# Air-source heat pump replacing a boiler takeoff

> Replace a boiler with an air-source heat pump (a heat pump, in North America) on the wet system it heated: dust sheets where radiators and pipes change, lagging on the flow and return outside and in cold spaces, and the waste, with the heat-loss design, the base, the unit, the hot-water cylinder (water heater tank), the larger radiators, the flush, the circuit and its isolator (disconnect), the controls and the commissioning listed and never certified.

Page: https://craftquantities.com/build/air-source-heat-pump/ (whole-job takeoff). This is the page's Markdown copy; the HTML page is the canonical version.

## Measurements

Each length, area or volume is entered with its unit; one left out opens at the figure shown.

| Measurement | id | Opens at (metric) | Opens at (US customary) | Accepts |
|---|---|---|---|---|
| Floor of the rooms where radiators or pipes change | `floorArea` | 60 m² | 650 sq ft | m2, ft2, mm2, in2 |
| From the outdoor unit to the house wall, one way | `outdoorRoute` | 3 m | 10 ft | mm, cm, m, in, ft, yd |
| Pipe through cold spaces indoors, each pipe counted | `coldSpacePipe` | 8 m | 26 ft | mm, cm, m, in, ft, yd |
| Loose waste, as a depth over those rooms | `wasteDepth` | 12 mm | 0.5 in | mm, cm, m, in, ft, yd |

- **Floor of the rooms where radiators or pipes change**: Each room where a radiator is replaced with a larger one, added or has its pipes altered, the cupboard the cylinder goes in, and the room the old boiler leaves. The dust sheets and the waste follow it.
- **From the outdoor unit to the house wall, one way**: The run the flow and return take outside, from the unit's connections to where they go through the wall. Both pipes are lagged, so the lagging row takes this twice.
- **Pipe through cold spaces indoors, each pipe counted**: Heating pipe, and the primary pipe to the cylinder, that crosses a loft, an unheated floor void or a garage on its way; a flow and a return side by side are twice the route. The defrost water's pipe is not in this length: it is lagged with its own run.
- **Loose waste, as a depth over those rooms**: The loose volume the changeover makes for each square metre (square foot) of the rooms you gave: the old boiler, the radiators replaced, an old cylinder and loft tanks where they go, cut pipe, and the crates the unit and the cylinder arrive in. 12 mm over 60 m² is 0.72 m³; 1/2 in over 650 sq ft is about 1 cubic yard.

## Quantities on the opening figures

Worked as the takeoff page works them, each row by its own calculator.

### Metric

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Dust sheets over the floors the work crosses | 6 items |  | Masking and Protection Materials Calculator |
| Lagging outside and in cold spaces | 16 x 1 m sections |  | Pipe Insulation Calculator |
| Skip (dumpster) or a waste collection | 0.72 m³ |  | Skip & Dumpster Size Calculator |

### US customary

| Item | Quantity | Order | Calculator |
|---|---|---|---|
| Dust sheets over the floors the work crosses | 6 items |  | Masking and Protection Materials Calculator |
| Lagging outside and in cold spaces | 9 x 6 ft sections |  | Pipe Insulation Calculator |
| Skip (dumpster) or a waste collection | 1 yd³ |  | Skip & Dumpster Size Calculator |

## Calculators it runs

- [Masking and Protection Materials Calculator](https://craftquantities.com/calculators/renovation-construction/masking-and-protection-calculator/)
- [Pipe Insulation Calculator](https://craftquantities.com/calculators/insulation-efficiency/pipe-insulation-calculator/)
- [Skip & Dumpster Size Calculator](https://craftquantities.com/calculators/auto-utility/skip-and-dumpster-size-calculator/)

## Not counted

- The heat-loss survey and the design drawn from it: the unit's output and running temperature, which rooms need a bigger panel, the pipe bores and the hot store's size. One listed item, the designer's; no sizing page is reached here.
- The grant itself, and the MCS scheme a UK grant rests on, which the installer or the household applies to.
- Planning permission, and the noise condition England's permitted-development rules set, or a local noise rule or permit elsewhere. The noise check on where the unit stands is part of the listed design; the permission itself is not in this job.
- Increasing the house's supply or main fuse (service), where the supply check finds it too small: that is the network operator's or the utility's work. Telling them of the new load is listed.
- Fabric work a design may ask for first, such as loft or wall insulation, draught-proofing or new windows, each a job of its own.
- Taking out an oil tank or bottled LPG, a gas fire or a back boiler, or a whole stack; capping the open flue the old boiler used is listed.
- A new cupboard or enclosure round the hot-water store, and strengthening the floor under it, whose weight is flagged.
- The tariff the unit runs on, a new meter, and any export or time-of-use deal with the energy supplier.
- Temporary or portable heaters for the household meanwhile, and its baths and showers taken elsewhere until the new store is hot.
- Cooling, by an air-to-air or ducted system, is another job; the mini-split takeoff covers one room's.

## Frequently asked questions

**What does the air-source heat pump takeoff give for a typical job?**

Opened at Floor of the rooms where radiators or pipes change 60 m² · From the outdoor unit to the house wall, one way 3 m · Pipe through cold spaces indoors, each pipe counted 8 m · Loose waste, as a depth over those rooms 12 mm, it orders: Dust sheets over the floors the work crosses, 6 items; Lagging outside and in cold spaces, 16 x 1 m sections; Skip (dumpster) or a waste collection, 0.72 m³. Opened at Floor of the rooms where radiators or pipes change 650 sq ft · From the outdoor unit to the house wall, one way 10 ft · Pipe through cold spaces indoors, each pipe counted 26 ft · Loose waste, as a depth over those rooms 0.5 in: Dust sheets over the floors the work crosses, 6 items; Lagging outside and in cold spaces, 9 x 6 ft sections; Skip (dumpster) or a waste collection, 1 yd³. Every figure follows the dimensions you give it.

**Which calculators does the air-source heat pump takeoff run?**

3 calculators, one to a line: Masking and Protection Materials Calculator, Pipe Insulation Calculator, Skip & Dumpster Size Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.

**What does the air-source heat pump takeoff leave out?**

10 things, each named on this page: The heat-loss survey and the design drawn from it; The grant itself, and the MCS scheme a UK grant rests on, which the installer or the household applies to; Planning permission, and the noise condition England's permitted-development rules set, or a local noise rule or permit elsewhere; Increasing the house's supply or main fuse (service), where the supply check finds it too small; Fabric work a design may ask for first, such as loft or wall insulation, draught-proofing or new windows, each a job of its own; Taking out an oil tank or bottled LPG, a gas fire or a back boiler, or a whole stack; capping the open flue the old boiler used is listed; A new cupboard or enclosure round the hot-water store, and strengthening the floor under it, whose weight is flagged; The tariff the unit runs on, a new meter, and any export or time-of-use deal with the energy supplier; Temporary or portable heaters for the household meanwhile, and its baths and showers taken elsewhere until the new store is hot; Cooling, by an air-to-air or ducted system, is another job; the mini-split takeoff covers one room's.

**Can I check a quote for this job against the takeoff?**

Yes. The air-source heat pump quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.

## Run it from a program

- REST: `GET https://api.craftquantities.com/v1/takeoff/air-source-heat-pump` describes it; `https://api.craftquantities.com/v1/takeoff/air-source-heat-pump/run` works it, measurements with their units.
- MCP: the `get_takeoff` and `run_takeoff` tools at https://api.craftquantities.com/mcp with `takeoff` `air-source-heat-pump`.

---
Source: https://craftquantities.com/build/air-source-heat-pump/
Craft Quantities: free to read, cite and link to; the pages are not licensed for republication. Quantities only: no prices, no design and no certification.