 2.3 m · Lining depth, old wall to new face 120 mm · Doors 1 · Windows 1, it orders: Skip (dumpster) for the strip-out, 3.6 m³; Drainage channel round the room's edge (interior drain tile), 7 segments; Floor insulation boards, under the finished floor, 10 sheets (2400x1200 mm); Studs or battens for the stand-off wall, 62 studs; Insulation batts between the studs, 10 packages; Ceiling board, the fire separation (plasterboard or drywall), 9 sheets; Drywall (plasterboard) on the new walls, 16 sheets; Skim (finish plaster) over the new board, 179 kg; Paint on the walls, 8.09 L; Paint on the ceiling, 4.33 L; Laminate or vinyl plank floor, 11 packs; Skirting (baseboard), 20 m. Opened at Length, wall to wall 19.5 ft · Width, wall to wall 13 ft · Height, floor to the joists above 7.5 ft · Lining depth, old wall to new face 4.75 in · Doors 1 · Windows 1: Skip (dumpster) for the strip-out, 4.62 yd³; Drainage channel round the room's edge (interior drain tile), 7 segments; Floor insulation boards, under the finished floor, 9 sheets (4x8 ft); Studs or battens for the stand-off wall, 62 studs; Insulation batts between the studs, 9 packages; Ceiling board, the fire separation (plasterboard or drywall), 8 sheets; Drywall (plasterboard) on the new walls, 15 sheets; Joint compound (mud) over the new board, 2 x 4.5 gal boxes; Joint tape over the new board, 376 ft; Paint on the walls, 2.14 gal; Paint on the ceiling, 1.14 gal; Laminate or vinyl plank floor, 11 packs; Skirting (baseboard), 64.8 linear ft. Every figure follows the dimensions you give it.

**Which calculators does the basement conversion takeoff run?**

12 calculators, for 13 lines: Skip & Dumpster Size Calculator, Perimeter Weeping Tile Pipe Segment Calculator, Foam Board Insulation Calculator, Framing Stud Calculator, Mineral Wool Insulation Batt Calculator, Ceiling Plasterboard Calculator (Gypsum Board Sheets), Drywall Joint Compound Calculator, Drywall Joint Tape Calculator, Paint Calculator, Ceiling Paint Calculator, LVP, Laminate & Engineered Floor Calculator, Baseboard & Trim Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions. (US customary) / 11 calculators, for 12 lines: Skip & Dumpster Size Calculator, Perimeter Weeping Tile Pipe Segment Calculator, Foam Board Insulation Calculator, Framing Stud Calculator, Mineral Wool Insulation Batt Calculator, Ceiling Plasterboard Calculator (Gypsum Board Sheets), Skim Coat Plaster Calculator, Paint Calculator, Ceiling Paint Calculator, LVP, Laminate & Engineered Floor Calculator, Baseboard & Trim Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions. (metric)

**What does the basement conversion takeoff leave out?**

9 things, each named on this page: Choosing the system and the grade; Underpinning, lowering the floor and the new slab's design; Anything done to the walls' outside face from a dig in the garden, such as a sheet bonded to it under a protection board; Radon; Flood protection, and the pump's duty, a second pump or battery backup, and where the discharge goes, beyond listing the sump and pump as work; The stair's geometry, headroom and guarding, and the fire separation's specification; Heating a room below ground; Moving a gas or electricity meter, the boiler or the consumer unit (service panel) out of the cellar; The floor's screed or floating board floor as a quantity, and where any vapour layer is placed.

**Can I check a quote for this job against the takeoff?**

Yes. The basement conversion quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/takeoff/basement-conversion` describes it; `https://api.craftquantities.com/v1/takeoff/basement-conversion/run` works it, measurements with their units.
- MCP: the `get_takeoff` and `run_takeoff` tools at https://api.craftquantities.com/mcp with `takeoff` `basement-conversion`.

---
Source: https://craftquantities.com/build/basement-conversion/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.